| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹86.5 LAccepted-AOC | L1 | Accepted-AOC L1 Bidder | |
| 2 | L2₹87.1 L+₹58,771 (0.68%)Rejected-AOC | L2 | Rejected-AOC L2 Bidder |
| Sl No | Description | Qty | Unit | AKSHYA SIRPAKALAI H1 | V.Anbukarasu H2 |
|---|---|---|---|---|---|
| 1.00For Renovation Works | |||||
| 2.00Providing Scaffolding charges for Vimanams and Gopurams with casurina posts coconut or palm trees wherever necessary for main, form work and providing with net lawn/PVC mesh coverings, providing ladder arrangements, country wood plank for working, inspection etc. complete, hire charges only for erection, maintenance and removing the same on completion of the work. etc complete complying with standard specification and as directed by departmental officers. (TNBP. Specification.No : Special) | |||||
| 2.01 | 5 tier raja gopuram and karudazhvar sannathy upto 15'0" | 180 | 1 M2 (One Square Metre) | 285 ₹51,300 | 280 ₹50,400 Lowest |
| 2.02 | Perumal sannathy upto 25'0" | 156 | 1 M2 (One Square Metre) | 380 ₹59,280 | 375 ₹58,500 Lowest |
| 2.03 | Gopuram upto 50'0" | 550 | 1 M2 (One Square Metre) | 485 ₹2,66,750 | 482 ₹2,65,100 Lowest |
| 3.00 | Scraping the old plastering surface of vimanams/ wall carefully including isolated bricks or brick work without damaging the vari vargams, racking out the joints, cleaning the surfaces with water including all working in heights, hire charges for special tools, brushes etc complete complying with standard specification and as directed by the departmental officers. (TNBP. Specification.No : Special) | 1,537 | 1 M2 (One Square Metre) | 5 ₹7,685 | 4 ₹6,148 Lowest |
| 4.00Providing Vargapoochu over the corewalls of Vimanams / Gopurams, with Lime Mortor1:1.5 ( One of lime and one & half of sand ) with special grinding with gallnut jaggary etc complete including shaping the mukhapathram, mahanasi, Koodu all ornamentals works to proper shape by embedding broken bricks of shaped/chiseled bricks, rough-plastering with Lime Mortor1:1.5 ( One of lime and one & half of sand ) and finishing with final ornamental plastering and nayam theervai including cost and conveyance of all materials, labour therefore, lifting of materials, all working in heights, curing with water etc, complete including all extra for folding and including clearing from the vimanams/gopurams 100sft superficial area. etc.complete complying with standard specifications and as directed by the departmental officers. (The lime used should be sourced from Pollachi which is highly iron fortified and suitable for structural and masonry works.)(TNBP. Specification.No : Special) | |||||
| 4.01 | Raja gopuram upto 50'0" | 45 | 1 M2 (One Square Metre) | 7,805 ₹3,51,225 | 7,800 ₹3,51,000 Lowest |
| 4.02 | Perumal sannathy upto 25'0" | 14 | 1 M2 (One Square Metre) | 5,440 ₹76,160 | 5,435 ₹76,090 Lowest |
| 4.03 | Karudar and Anjaneyar Sannathy upto 15'0" | 2 | 1 M2 (One Square Metre) | 4,140 ₹8,280 | 4,135 ₹8,270 Lowest |
Tender Value
₹86.8 L
EMD Value
₹54,000
Closing Date
10 Jan 2025, 2:00 pmClosed
Inspector
Inspector office Arulmigu Pesum perumal Thirukkoil, Kuzhamanthal Village, Cheyyar Taluk, Tiruvannamalai District
Repairs and Renovation of Arulmigu Pesum perumal Thirukkoil, Kuzhamanthal Village, Cheyyar Taluk, Tiruvannamalai District
2024_HRCE_511571_1
19/2024-2025
Open Tender
Civil Works
Lump-sum
Kuzhamanthal Village, Cheyyar Taluk
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹54,000
29 Sept 2026
17 Dec 2024
10 Jan 2025
17 Dec 2024
10 Jan 2025
17 Dec 2024
Amount
For Renovation Works
Providing Scaffolding charges for Vimanams and Gopurams with casurina posts coconut or palm trees wherever necessary for main, form work and providing with net lawn/PVC mesh coverings, providing ladder arrangements, country wood plank for working, inspection etc. complete, hire charges only for erection, maintenance and removing the same on completion of the work. etc complete complying with standard specification and as directed by departmental officers. (TNBP. Specification.No : Special)
5 tier raja gopuram and karudazhvar sannathy upto 15'0"
Perumal sannathy upto 25'0"
Gopuram upto 50'0"
Scraping the old plastering surface of vimanams/ wall carefully including isolated bricks or brick work without damaging the vari vargams, racking out the joints, cleaning the surfaces with water including all working in heights, hire charges for special tools, brushes etc complete complying with standard specification and as directed by the departmental officers. (TNBP. Specification.No : Special)
Providing Vargapoochu over the corewalls of Vimanams / Gopurams, with Lime Mortor1:1.5 ( One of lime and one & half of sand ) with special grinding with gallnut jaggary etc complete including shaping the mukhapathram, mahanasi, Koodu all ornamentals works to proper shape by embedding broken bricks of shaped/chiseled bricks, rough-plastering with Lime Mortor1:1.5 ( One of lime and one & half of sand ) and finishing with final ornamental plastering and nayam theervai including cost and conveyance of all materials, labour therefore, lifting of materials, all working in heights, curing with water etc, complete including all extra for folding and including clearing from the vimanams/gopurams 100sft superficial area. etc.complete complying with standard specifications and as directed by the departmental officers. (The lime used should be sourced from Pollachi which is highly iron fortified and suitable for structural and masonry works.)(TNBP. Specification.No : Special)
Raja gopuram upto 50'0"
Perumal sannathy upto 25'0"
Karudar and Anjaneyar Sannathy upto 15'0"
Earthwork excavation for foundation in all soils and sub soils to full depth as may be directed except in hard rock requiring blasting inclusive of shoring shuttering, baling out water wherever necessary, refilling the foundation with excavated earth and depositing the surplus earth within compound in places shown by the departmental officers with an initial lead of 10 metre and initial lift of 2 metre and clearing and leveling the site etc., complete complying with standard specification and as directed by the departmental officers. (TNBP. Specification.No : 23)
Weathering course in brick jelly lime concrete using broken brick jelly of size 20mm uniform gauge in pure slaked lime (no crushed stone sand to be used) to the proportion of brick jelly to lime being 32:12.5 by volume and laid over the RCC roof slab in a single layer of required slope and finished by beating the concrete with wooden beaters of approved pattern, keeping the surface constantly wet by sprinkling lime jaggery water, etc., complete as per standard specification and as directed by the deparmental officers.(TNBP. Specification.No : 44 )
Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Lime Mortar 1:1.5 (One of Lime and One & half of M.sand)12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers.(TNBP. Specification.No : 44-H)
Supplying and filling in foundation, basement, etc with filling crushed stone sand ( M.Sand) in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. (TNBP. Specification.No : 24&25 )
Supplying & Paving flooring with cut stone of size 600 mm X 600 mm and another sizes suitable for site conditions with machine cut edges and not less than 100mm thick and fully dressed as directed by the departmental officers,and set in Lime Mortar 1:1.5 (One of Lime and One & half of M.sand) and pointing with Lime Mortar 1:1.5 (One of Lime and One & half of M.sand) including cost and conveyance of all materials etc., complete Complying with standard specifications. and directed by the departmental officers (The lime used should be sourced from Pollachi which is highly iron fortified and suitable for structural and masonry works.)(TNBP. Specification.No : 4&35 and special )
Painting two coats of newly plastered wall surface withWater based Exterior emulsion paint of first class quality and of approved colour over one coat of priming coat with approved primer including thorough scrapping, clean removal of dirt etc., and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification and as directed by the departmental officers.(The make, quality ,shade and colour of paint should be got approved by the Executive Engineer before use on works.) (TNBP. Specification.No : 66 & 66-A)
Painting two coats to old wood work with two finishing coats of synthetic enamel ready mixed paint of approved quality and colour over one coat of priming coat with approved premier in all floors including the cost of primer etc., complete complying with standard specification and as directed by departmental officers. (The make, quality ,shade and colour of paint should be got approved by the Executive Engineer before use on works.)(TNBP. Specification.No : 66&66-A )
Painting two coats of new iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with of best approved first quality and colour of synthetic enamel paint over with one coat of priming coat with approved primer in all floors etc., complete complying with standard specification. (The make, quality ,shade and colour of paint should be got approved by the Executive Engineer before use on works.)(TNBP. Specification.No : 66&66-A )
For Construction of Vinayagar Sannathy
Earth work excavation for foundation (for narrow excavation) in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification. (TNBP. Specification.No : 23)
Supplying and filling in foundation, basement, etc with filling crushed stone sand ( M.Sand) in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. (TNBP. Specification.No : 24&25 )
Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification and as directed by the departmental officers. .(TNBP. Specification.No : 28 )
Providing and laying in position, standardised concrete Mix M-20 Grade in accordance with IS 456 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 325 kg/m3 and maximum water cement ratio of 0.55, including admixture (plasticiser / super plasticiser) in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability with about (5 cu.m.) 7730 kg. of 20mm machine crushed stone jelly and with about (3.3 cu.m.) 5156 kg. of 10-12mm machine crushed stone jelly and with about (4.79 cu.m) 7670 kg. of crushed stone sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor/ roof slabs wherever necessary without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS standards. (No separate payment will be made by the Department for the excess usage of materials). (TNBP. Specification.No : 30)
Upto basement
For Super Structure
Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid) (TNBP. Specification.No : similar to 72 & 86)
Plain Surface
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire).(TNBP. Specification.No : 86 & 86-A)
Ornamental Brick work in Lime Mortar 1:2 ( One of lime and Two of M.sand ) using country bricks 8 3/4"X4 1/4"X2 3/4" all varivargams, moulds, sthambams, mukapathrams, koodu, nasi and all ornamental brick work complete, all pancharams, agarais, karnakoodus, etc., forming core walls of Rajagopuram/ Vimanams complete including cost and conveyance of all materials including cement, all the labour charges including marking pathies shaping of the bricks, lifting of all the materials to required heights, curing and all extra for working in heights etc., complete (The lime used should be sourced from Pollachi which is highly iron fortified and suitable for structural and masonry works.) (TNBP. Specification.No : 31)
For Kalkaram
For Vimanam
Providing Vargapoochu over the corewalls of Vimanams / Gopurams, with Lime Mortor1:1.5 ( One of lime and one & half of sand ) with special grinding with gallnut jaggary etc complete including shaping the mukhapathram, mahanasi, Koodu all ornamentals works to proper shape by embedding broken bricks of shaped/chiseled bricks, rough-plastering with Lime Mortor1:1.5 ( One of lime and one & half of sand ) and finishing with final ornamental plastering and nayam theervai including cost and conveyance of all materials, labour therefore, lifting of materials, all working in heights, curing with water etc, complete including all extra for folding and including clearing from the vimanams/gopurams 100sft superficial area. etc.complete complying with standard specifications and as directed by the departmental officers. (TNBP. Specification.No : Special)
For Kalkaram
For Vimanam
Plastering with Combination Mortar1:1:5 (One of cement , One of Lime and Five Plastering sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.(TNBP. Specification.No : 52&53)
Special ceiling plastering and finishing the exposed surface of all RCC items of work such as slabs, beams, sunshades, facia, canopy slab, staircase waist slab, landing slab etc., with Cement Mortar 1:3 (One Cement and Three Plastering Sand) 10mm thick including hacking the surfaces, providing cement mortar nosing, beading for sunshades, staircases, steps, landing slabs and curing, etc., in all floors complying with standard specification and as directed by the departmental officers (TNBP. Specification.No : 52&53)
Supplying & fixing best quality well seasoned Teak wood temple type ornamental door in verious sizes and required height with 2'' minimum and 7'' maximum thick ornamental frames as per approved palns and design including all materials, labour charges for manufacturing and fixing in position including all furniture fittings etc complete complying with standard specifications and as directed by the departmental officials (TNBP. Specification.No : similar to 72&74 )
Supplying & Paving flooring with cut stone of size 600 mm X 600 mm and another sizes suitable for site conditions with machine cut edges and not less than 100mm thick and fully dressed as directed by the departmental officers,and set in Lime Mortar 1:1.5 (One of Lime and One & half of M.sand) and pointing with Lime Mortar 1:1.5 (One of Lime and One & half of M.sand) including cost and conveyance of all materials etc., complete Complying with standard specifications. and directed by the departmental officers (The lime used should be sourced from Pollachi which is highly iron fortified and suitable for structural and masonry works.)(TNBP. Specification.No : 4&35 and special )
Painting two coats of newly plastered wall surface withWater based Exterior emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt etc., and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification and as directed by the departmental officers.(The make, quality ,shade and colour of paint should be got approved by the Executive Engineer before use on works.) (TNBP. Specification.No : 66 & 66-A)
Painting with multi colour ( Panchavaranam ) using good water base exterior emulsion paint over a priming coat with approved premeir etc., complete for the vimanam and gopuram for ornamental works including cost and conveyance of all materials labour charges including artist painter working in heights , lifting materials cost of brushes etc. which including allextra for foldingsetc complete complying with standard specification and as directed by the departmental officers all etc for folding 100 sft.( The brand ,colour,shade and quality of paint should be got approved by the Executive Engineer before use on works ) (TNBP. Specification.No : 66 & 66-A)
Painting two coats to new wood work with two finishing coats of synthetic enamel ready mixed paint of approved quality and colour over one coat priming coat with approved premier in all floors including the cost of primer etc., complete complying with standard specification and as directed by departmental officers. (The make, quality ,shade and colour of paint should be got approved by the Executive Engineer before use on works.)(TNBP. Specification.No : 66&66-A )
Providing Scaffolding charges for Vimanams and Gopurams with casurina posts coconut or palm trees wherever necessary for main, form work and providing with net lawn/PVC mesh coverings, providing ladder arrangements, country wood plank for working, inspection etc. complete, hire charges only for erection, maintenance and removing the same on completion of the work. etc complete complying with standard specification and as directed by departmental officers. (TNBP. Specification.No : Special)
Providing new sudhai vigrahams in the vimanams and Rajagopurams with Copper rod reinforcement of suitable dia with binding wires wherever necessary, shaping the core with broken bricks set in lime morter 1:1.5 ( one lime ,one and half M.sand ) finishing the same with lime morter 1:1.5 ( one lime ,one and half M.sand ) bringing to the correct shape (Lakshana) in conformist with silpa sastra inclusive of special ornaments, weapons, peedam etc., complete and providing C.M. Nayam theervai wherever necessary. inclusive of cost and conveyance of all materials, such as cement broken bricks, and Copper rods. binding wire all labour for working in heights, curing lifting of materials etc., complete including Exterior Emulsion painting 2 coats over a primary coat (one vigraham is accountable with one head, 4 hands with weapons, ornamental costumes etc., as per prathima lakshans, Vigraham height is measurable from the crown top to the bottom of foot only If peetam is provided the rate with peetam may be adopted as detailed hereunder) (TNBP. Specification.No : Special)
Size of 2'-6: to 3'-6"
For Construction of Alangara Mandabam
Earth work excavation for foundation (for narrow excavation) in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification. (TNBP. Specification.No : 23)
Supplying and filling in foundation, basement, etc with filling crushed stone sand ( M.Sand) in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. (TNBP. Specification.No : 24&25 )
Supplying and FILLING GRAVEL Supplying and filling in 'foundation and basement with filling crushed stone sand in layers of not more than 15cm.thick well rammed watered and compacted -1m3 etc., complete complying with standard specification and as directed by the departmental officers. (TNBP. Specification.No : 24&25 )
Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification .(TNBP. Specification.No : 28 )
Providing and laying in position, standardised concrete Mix M-20 Grade in accordance with IS 456 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 325 kg/m3 and maximum water cement ratio of 0.55, including admixture (plasticiser / super plasticiser) in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability with about (5 cu.m.) 7730 kg. of 20mm machine crushed stone jelly and with about (3.3 cu.m.) 5156 kg. of 10-12mm machine crushed stone jelly and with about (4.79 cu.m) 7670 kg. of crushed stone sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor/ roof slabs wherever necessary without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS standards. (No separate payment will be made by the Department for the excess usage of materials). (TNBP. Specification.No : 30)
For Foundation and Basement
For Super Structure
Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid) (TNBP. Specification.No : similar to 72 & 86)
For Plain Surface
For Column
For Roof beam & Slab
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire).(TNBP. Specification.No : 86 & 86-A)
Providing Vargapoochu over the corewalls of Vimanams / Gopurams, with Lime Mortor1:1.5 ( One of lime and one & half of sand ) with special grinding with gallnut jaggary etc complete including shaping the mukhapathram, mahanasi, Koodu all ornamentals works to proper shape by embedding broken bricks of shaped/chiseled bricks, rough-plastering with Lime Mortor1:1.5 ( One of lime and one & half of sand ) and finishing with final ornamental plastering and nayam theervai including cost and conveyance of all materials, labour therefore, lifting of materials, all working in heights, curing with water etc, complete including all extra for folding and including clearing from the vimanams/gopurams 100sft superficial area. etc.complete complying with standard specifications and as directed by the departmental officers. (TNBP. Specification.No : Special)
For Pillars
For Height upto 15'0"
Brick Work in Combination Mortar 1:1:5 (one of Cement, one of lime & Five sand) using best quality of country bricks of size 8 3/4"x4 1/4"x 2 3/4" including neat finishing curing etc., complete complying with standard specification and as directed by the departmental officers.(TNBP. Specification.No : 31-C)
Plastering with Combination Mortar1:1:5 (One of cement , One of Lime and Five Plastering sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.(TNBP. Specification.No : 52&53)
Special ceiling plastering and finishing the exposed surface of all RCC items of work such as slabs, beams, sunshades, facia, canopy slab, staircase waist slab, landing slab etc., with Cement Mortar 1:3 (One Cement and Three Plastering Sand) 10mm thick including hacking the surfaces, providing cement mortar nosing, beading for sunshades, staircases, steps, landing slabs and curing, etc., in all floors complying with standard specification and as directed by the departmental officers (TNBP. Specification.No : 52&53)
Supplying & Paving flooring with cut stone of size 600 mm X 600 mm and another sizes suitable for site conditions with machine cut edges and not less than 100mm thick and fully dressed as directed by the departmental officers,and set in Lime Mortar 1:1.5 (One of Lime and One & half of M.sand) and pointing with Lime Mortar 1:1.5 (One of Lime and One & half of M.sand) including cost and conveyance of all materials etc., complete Complying with standard specifications. and directed by the departmental officers (The lime used should be sourced from Pollachi which is highly iron fortified and suitable for structural and masonry works.)(TNBP. Specification.No : 4&35 and special )
Painting two coats of newly plastered wall surface withWater based Exterior emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt etc., and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification and as directed by the departmental officers.(The make, quality ,shade and colour of paint should be got approved by the Executive Engineer before use on works.) (TNBP. Specification.No : 66 & 66-A)
Painting with multi colour ( Panchavaranam ) using good water base exterior emulsion paint over a priming coat with approved premeir etc., complete for the vimanam and gopuram for ornamental works including cost and conveyance of all materials labour charges including artist painter working in heights , lifting materials cost of brushes etc. which including allextra for foldingsetc complete complying with standard specification and as directed by the departmental officers.( The brand ,colour,shade and quality of paint should be got approved by the Executive Engineer before use on works ) (TNBP. Specification.No : 66 & 66-A)
Weathering course in brick jelly lime concrete using broken brick jelly of size 20mm uniform gauge in pure slaked lime (no crushed stone sand to be used) to the proportion of brick jelly to lime being 32:12.5 by volume and laid over the RCC roof slab in a single layer of required slope and finished by beating the concrete with wooden beaters of approved pattern, keeping the surface constantly wet by sprinkling lime jaggery water, etc., complete as per standard specification and as directed by the deparmental officers.(TNBP. Specification.No : 44 )
Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Lime Mortar 1:1.5 (One of Lime and One & half of M.sand)12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers.(TNBP. Specification.No : 44-H)
SUB TOTAL
V.Anbukarasu (BID ID -1227225)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .