| 1 | L1₹10.8 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹16.5 L+₹5.7 L (52.9%)Rejected-Finance | L2 | Rejected-Finance Other than L1 |
Tender Value
₹20 L
EMD Value
₹40,000
Closing Date
4 Sept 2024, 6:00 pmClosed
GE (AF) SIRSA
GE (AF) SIRSA, HARYANA-125055
REPAIR/MAINT TO RUNWAY/PTT SHOULDERS AREA WITH GRASS CUTTING SHOULDERS LEVELLING SGA PLAUGHING ETC AT AF STN SIRSA
2024_MES_662928_2
GE/SRA/T-44/2024-25
Open Tender
Miscellaneous Works
Item Rate
240 days
GE (AF) SIRSA
PLEASE REFER TENDER DOCUMENTS
8 documents required · 8 mandatory
₹500
GE (AF) SIRSA
₹40,000
Yes
23 Sept 2024
23 Jul 2024
5 Sept 2024
23 Jul 2024
4 Sept 2024
23 Jul 2024
Amount
Cutting of Grass Shurbs, Weeds, Bushes, Vegetations, etc. with the help of Bush Cutting Machine including small trees girth up to 30cm along the Sides of Runway, PTT, Links, etc. including collecting and disposing all waste, trimmings etc outside AF land as required, complete all as specified and as directed. NOTES: (1) The height of grass shrubs, weeds, bushes, vegetation etc should not exceed 200mm after cutting and it shall measured in Pocket wise which includes cutting of edges in drain/PTT/ any area other than grass surfaces. (2) Measurement for payment shall made be after execution of above mentioned requirement in pocket wise. (3) Pocket/Task area shall be as decided and directed by Engineer in Charge. (4) Proper record shall be maintained wrt location & date of execution of work. (5) Disposal of waste is deemed to be included in quoted rates. Contractor shall ensure immediate removal of all waste materials after cutting, trimming etc under his own arrangement and dispose off outside AF land as per Municipal Corporation/State Govt regulations. (6) Contractor shall ensure that the waste/trims are not blown on runways, PTT, links etc and shall depute labourers for immediate cleaning/sweeping & removal from site to avoid FOD. Contractor's quoted rate shall be deemed to be inclusive of the above aspect.
All as per item No. 01 here-in-before but with the help of Jungle Jim Tractor.
Scraping of grass shurbs, weeds, bushes, vegetation etc manually at ground level including removal of small irregularities in natural ground & levelling including collecting and disposing all waste, trimmings etc outside AF land as required, complete all as specified and as directed by the Engineer-in-Charge. NOTES : (1) This item is intended for narrow stretch or location which is inaccessible by machines. Measurement for this item shall be considered upto a max width of 75cm. (2) Proper record shall be maintained wrt location & date of execution of work. (3) Disposal of waste is deemed to be included in quoted rates. Contractor shall ensure immediate removal of all waste materials after cutting, trimming etc under his own arrangement and dispose off outside AF land as per Municipal Corporation/State Govt regulations.
Ploughing of SGA not less than 30 cm in depth using plant & its connecting tools required for ploughing including breaking of soil lumps, levellling and finishing complete all as specified and directed.
M&L for bringing suitable earth from outside AF land for filling in shoulders, berms etc alongside Runway, PTT, Links etc., spreading in layers not exc 30 cm thick watering, ramming & rolling with 5 to 10 tonne power roller and finishing to required level camber and gradient, shape etc complete and all as per directed by Engineer-in-Charge. NOTES :- (1) Earth required for embankment/filling shall be of approved quality and shall be brought from outside the AF land by contractor under his own arrangement. No extra shall be admissible on this account. (2) Quoted rate shall be deemed to included for all labour required for excavation, removing the soil, loading and unloading, making temporary profiles, levelling etc. (3) Density of finished earth in embankment, bers etc shall be as directed by GE/Engr-in-Charge. (4) Necessacry deduction for voids in terms of Para 3.6 on Ser page No 21 of SSR Part-II, 2020 (Rates) shall be carried out from the finished quantity of earthwork. Contractor's quoted rate shall be deemed to be inclusive of the above aspect and no claim shall be entertained at a later date in this regard.
VIVEK CONSTRUCTION CO (BID ID -3082450)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .