Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹19.5 LAdmitted-Finance | -15.12% | ₹19.5 L | L1 | Admitted-Finance |
| 2 | L2₹20.1 L+₹62,505.67 (3.20%)Admitted-Finance | -12.40% | ₹20.1 L+₹62,505.67 (3.20%) | L2 | Admitted-Finance |
| 3 | L3₹21.2 L+₹1.7 L (8.57%)Admitted-Finance SMVDU | -7.85% | ₹21.2 L+₹1.7 L (8.57%) | L3 | Admitted-Finance |
| 4 | L4₹21.7 L+₹2.2 L (11.3%)Admitted-Finance | -5.50% | ₹21.7 L+₹2.2 L (11.3%) | L4 | Admitted-Finance |
Tender Value
₹23.0 L
EMD Value
₹45,960
Closing Date
3 Jul 2026, 4:00 pmClosed
Executive Engineer Irrigigation Udhampur
Executive Engineer Irrigigation Udhampur
PERMANENT RESTORATION OF DUDDAR CANAL RD 0-2704 10M AT PLACES.
2026_IFC_313865_1
E NIT No 05 of 2026-27 dt 27-06-2026
Open Tender
Civil Works
Percentage
90 days
Udhampur
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
Yes
Executive Engineer Irrigigation Udhampur
₹45,960
Yes
22 Jul 2026
27 Jun 2026
4 Jul 2026
27 Jun 2026
3 Jul 2026
27 Jun 2026
27 Jun 2026 - 3 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | PERMANENT RESTORATION OF DUDDAR CANAL RD (0-2704.10M) AT PLACES | - | - | - | - |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed 1 meter from cutting edge | 205.64 | Cum | 479.3 | ₹98,563.25 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 211.98 | Cum | 5,733.6 | ₹12,15,408.53 |
| 4 | Hand-packing stones in wire-crates; excluding cost of crates and stones | 216 | Cum | 371.15 | ₹80,168.4 |
| 5 | Supply of stone inluding stacking, loading and uhloading compelted | 183.6 | Cum | 700 | ₹1,28,520 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form work for Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs andsteps etc | 51.07 | Sqm | 628.95 | ₹32,120.48 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form work for Foundations, footings, bases for columns | 204.26 | Sqm | 286.35 | ₹58,489.85 |
| 8 | Carraige of sand from nearest source to site of work av. 80km by MT and av H.L 1150m | 99.63 | Cum | 2,234.19 | ₹2,22,592.35 |
| 9 | Carraige of stone agg. From nearest source to site of work av. 18km by MT and av H.L 1150m | 188.67 | Cum | 1,545.61 | ₹2,91,610.24 |
| 10 | Carraige of stone from nearest source to site of work av. H.L 300m (Crates) | 183.6 | Cum | 493.08 | ₹90,529.49 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.80 MB
BOQ_1015975.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .