Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹95.1 CrAccepted-AOC SC 326 SHASTRI NAGAR GHAZIABAD | GHAZIABAD | UTTAR PRADESH | 201001 | ₹95.1 Cr | L1 | Accepted-AOC aoc |
| 2 | L2₹99.6 Cr+₹4.5 Cr (4.71%)Rejected-Finance 2 560 GOMTI NAGAR VIRAM KHAND LUCKNOW | LUCKNOW | LUCKNOW | UTTAR PRADESH | 226010 | ₹99.6 Cr+₹4.5 Cr (4.71%) | L2 | Rejected-Finance R |
| 3 | L3₹99.8 Cr+₹4.7 Cr (4.92%)Rejected-Finance | ₹99.8 Cr+₹4.7 Cr (4.92%) | L3 | Rejected-Finance R |
| 4 | L4₹108.5 Cr+₹13.4 Cr (14.1%)Rejected-Finance | ₹108.5 Cr+₹13.4 Cr (14.1%) | L4 | Rejected-Finance R |
| 5 | L5₹109.0 Cr+₹13.9 Cr (14.6%)Rejected-Finance FLAT NO 5 IIND FLOOR IIIRD B 2 NEHRU NAGAR GHAZIABAD UP 201001 | GHAZIABAD | GHAZIABAD | UTTAR PRADESH | 201001 | ₹109.0 Cr+₹13.9 Cr (14.6%) | L5 | Rejected-Finance R |
| Sl No | Description | Qty | Unit | SIDDHARTH CONSTRUCTION L11 | S and P Infrastructure Developers Pvt. Ltd. L12 | G.S. EXPRESS PVT. LTD. L6 | BHARDWAJ UNIBUILD PRIVATE LIMITED L10 | JSP PROJECTS PVT LTD L5 | M/S ANMOL ASSOCIATES L8 | SHARMA CONSTRUCTION PROJECT PVT LTD L1 | M/s Nirbhay Constructions L3 | AMBE INFRAPROJECTS PRIVATE LIMITED L2 | MAA Aadi Shakti Infrabuild India Pvt. Ltd. L7 | R.K.TRADERS & CONSTRUCTION PRIVATE LIMITED L9 | S S Infrazone Pvt Ltd L4 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Cleaning and grubbing road land including uprooting rank vegitation grass, buses, shrubs, sapling and trees grit upto 300mm , removal of stumps of tree cut earliar and disposal of unserviceable material to be used or auction , upto a lead of 1000 M including removal and disposal of top organic soil not exceeding 150 mm in thickness . (Complete in all aspects Excluding GST but Including of all other taxes, Labour Cess, labour and T&P etc.) | 1,85,000 | Sqm | 14 ₹25,90,000 | 14 ₹25,90,000 | 16 ₹29,60,000 | 5 ₹9,25,000 | 13 ₹24,05,000 | 14 ₹25,90,000 | 2 ₹3,70,000 Lowest | 2 ₹3,70,000 Lowest | 10 ₹18,50,000 | 14 ₹25,90,000 | 11 ₹20,35,000 | 12.07 ₹22,32,950 |
| 2.00 | Removal (including stacking and proper handling over to concerned Authority) of stumps and roots of trees having girth 300mm and backfilling the pit created to required compaction complete as per technical specifications clause 201 and 305, or as directed by the engineer, for girth size above 300mm (Complete in all aspects Excluding GST but Including of all other taxes, Labour Cess, labour and T&P etc.) | 990 | Nos | 860 ₹8,51,400 | 860 ₹8,51,400 | 2,575 ₹25,49,250 | 750 ₹7,42,500 | 2,000 ₹19,80,000 | 860 ₹8,51,400 | 2 ₹1,980 Lowest | 500 ₹4,95,000 | 750 ₹7,42,500 | 860 ₹8,51,400 | 680 ₹6,73,200 | 734.41 ₹7,27,065.9 |
| 3.00 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres (Complete in all aspects Excluding GST but Including of all other taxes, Labour Cess, labour and T&P etc.) | 12,600 | Cum | 618 ₹77,86,800 | 615 ₹77,49,000 | 1,236 ₹1,55,73,600 | 555 ₹69,93,000 | 750 ₹94,50,000 | 618 ₹77,86,800 | 300 ₹37,80,000 Lowest | 300 ₹37,80,000 Lowest | 450 ₹56,70,000 | 615 ₹77,49,000 | 490 ₹61,74,000 | 527.53 ₹66,46,878 |
| 4.00 | Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m (Complete in all aspects Excluding GST but Including of all other taxes, Labour Cess, labour and T&P etc.)(Complete in all aspects Excluding GST but Including of all other taxes, Labour Cess, labour and T&P etc.) | 12,000 | Cum | 48 ₹5,76,000 | 480 ₹57,60,000 | 257.5 ₹30,90,000 | 380 ₹45,60,000 | 75 ₹9,00,000 | 48 ₹5,76,000 | 50 ₹6,00,000 | 20 ₹2,40,000 Lowest | 40 ₹4,80,000 | 48 ₹5,76,000 | 38 ₹4,56,000 | 41.38 ₹4,96,560 |
| 5.00 | Removal of unserviceable soil including excavation, loading and disposal upto 10 km lead but excluding replacement by suitable soil which shall be paid seperatelyas per clause 305 (Complete in all aspects Excluding GST but Including of all other taxes, Labour Cess, labour and T&P etc.) | 2,900 | Cum | 95 ₹2,75,500 | 92 ₹2,66,800 | 154.5 ₹4,48,050 | 85 ₹2,46,500 | 300 ₹8,70,000 | 95 ₹2,75,500 | 50 ₹1,45,000 | 40 ₹1,16,000 Lowest | 80 ₹2,32,000 | 95 ₹2,75,500 | 75 ₹2,17,500 | 81.03 ₹2,34,987 |
| 6.00 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement density not less than 97% of desired proper density by GMF as Approved By Competent Authority cof table 300-2. ( lead not less than10 km) (Complete in all aspects Excluding GST but Including of all other taxes, Labour Cess, labour and T&P etc.) | 1,15,300 | Cum | 226 ₹2,60,57,800 | 221 ₹2,54,81,300 | 257.5 ₹2,96,89,750 | 210 ₹2,42,13,000 | 325 ₹3,74,72,500 | 226 ₹2,60,57,800 | 50 ₹57,65,000 Lowest | 210 ₹2,42,13,000 | 200 ₹2,30,60,000 | 225 ₹2,59,42,500 | 200 ₹2,30,60,000 | 193.08 ₹2,22,62,124 |
| 7.00 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. (Complete in all aspects Excluding GST but Including of all other taxes, Labour Cess, labour and T&P etc.) | 9,000 | Cum | 62 ₹5,58,000 | 60 ₹5,40,000 | 154.5 ₹13,90,500 | 45 ₹4,05,000 | 325 ₹29,25,000 | 62 ₹5,58,000 | 50 ₹4,50,000 | 40 ₹3,60,000 Lowest | 50 ₹4,50,000 | 62 ₹5,58,000 | 51 ₹4,59,000 | 52.58 ₹4,73,220 |
| 8.00 | Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits area lead not less than 10 Km with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to 97% proctor density requirement of table No. 300-2 MORTH specification no. 305 (Complete in all aspects Excluding GST but Including of all other taxes, Labour Cess, labour and T&P etc.) | 15,750 | Cum | 235 ₹37,01,250 | 231 ₹36,38,250 | 257.5 ₹40,55,625 | 210 ₹33,07,500 | 375 ₹59,06,250 | 235 ₹37,01,250 | 100 ₹15,75,000 Lowest | 220 ₹34,65,000 | 210 ₹33,07,500 | 235 ₹37,01,250 | 200 ₹31,50,000 | 193.08 ₹30,41,010 |
| 9.00 | Dismantling of Granular pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately (Complete in all aspects Excluding GST but Including of all other taxes, Labour Cess, labour and T&P etc.) | 10,000 | Cum | 66 ₹6,60,000 | 64 ₹6,40,000 | 206 ₹20,60,000 | 45 ₹4,50,000 | 325 ₹32,50,000 | 65 ₹6,50,000 | 300 ₹30,00,000 | 40 ₹4,00,000 Lowest | 60 ₹6,00,000 | 65 ₹6,50,000 | 56 ₹5,60,000 | 56.89 ₹5,68,900 |
| 10.00 | Construction of granular sub-base by providing coarse graded material (Grade-1), spreading in uniform layers with motor grader on prepared surface,stacking dismentaled material to mixing with rotavator at OMC, and compacting with vibratory roller to achieve the desired density , complete as per clause 401. (Excluding Cost of Materials) (Complete in all aspects Excluding GST but Including of all other taxes, Labour Cess, labour and T&P etc.) | 10,000 | Cum | 178 ₹17,80,000 | 175 ₹17,50,000 | 206 ₹20,60,000 | 165 ₹16,50,000 | 5,000 ₹5,00,00,000 | 178 ₹17,80,000 | 175 ₹17,50,000 | 100 ₹10,00,000 Lowest | 150 ₹15,00,000 | 178 ₹17,80,000 | 150 ₹15,00,000 | 152.57 ₹15,25,700 |
Tender Value
₹129.9 Cr
EMD Value
₹1.3 Cr
Closing Date
7 Mar 2026, 12:00 pmClosed
O/F SUPRINTENDING ENGINEER BASTI CIRCLE PWD BASTI
O/F SUPRINTENDING ENGINEER BASTI CIRCLE PWD BASTI
Financial year 2025-26 work of Widening and Strengthening of Bardpur Piprahwa Road (ODR) For the Development of North South Corridor in the in 04 Lanes in Siddharthnagar District
2026_CEUBZ_1116516_1
843/4 E NIVIDA-BASTI CIRCLE/2026 DATE 06.02.2026
Open Tender
Civil Works
Item Rate
540 days
BASTI
AS PER SBD
2 documents required · 2 mandatory
₹6,255
Yes
₹1.3 Cr
O/F SUPRINTENDING ENGINEER BASTI CIRCLE PWD BASTI
27 May 2026
20 Feb 2026
7 Mar 2026
20 Feb 2026
7 Mar 2026
20 Feb 2026
20 Feb 2026 - 26 Feb 2026
23 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cleaning and grubbing road land including uprooting rank vegitation grass, buses, shrubs, sapling and trees grit upto 300mm , removal of stumps of tree cut earliar and disposal of unserviceable material to be used or auction , upto a lead of 1000 M including removal and disposal of top organic soil not exceeding 150 mm in thickness . (Complete in all aspects Excluding GST but Including of all other taxes, Labour Cess, labour and T&P etc.) | 1,85,000 | Sqm | 1.25 | ₹2,31,250 |
| 2 | Removal (including stacking and proper handling over to concerned Authority) of stumps and roots of trees having girth 300mm and backfilling the pit created to required compaction complete as per technical specifications clause 201 and 305, or as directed by the engineer, for girth size above 300mm (Complete in all aspects Excluding GST but Including of all other taxes, Labour Cess, labour and T&P etc.) | 990 | Nos | - | - |
| 3 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres (Complete in all aspects Excluding GST but Including of all other taxes, Labour Cess, labour and T&P etc.) | 12,600 | Cum | 100 | ₹12,60,000 |
| 4 | Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m (Complete in all aspects Excluding GST but Including of all other taxes, Labour Cess, labour and T&P etc.)(Complete in all aspects Excluding GST but Including of all other taxes, Labour Cess, labour and T&P etc.) | 12,000 | Cum | 53 | ₹6,36,000 |
| 5 | Removal of unserviceable soil including excavation, loading and disposal upto 10 km lead but excluding replacement by suitable soil which shall be paid seperatelyas per clause 305 (Complete in all aspects Excluding GST but Including of all other taxes, Labour Cess, labour and T&P etc.) | 2,900 | Cum | 10 | ₹29,000 |
| 6 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement density not less than 97% of desired proper density by GMF as Approved By Competent Authority cof table 300-2. ( lead not less than10 km) (Complete in all aspects Excluding GST but Including of all other taxes, Labour Cess, labour and T&P etc.) | 1,15,300 | Cum | 11 | ₹12,68,300 |
| 7 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. (Complete in all aspects Excluding GST but Including of all other taxes, Labour Cess, labour and T&P etc.) | 9,000 | Cum | 10 | ₹90,000 |
| 8 | Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits area lead not less than 10 Km with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to 97% proctor density requirement of table No. 300-2 MORTH specification no. 305 (Complete in all aspects Excluding GST but Including of all other taxes, Labour Cess, labour and T&P etc.) | 15,750 | Cum | 22 | ₹3,46,500 |
| 9 | Dismantling of Granular pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately (Complete in all aspects Excluding GST but Including of all other taxes, Labour Cess, labour and T&P etc.) | 10,000 | Cum | - | - |
| 10 | Construction of granular sub-base by providing coarse graded material (Grade-1), spreading in uniform layers with motor grader on prepared surface,stacking dismentaled material to mixing with rotavator at OMC, and compacting with vibratory roller to achieve the desired density , complete as per clause 401. (Excluding Cost of Materials) (Complete in all aspects Excluding GST but Including of all other taxes, Labour Cess, labour and T&P etc.) | 10,000 | Cum | - | - |
stage.html
html • 0.08 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.26 MB
SBD.pdf
Tender Documents • 4.92 MB
BOQ_2078081.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .