Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
26 Nov 2022, 9:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Block Development Officer (V.P)
Avudaiyarkoil Block
WORK 4 - AGAMT II - 2021-2022 - Karur Panchayat - Avudaiyarkoil Block in Pudukkottai District
2022_RDTN_263387_2
AGAMT II - 2021-2022 - Karur - 4
Open Tender
Civil Works
Item Rate
180 days
Avudaiyarkoil
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹5,000
11 Jan 2023
24 Nov 2022
26 Nov 2022
24 Nov 2022
26 Nov 2022
24 Nov 2022
Amount
Earth work excavation in all classes of soil such as hard stiff clay hard red earth, earth murrams gravel stoney erath, earth mixed with fair size boulders as per SS 20B for foundation.etc., complete
Filling with course gravel including cost and conveyance to work site including all labour charges for filling etc complete
Sand filling with good river sand including cost and conveyance of all materials to work site and all labour charges etc.,complete
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance to work site including all labour charges for filling etc complete
R.C.C. 1:11/2:3 mix using 20mm ISS HBG metal including cost and conveyance and all labour charges etc.complete.
Brick work in cm1:5 mix using country bricks of size 8 3/4" x 4 1/4" x 2 3/4" including cost and conveyance of all materials of all materials to site and labour charges etc. complete
Cost and supply of steel with fabrication including cost of steel and binding wire complete with standard specification etc.,complete
Supplying and errecting centring for sides and soffits of all RCC works including cost and conveyance of all materials to site and labour charges etc. complete
Special ceiling plastering with cement mortor 1:3 mix to 10mm thick including cost and conveyance of all materials to site and all labour charges etc. complete.
Plastering with cement mortor 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc. complete.
Paving the Floor with scratch proof ceromic tiles of size 305x305x6mm including cost and conveyance of all materials to site and all labour charges etc complete
White washing two coats using shell lime including cost and conveyance of all materials to site and all labour charges etc comoplete
Distembering two coats oil bound distember,over priming including cost and conveyamce of all materials to all labour charges etc.,(inner wall)
Emulsion painting two coats over priming coat including cost and conveyamce of all materials to all labour charges etc.,(outer wall)
Painting Two coats of new iron works such as steel doors, windows, , window bars, balustrades, etc, with best approved first quality of synthetic enamel paint of approved colour over the existing priming coats, etc., complete
Wiring with 2 x 1.50 sqm ( 22/0.3 ) PVC insulated unsheathed single core Copper Conductor of 1100 v Grade in suitable PVC Rigid Pipe on wall and ceiling with PVC accesseries with TW Switch box with 5 A F . T . Switch with painting of suitable colour for Light Point and Fan Point
Wiring with 2x1.50 sqm PVC insulated unsheated Sc.alu Cable of conductor of 1100V grade insulated for open plug point .
Supply and fixing of fancy glass shade and 11W CFL for BH point
Supply and fixing run off 2x1.50sqm PVC insulated Sc . Un sheated Sc conductor of 1100 v grade on 7/20 GI Bearer wire for Service Main
Provision for fine polished cuddapah slab 50mm Thick etc complete
Labour Charges for fixing Cuddapah Slab to Cup-Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
M SANTHI
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .