| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.1 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹4.3 L+₹14,555 (3.53%)Rejected-Finance | L2 | Rejected-Finance Reject |
| Sl No | Description | Qty | Unit | SM INFRASTRUCTURE AND DEVELOPMENT L2 | NANDAKUMAR ENTERPRISES L1 |
|---|---|---|---|---|---|
| 1.00 | Dismantling the Existing Road Surface including cost and conveyance of all materials and labour charges etc completeBT Road | 36 | Cum | 950 ₹34,200 | 929 ₹33,444 Lowest |
| 2.00 | Earth work excavation in all classes of soil except sand and rock such as hard stiff clay black cootn shales murrams hard red earth etc with all lead and lift and depositing on banks as per ss 20 B etc complete 90mm PVC pipe | 600 | Mtr | 200 ₹1,20,000 | 194 ₹1,16,400 Lowest |
| 3.00 | Supply and Fixing of 6kSC 90mm Pvc pipe Including cost and conveyance of all materials and Labour charges etc complete | 600 | Mtr | 150 ₹90,000 | 142 ₹85,200 Lowest |
| 4.00 | Lowering of 90 mm dia PVC pipes and specials including all labour charges for laying and jointing of pipes to proper alignment and gradient et complete TWAD SOR -2022-23 | 600 | Mtr | 25 ₹15,000 | 22 ₹13,200 Lowest |
| 5.00 | Supply and delivery of PVC specials including cost and conveyance and handling labour charges etc complete 90mm PVC Elbow | 10 | Nos | 110 ₹1,100 | 104 ₹1,040 Lowest |
| 6.00 | 90 mm PVC Coupler | 10 | Nos | 38 ₹380 | 34 ₹340 Lowest |
| 7.00 | 90mm PVC End Cap | 10 | Nos | 30 ₹300 | 29 ₹290 Lowest |
| 8.00 | Refilling of excavated excess earth from work site to 2Km away with including loading charges conveyance charges etc complete as per specifications 90mm pvc pipe | 600 | Mtr | 30 ₹18,000 | 26 ₹15,600 Lowest |
| 9.00 | Replacement of Underground Utilities (PVC Pipe) damaged
during earthwork excavation for pipe laying works including cost of additional earthwork excavation in all soil strata, including BT/CC road cutting, removal of slushy soil and replacing the pipeline with sound pipe, including supply and delivery of PVC pipes, couplers, jointing materials and required specials, cutting, conveying, laying, jointing and cost of refilling for the additional earthwork etc complete and as directed by the TWAD board officers. | 300 | Mtr | 330 ₹99,000 | 327 ₹98,100 Lowest |
| 11.00 | Supply and Fixing of Sluice Valve including cost and conveyance of all materials and labour charges etc complete. 100mm Dia | 7 | Nos | 7,000 ₹49,000 | 6,973 ₹48,811 Lowest |
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
6 May 2025, 3:00 pmClosed
The Commissioner TCMC
Muthulingam Street
Replacement of Pvc Pumping Main Line at Malavika Avenue in Tambaram City Municipal Corporation.
2025_DMA_554435_6
003/2025/E1/Z5
Open Tender
Civil Works
Works
180 days
East Tambaram Zone 5
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹5,000
15 Oct 2025
5 May 2025
6 May 2025
5 May 2025
6 May 2025
5 May 2025
Amount
Dismantling the Existing Road Surface including cost and conveyance of all materials and labour charges etc completeBT Road
Earth work excavation in all classes of soil except sand and rock such as hard stiff clay black cootn shales murrams hard red earth etc with all lead and lift and depositing on banks as per ss 20 B etc complete 90mm PVC pipe
Supply and Fixing of 6kSC 90mm Pvc pipe Including cost and conveyance of all materials and Labour charges etc complete
Lowering of 90 mm dia PVC pipes and specials including all labour charges for laying and jointing of pipes to proper alignment and gradient et complete TWAD SOR -2022-23
Supply and delivery of PVC specials including cost and conveyance and handling labour charges etc complete 90mm PVC Elbow
90 mm PVC Coupler
90mm PVC End Cap
Refilling of excavated excess earth from work site to 2Km away with including loading charges conveyance charges etc complete as per specifications 90mm pvc pipe
Replacement of Underground Utilities (PVC Pipe) damaged during earthwork excavation for pipe laying works including cost of additional earthwork excavation in all soil strata, including BT/CC road cutting, removal of slushy soil and replacing the pipeline with sound pipe, including supply and delivery of PVC pipes, couplers, jointing materials and required specials, cutting, conveying, laying, jointing and cost of refilling for the additional earthwork etc complete and as directed by the TWAD board officers.
Supply and Fixing of Sluice Valve including cost and conveyance of all materials and labour charges etc complete. 100mm Dia
SM INFRASTRUCTURE AND DEVELOPMENT (BID ID -1330612)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_662082.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .