Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
Tender Value
₹8.0 L
EMD Value
₹20,000
Closing Date
1 Oct 2020, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer NH Division Hassan
Office of EE NH Division Hassan
Providing patching of pot holes and rebuilding of scoured shoulders from Km 24.600 to km 26.300 existing chainage of NH-173 Mudigere-Kadur section
2020_MoRTH_584160_1
EE/NHD/HSN/MR-2/NIT09/202021/6
Open Tender
Civil Works - Roads
Item Rate
30 days
Mudigere
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,180
RPAO, Bangalore
₹20,000
3 Oct 2020
16 Sept 2020
3 Oct 2020
16 Sept 2020
1 Oct 2020
16 Sept 2020
16 Sept 2020 - 24 Sept 2020
90 days
Amount
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness including all labour, hire charges of all machineries etc., complete. as per ministrial norms, guidelines, the direction and instructions of engineer in charge of work. In area of thorny jungle by mechanical means
Removal of unserviceable soil with hydraulic excavator 0.9 cum bucket capacity including excavation, loading in tippers, unloading, disposal including all lead and lifts, labour, hire charges of all machineries etc., complete, as per ministrial norms, guidelines, the direction and instructions of engineer in charge of work.
Dismantling of flexible pavements and disposal of dismantled materials,stacking serviceable and unserviceable materials separately including all labour, hire charges of all machineries etc., complete. as per ministrial norms, guidelines, the direction and instructions of engineer in charge of work. By Manual Means A) Bituminous courses
Construction of Wet Mix Macadum by providing laying, spreading and compacting of graded stone aggregates as per Table 400-11, mixing in a Wet mix plant of 75 tonne capacity at OMC, carriage of mixed material to work site in tipper to paver, laid over a previously prepared surface to the required grade, level and alignment, compacting with vibratory roller 8-10 tonne to achieve the desired density of 98% including protection of edges of WMM layer, cost of all materials, labour, hire charges of machinery, lighting, guarding, barricading, maintenance of diversion road, loading & unloading, all lead and lift etc., complete.as per ministrial norms, guidelines, the direction and instructions of engineer in charge of work. By using Motor Grader
Providing and applying primer coat with slow setting bitumen emulsion (SS1) complying with IS 8887 of approved quality and make on prepared surface of granular Base such as WBM, WMM including cleaning of road surface by Mechanical Broom & dusting by Air compressor, and spraying using Bitumen Pressure Distributor, uniformly at the rate of 0.80 kg/sqm as per Table 500-3, including cost of all materials, labour, hire charges of machinery, loading, unloading etc., complete as per ministrial norms, guidelines, the direction and instructions of engineer in charge of work.,
Providing and applying Tack Coat as per Table 500-2 on prepared surface using 80/100 grade Bitumen complying with IS 8887 of approved quality and make including cleaning of road surface by Mechanical Broom & dusting by Air compressor, and spraying by Bitumen Pressure Distributor, including cost of all materials, labour, hire charges of machinery, loading, unloading stacking, etc complete, as per ministrial norms, guidelines, the direction and instructions of engineer in charge of work., Using 80/100 grade Bitumen (VG-10)
Providing and laying Dense Graded Bituminous Macadam using crushed aggregates as per table 500-10 of specified graded aggregates and filler (Cement) @ 2% by weight of aggregates, premixed with bituminous binder 60/70 Grade (VG-30)in hot mix plant, loading of aggregates with F.E. loader, transported to site in tipper to paver, laid over a previously prepared surface with Hydraustatic Paver Finisher with sensor control to the required grade, level, alignment, rolling with Smooth wheeled roller 8-10 tonnes, vibratory roller 8 tonnes, smooth wheeled tandem roller 6-8 tonnes as per clauses 501.6 and 501.7 to achieve the desired compaction, including cost of all materials, labour, hire charges of machinery, lead, lifts, loading, unloading, stacking, transporting etc complete, as per ministrial norms, guidelines, the direction and instructions of engineer in charge of work Using 40-60 TPH hot mix plant ii) 50 - 75 mm compacted thickness (Grading 2) with 4.50% Bitumen
Providing and laying Bituminous Concrete using crushed stone aggregates as per table 500-17 of specified graded aggregates and filler (Cement) @ 2% by weight of aggregates premixed with bituminous binder in hot mix plant, loading of aggregates with F.E. loader, transported to site in tipper to paver, laid over a previously prepared surface with Hydraustatic Paver Finisher with sensor control to the required grade, level, alignment, rolling with Smooth wheeled roller 8-10 tonnes, vibratory roller 8 tonnes, smooth wheeled tandem roller 6-8 tonnes as per clauses 501.6 and 501.7 to achieve the desired compaction, including cost of all materials, labour, hire charges of machinery, lead, lifts, loading, unloading, stacking, transporting etc complete, as per ministrial norms, guidelines, the direction and instructions of engineer in charge of work. Using 40-60 TPH HMP ii) Grading 2 with 5.4% Bitumen (30 - 40 mm compacted thickness) a) Using 60/70 Grade Bitumen.
Making up loss of material / irregularities on shoulder to the design level by adding fresh approved soil upto 150mm excavated by excavator, carriage by tipper and compacting it with plate compactor including cost of all materials, labour, hire charges of machinery, loading, unloading, lead lift etc., complete.as per ministrial norms, guidelines, the direction and instructions of engineer in charge of work.
SRUSHTI LAND DEVELOPERS AND CONTRACTOR
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .