Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.5 LAdmitted-Finance BUS STAND BINA BINA 231220 UTTAR PRADESH INDIA | BINA | SONBHADRA | UTTAR PRADESH | 231220 | ₹17.5 L | L1 | Admitted-Finance |
| 2 | Rejected-Technical KOTA BASTI SHAKTINAGAR P O SHAKTINAGAR DISTT SONBHADRA U P 231222 | SONBHADRA | UTTAR PRADESH | 231222 | - | - | Rejected-Technical Changed proprietor |
| Sl No | Description | Qty | Unit | M/S DURGA ENTERPRISES L1 |
|---|---|---|---|---|
| 1.00Scope of Work/Technical Specifications etc. 1. Up keeping, cleaning work of 88.8 sqm area (22.20 sqm area/day/machine) of machine housing, operator cabin, undercarriage track chain and rollers mud etc. of 04 Nos. Hydraulic shovels (BE700, Tata Hitachi ZX650H SL No.001166 and PC2000-8 SL No.1 & 2) working at Khadia project for a period of 365Days. 2. Material handling of lubricants barrels, loading and unloading of 04 Nos. Hydraulic shovels (BE700, Tata Hitachi ZX650H SL No.001166 and PC2000-8 SL No.1 & 2) and 02 nos. Surface Miners working at Khadia project for a period of 365Days. 3. Assistance in repair and maintenance work in all the three shifts including general shift of 02 nos. Surface miners, running under MARC. Note: Maximum deployment of manpower for the above scope of work likely to be 1. Semi-Skilled for 730 nos. of manshift & Un-Skilled for 2555 nos. of manshifts. Standard terms & conditions- All the safety materials (safety helmet, safety shoes, gloves and other safety equipment’s) are to be provided / arranged by the contractor. | ||||
| 2.00 | Labour charges for Material Handling & Cleaning Works of Hydraulic Shovels and Surface Miners as per scope of work including contractor profit. | 1 | Job | 8,76,000 ₹8,76,000 Lowest |
| 3.00 | Labour charges for assstance in maintenance and repair work of 02 nos Surface miners running Under MARC including contractor profit. | 1 | Job | 8,76,000 ₹8,76,000 Lowest |
| 4.00 | Total impact of GST for the purpose of CTC | 1 | No. | - |
Tender Value
₹25.0 L
EMD Value
₹31,300
Closing Date
22 Jun 2026, 11:00 amClosed
GENERAL MANAGER EXCAVATION, NCL KHADIA PROJECT
NCL KHADIA PROJECT, SHAKTINAGAR, SONEBHADRA, U.P. - 231222
Outsourcing of Assistance for Maintenance and Repair of 02 Nos. Surface Miners working under MARC and Material Handling and Cleaning Works of Hydraulic Shovels and Surface Miners at Khadia Project for 365 Days.
2026_NCL_360846_1
KHD/G.M. (Excv)/E-Tender/26-27/ 200
Open Tender
Excavation Department Work
Item Rate
365 days
NCL KHADIA PROJECT, SHAKTINAGAR
Please refer Tender documents.
6 documents required · 6 mandatory
₹31,300
4 Sept 2026
5 Jun 2026
23 Jun 2026
5 Jun 2026
22 Jun 2026
6 Jun 2026
5 Jun 2026 - 13 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Scope of Work/Technical Specifications etc.
1. Up keeping, cleaning work of 88.8 sqm area (22.20 sqm area/day/machine) of machine housing, operator cabin, undercarriage track chain and rollers mud etc. of 04 Nos. Hydraulic shovels (BE700, Tata Hitachi ZX650H SL No.001166 and PC2000-8 SL No.1 & 2) working at Khadia project for a period of 365Days.
2. Material handling of lubricants barrels, loading and unloading of 04 Nos. Hydraulic shovels (BE700, Tata Hitachi ZX650H SL No.001166 and PC2000-8 SL No.1 & 2) and 02 nos. Surface Miners working at Khadia project for a period of 365Days.
3. Assistance in repair and maintenance work in all the three shifts including general shift of 02 nos. Surface miners, running under MARC.
Note: Maximum deployment of manpower for the above scope of work likely to be 1. Semi-Skilled for 730 nos. of manshift & Un-Skilled for 2555 nos. of manshifts.
Standard terms & conditions-
All the safety materials (safety helmet, safety shoes, gloves and other safety equipment’s) are to be provided / arranged by the contractor. | - | - | - | - |
| 2 | Labour charges for Material Handling & Cleaning Works of Hydraulic Shovels and Surface Miners as per scope of work including contractor profit. | 1 | Job | 8,92,936 | ₹8,92,936 |
| 3 | Labour charges for assstance in maintenance and repair work of 02 nos Surface miners running Under MARC including contractor profit. | 1 | Job | 12,26,195 | ₹12,26,195 |
| 4 | Total impact of GST for the purpose of CTC | 1 | No. | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.32 MB
COC_ATC.pdf
Tender Documents • 1.44 MB
ITB.pdf
Tender Documents • 0.38 MB
BOQ_373721.xls
BOQ • 0.33 MB
Annexures.pdf
Tender Documents • 0.80 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .