Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.4 CrAccepted-AOC MIRZAPUR UTTAR PRADESH | ₹5.4 Cr | L1 | Accepted-AOC L1 |
| 2 | Rejected-Technical MOHAL WARD NO 10 ROBERTSGANJ SONBHADRA | SONBHADRA | UTTAR PRADESH | 231205 | - | - | Rejected-Technical Non-Responsive |
Tender Value
₹7.4 Cr
EMD Value
₹14.7 L
Closing Date
27 Feb 2024, 12:00 pmClosed
SE MZP Circle pwd Mirzapur
SE MZP Circle pwd Mirzapur
General Repair and Renewal with PC on MMBCB marg ke KM 17 se Chattisgadh border tak vaya Lilasi Kudari Dhankhor Sagobandh Manrutola (ODR). 5 Years Maintenance
2024_CEUVZ_900820_1
619/53 M-MZP Circle/24 Date-08.02.2024
Open Tender
Civil Works
Item Rate
240 days
Sonebhadra
As per NIT
3 documents required · 3 mandatory
₹2,720
₹14.7 L
Yes
15 Apr 2024
20 Feb 2024
27 Feb 2024
20 Feb 2024
27 Feb 2024
20 Feb 2024
Providing and applying tack coat with bitumen vg-10 using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/ granular surface cleaned with mechanical broom.
Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an avarage output of 75 tonne per hour using crushed aggregates of specified grading premixed with bituminous binder @ 5.4 percent of mix and filler , transporting the hot mix to work site , laying with hydostatic paver finisher with sensor control to the required grade , level and aligmnment , rolling with smooth wheeled , vibratory and tendom roller to achieve the desired compaction as per MoRT&H Specification Clause 507 complete in all respects.
Providing and laying of hot applied thermo plastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area thickness of 2.5 mm is exclusive of surface applied glass bed as perIRC 35 inclduing cost of all materials , labour , Machinaries , T&P etc. requared for peoper completion of work i/c all other charges and taxes . The finishied surface to be level uniform and free from streks and holes as per MORTH specification no. 803
Construction of patari and shoulder with approved material obtained from borrow pits with a lift upto 1.50 m and 30 meter lead, spreading, grading to required slope and compacting to meet requirement of tables 300.1 and 300.2 as per techanical specification clause 301.5
The routine maintenance of above road work including embankment, patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) for 1st year maintenance cost (Zero pracent)
The routine maintenance of above road work including embankment, patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) for 2nd year maintenance cost (1.5%)
The routine maintenance of above road work including embankment, patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) for 3d year maintenance cost (3%)
The routine maintenance of above road work including embankment, patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) for 4th year maintenance cost (4.5%)
The routine maintenance of above road work including embankment, patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T&P labour but excluding GST) for 5th year maintenance cost (6%)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .