| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.7 LAccepted-Finance | L1 | Accepted-Finance Less Estimate Amount | |
| 2 | L2₹5.0 L+₹24,663.04 (5.22%)Rejected-Finance | L2 | Rejected-Finance Above Estimate Amount | |
| 3 | L3₹5.0 L+₹29,076.78 (6.15%)Rejected-Finance | L3 | Rejected-Finance Above Estimate Amount |
Tender Value
₹5.1 L
EMD Value
₹6,000
Closing Date
16 Apr 2025, 3:00 pmClosed
BDO(V.P) Tiruvallur block
BDO Office Tiruvallur block
Construction of Compound Wall at Manalerikandigai Samathuva BG in Melakondaiyar Panchayat 50 m Tiruvallur Block
2025_RDTN_539510_1
4498/2024/A3 Date . 04.04.2025
Open Tender
Civil Works
Item Wise
180 days
BDO Office Tiruvallur block
Class V and Above
5 documents required · 5 mandatory
₹0
₹6,000
Yes
23 Jun 2025
7 Apr 2025
16 Apr 2025
7 Apr 2025
16 Apr 2025
7 Apr 2025
Amount
1.Construction of Compound Wall at Manalerikandigai Samathuva BG in Melakondaiyar Panchayat 50 m
Earth work Excavation in all classes of soils except hard rock in Hard Ordinary soil with initial lead and lift including all other charges and labour charges etc,.
Filling with river sand for foundation and basement filling including cost and conveyance and all labour charges and materials charges etc..
C.C 1:4:8 Mix Using 40mm ISS HBG Metal including cost and conveyance and all materials and all labour charges etc,.Completed.
Supply and Fabrication of steel including cost and conveyance of all materials to site and all labour charges for placing in position etc,..completed..
Supply and errecting for centering including cost and conveyance and labour charges with materials charges with MS sheet completed
Below Base
Above Base
RCC 1:1.5:3 Mix using 20mm HBG metal including cost and conveyance and all labour charges and materials charges completed..
Below Base
Above Base
Brick work in CM 1:5 mix using country Bricks including cost and conveyance of all materials to site mixing, placing,curing and all labour charges etc,..
Plastering in CM 1:5 Mix using 12mm thick including cost and conveyance and all lab our charges and materials charges completed..
Painting two coats with Exterior/interior first quality Emulsion of approved colour over one coat of primer including cost and conveyance and all lab our charges and materials charges completed..
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
V.N.S.ENTERPRISES (BID ID -1301843)
M/S. SRI RAJALAKSHMI RNTERPRISES (BID ID -1290595)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .