| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.4 LAccepted-AOC | ₹6.4 L | L1 | Accepted-AOC L1 |
| 2 | L2₹6.8 L+₹37,213.04 (5.77%)Rejected-Finance | ₹6.8 L+₹37,213.04 (5.77%) | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | Sivaraman L2 | Kumanan Krishnasamy L1 |
|---|---|---|---|---|---|
| 1.01Construction of 2.0m span RCC Slab Culvert @ Ponniamman kovil road in Vallimaduram panchayat | |||||
| 1.02 | Earth work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil for pipeline | 38.61 | cu.m | 270 ₹10,424.7 | 263 ₹10,154.43 Lowest |
| 1.03 | M.Sand filling with good M.sand including all cost and conveyance of all materials and all labour charges etc., complete. | 4.46 | cu.m | 2,100 ₹9,366 | 2,019 ₹9,004.74 Lowest |
| 1.04 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete | 6.83 | cu.m | 5,900 ₹40,297 | 5,836 ₹39,859.88 Lowest |
| 1.05 | Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using Country wood props & Scantlings complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete for BGL | 83.16 | Sqm | 550 ₹45,738 | 547.5 ₹45,530.1 Lowest |
| 1.06 | Supplying and erecting centering shuttering including necessary supports all materials to site and proper centering etc complete. (Above GL) | 43.78 | Sqm | 1,100 ₹48,158 | 1,095 ₹47,939.1 Lowest |
| 1.07 | Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete | 43.52 | cu.m | 6,200 ₹2,69,824 | 6,143 ₹2,67,343.36 Lowest |
| 1.08 | Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete | 5.29 | cu.m | 7,300 ₹38,617 | 7,238 ₹38,289.02 Lowest |
| 1.09 | RCC 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete | 4.83 | cu.m | 10,000 ₹48,300 | 9,741 ₹47,049.03 Lowest |
| 1.10 | Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works. | 750 | Kg | 91 ₹68,250 Lowest | 91 ₹68,250 Lowest |
Tender Value
₹6.5 L
EMD Value
₹6,500
Closing Date
25 Nov 2025, 3:00 pmClosed
Block Development Officer(B.Pt), Mangalur
Block Development Officer(B.Pt), Mangalur
Construction of 2m span RCC Slab Culvert at Vallimaduram ponniamman kovil road in Vallimaduram
2025_RDTN_625616_1
A2/1557/2025 GF
Open Tender
Civil Works
Item Rate
Construction of 2m span RCC Slab Culvert at Vallim
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹6,500
23 Sept 2026
22 Nov 2025
25 Nov 2025
22 Nov 2025
25 Nov 2025
22 Nov 2025
Amount
Construction of 2.0m span RCC Slab Culvert @ Ponniamman kovil road in Vallimaduram panchayat
Earth work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil for pipeline
M.Sand filling with good M.sand including all cost and conveyance of all materials and all labour charges etc., complete.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using Country wood props & Scantlings complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete for BGL
Supplying and erecting centering shuttering including necessary supports all materials to site and proper centering etc complete. (Above GL)
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
RCC 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Sivaraman (BID ID -1519689)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
BOQ_748118.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .