Loading…
Loading…
Tender Value
₹2 L
EMD Value
₹4,000
Closing Date
31 Aug 2026, 4:00 pm4d left
Executive Engineer Hydraulic Division Gurez
Executive Engineer Hydraulic Division Gurez
Providing Water Supply to Medical Centre PTL including restoration of Supply main
2026_PWDJK_322032_1
3rd call PHE E-NIT No 10 of 2026-27 Hyd-Grz-422-28 E-tendering Dated-22-08-2026
Open Tender
Civil Works
Percentage
30 days
Gurez
Please refer Tender documents.
3 documents required · 3 mandatory
₹200
Executive Engineer Hydraulic Division Gurez
₹4,000
Executive Engineer Hydraulic Division Gurez
24 Aug 2026
24 Aug 2026
1 Sept 2026
24 Aug 2026
31 Aug 2026
24 Aug 2026
27 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:All kinds of soil : | 89.04 | Cum | 479.3 | ₹42,676.87 |
| 1.01 | Ordinary Rock. | 22.26 | Cum | 924.8 | ₹20,586.05 |
| 2 | Dismantling G.I. pipes (external work) including excavation and refilling trenches after taking out the pipes, manually/by mechanical means including stacking of pipes within 50 meters lead as per direction of Engineer-in-charge :Above 40 mm nominal bore | 180 | RM | 121.65 | ₹21,897 |
| 3 | Laying and fitting of G.I/HDPE Pipes (all classes)complete excluding cost of pipes ,fittings and earth work.63mm Dia HDPE Pipe. | 400 | RM | 37.8 | ₹15,120 |
| 3.01 | 50mm/40mm Dia HDPE/GI(Available at site) | 180 | RM | 29.2 | ₹5,256 |
| 3.02 | 25mm Dia HDPE Pipe. | 50 | RM | 14.1 | ₹705 |
| 4 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. Layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering lead upto 50m and lift upto 1.5m. | 71.23 | Cum | 218.4 | ₹15,556.63 |
| 5 | Add Cost of Pipe Specials and fittings complete job.(To be paid as per actual ). | 1 | Job | 5,000 | ₹5,000 |
| 6 | Carriage of Materials by Mechanical Transport including loading,unloading and Stacking complete.Pipes(steel) with an avg.lead 100km. | 0.43 | MT | 1,393.88 | ₹599.37 |
| 7 | Add Cost of Pipes
63mm Dia HDPE Pipe with Specification ISI Marked High Density Polyethlene Pipes for Drinking water works confirming to IS:4984-2016 with uptodate amendations for material grade PE 100 and Pressurre Rating PN 12.5,with SDR11 of following nominal diametres in length with tolerance as per relevent IS Code. | 400 | RM | 180 | ₹72,000 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.88 MB
BOQ_1077266.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].