Tender Value
₹88.3 L
EMD Value
₹88,500
Closing Date
18 Jul 2022, 3:00 pmClosed
Project Director, DRDA, Nagapattinam
2nd Floor DRDA Building collectorate Nagapattinam
Nagapattinam district AGAMT II 2021-22 Renovation of ponds at AGAMT Villages in Nagapattinam block Package No.01
2022_RDTN_239716_23
AGAMT II 2021-22 4451/2021/C5
Open Tender
Civil Works - Roads
Item Rate
180 days
Nagapattinam
As seen in the tender document
9 documents required · 9 mandatory
₹0
₹88,500
Yes
2nd Floor DRDA Building collectorate Nagapattinam
22 Jul 2022
9 Jul 2022
18 Jul 2022
9 Jul 2022
18 Jul 2022
9 Jul 2022
9 Jul 2022 - 11 Jul 2022
11 Jul 2022
Amount
01. Renovation of Ponds and construction of bathing ghat and retain wall 20m in Paravai kulam @ Agaraorathur Panchayat,
Clearing scrub jungles including all other incidential charges etc., complete
Earthwork in all Soils except hard Rock requiring blasting and conveying for Formation of Bund with lead of 0 to 100 m deploying earth moving machinery and Tippers
Earthwork excavation deploying earth moving machinery for Desilting Channel and Faorming Bund on either side and depositing the earth on banks including Jungle
Provision of name board Charges
Earth work excavation and depositing on banks with initial lead and lift in hard stiff clay , stiff block cotton soil hard earth, shales, narrows etc. as per SS 20B.
Sand filling with good river sand including cost and conveyance of sand including all labour charges for filling and compacting etc. complete. required and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use) S I No 358
Cement concrete 1:4:8 mix using 40mm ISS size HBG metal from approved quarry including cost and conveyance all materials to work site including labour for mixing , laying, watering, with in 200m lead for good water compacting concrete etc. complete.
Cement concrete 1:3:6 mix using 40mm ISS size HBG metal from approved quarry including cost and conveyance all materials to work site including labour for mixing , laying, watering, with in 200m lead for good water compacting concrete etc. complete.
Supply and erecting of steel centering and shuttering including cost and conveyance of all materials and all labour charges etc., complete. complete.
Earth work excavation in all classes of soils and depositing on bank with initial lead and lift soils such as sand or other loose soil wet sand not under water silt and ordinary soil sandy loom, and hard stiff, black cotton soil,
Filling with river sand into foundation and basement including cost and conveyance of sand to worksite including labour for filling, watering within 200m lead for good water, including tampling if necessary and all labour and all other incidental charges
Cement concrete 1:4:8 mix using 40mm ISS size HBG metal from approved quarry including cost and conveyance of all materials to worksite, including labour for mixing, laying, the concrete the concrete watering with 200m lead for good water, and compacting
Cement concrete 1;3:6 mix using 40mm ISS size HBG metal from approved quarry including cost and conveyance of all materials to worksite, including labour for mixing, laying, the concrete the concrete watering with 200m lead for good water, and compacting
supply and centering and shutting inculding all labour chrges etc
02. Renovation of Ponds and construction of bathing ghat and retain wall 25m in Iyyanarkoil keel pathi kulam @ Agaraorathur Panchayat,
Clearing scrub jungles including all other incidential charges etc., complete
Earthwork in all Soils except hard Rock requiring blasting and conveying for Formation of Bund with lead of 0 to 100 m deploying earth moving machinery and Tippers
Earthwork excavation deploying earth moving machinery for Desilting Channel and Faorming Bund on either side and depositing the earth on banks including Jungle
Provision of name board Charges
Earth work excavation and depositing on banks with initial lead and lift in hard stiff clay , stiff block cotton soil hard earth, shales, narrows etc. as per SS 20B.
Sand filling with good river sand including cost and conveyance of sand including all labour charges for filling and compacting etc. complete. required and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use) S I No 358
Cement concrete 1:4:8 mix using 40mm ISS size HBG metal from approved quarry including cost and conveyance all materials to work site including labour for mixing , laying, watering, with in 200m lead for good water compacting concrete etc. complete.
Cement concrete 1:3:6 mix using 40mm ISS size HBG metal from approved quarry including cost and conveyance all materials to work site including labour for mixing , laying, watering, with in 200m lead for good water compacting concrete etc. complete.
Supply and erecting of steel centering and shuttering including cost and conveyance of all materials and all labour charges etc., complete. complete.
Earth work excavation in all classes of soils and depositing on bank with initial lead and lift soils such as sand or other loose soil wet sand not under water silt and ordinary soil sandy loom, and hard stiff, black cotton soil,
Filling with river sand into foundation and basement including cost and conveyance of sand to worksite including labour for filling, watering within 200m lead for good water, including tampling if necessary and all labour and all other incidental charges
Cement concrete 1:4:8 mix using 40mm ISS size HBG metal from approved quarry including cost and conveyance of all materials to worksite, including labour for mixing, laying, the concrete the concrete watering with 200m lead for good water, and compacting
Cement concrete 1;3:6 mix using 40mm ISS size HBG metal from approved quarry including cost and conveyance of all materials to worksite, including labour for mixing, laying, the concrete the concrete watering with 200m lead for good water, and compacting
supply and centering and shutting inculding all labour chrges etc
03.Renovation of Tank construction of Bathing ghat, Retaining wall - 6m and Inlet in Thiruvasal kulam in Muttam at Muttam panchayat.,
Clearing scrub jungles including all other incidential charges etc., complete
Earthwork in all Soils except hard Rock requiring blasting and conveying for Formation of Bund with lead of 0 to 100 m deploying earth moving machinery and Tippers
Earthwork excavation deploying earth moving machinery for Desilting Channel and Faorming Bund on either side and depositing the earth on banks including Jungle
Provision of name board Charges
Earth work excavation and depositing on banks with initial lead and lift in hard stiff clay , stiff block cotton soil hard earth, shales, narrows etc. as per SS 20B.
Sand filling with good river sand including cost and conveyance of sand including all labour charges for filling and compacting etc. complete. required and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use) S I No 358
Cement concrete 1:4:8 mix using 40mm ISS size HBG metal from approved quarry including cost and conveyance all materials to work site including labour for mixing , laying, watering, with in 200m lead for good water compacting concrete etc. complete.
Cement concrete 1:3:6 mix using 40mm ISS size HBG metal from approved quarry including cost and conveyance all materials to work site including labour for mixing , laying, watering, with in 200m lead for good water compacting concrete etc. complete.
Supply and erecting of steel centering and shuttering including cost and conveyance of all materials and all labour charges etc., complete. complete.
Earth work excavation and depositing on banks with initial lead and lift in hard stiff clay , stiff block cotton soil hard earth, shales, narrows etc. as per SS 20B.
Sand filling with good river sand including cost and conveyance of sand including all labour charges for filling and compacting etc. complete. required and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use) S I No 358
Cement concrete 1:4:8 mix using 40mm ISS size HBG metal from approved quarry including cost and conveyance all materials to work site including labour for mixing , laying, watering, with in 200m lead for good water compacting concrete etc. complete.
Cement concrete 1:3:6 mix using 40mm ISS size HBG metal from approved quarry including cost and conveyance all materials to work site including labour for mixing , laying, watering, with in 200m lead for good water compacting concrete etc. complete.
Supply and erecting of steel centering and shuttering including cost and conveyance of all materials and all labour charges etc., complete. complete.
Earth work excavation and depositing on banks with initial lead and lift in hard stiff clay , stiff block cotton soil hard earth, shales, narrows etc. as per SS 20B.
Sand filling with good river sand including cost and conveyance of sand including all labour charges for filling and compacting etc. complete. required and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use) S I No 358
Cement concrete 1:4:8 mix using 40mm ISS size HBG metal from approved quarry including cost and conveyance all materials to work site including labour for mixing , laying, watering, with in 200m lead for good water compacting concrete etc. complete.
Cement concrete 1:3:6 mix using 40mm ISS size HBG metal from approved quarry including cost and conveyance all materials to work site including labour for mixing , laying, watering, with in 200m lead for good water compacting concrete etc. complete.
Supply and erecting of steel centering and shuttering including cost and conveyance of all materials and all labour charges etc., complete. complete.
Provision for Rcc Pipe 600mm dia
04. Renovation of Ponds and construction of retaining wall - 19m in Vadaku Theru kulam @ Muttam Panchayat,
Clearing scrub jungles including all other incidential charges etc., complete
Earthwork in all Soils except hard Rock requiring blasting and conveying for Formation of Bund with lead of 0 to 100 m deploying earth moving machinery and Tippers
Earthwork excavation deploying earth moving machinery for Desilting Channel and Faorming Bund on either side and depositing the earth on banks including Jungle
Provision of name board Charges
Earth work excavation and depositing on banks with initial lead and lift in hard stiff clay , stiff block cotton soil hard earth, shales, narrows etc. as per SS 20B.
Sand filling with good river sand including cost and conveyance of sand including all labour charges for filling and compacting etc. complete. required and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use) S I No 358
Cement concrete 1:4:8 mix using 40mm ISS size HBG metal from approved quarry including cost and conveyance all materials to work site including labour for mixing , laying, watering, with in 200m lead for good water compacting concrete etc. complete.
Cement concrete 1:3:6 mix using 40mm ISS size HBG metal from approved quarry including cost and conveyance all materials to work site including labour for mixing , laying, watering, with in 200m lead for good water compacting concrete etc. complete.
Supply and erecting of steel centering and shuttering including cost and conveyance of all materials and all labour charges etc., complete. complete.
05. Renovation of Ponds and construction of bathing ghat in sevaibharathi kulam @ Muttam Panchayat,
Clearing scrub jungles including all other incidential charges etc., complete
Earthwork in all Soils except hard Rock requiring blasting and conveying for Formation of Bund with lead of 0 to 100 m deploying earth moving machinery and Tippers
Earthwork excavation deploying earth moving machinery for Desilting Channel and Faorming Bund on either side and depositing the earth on banks including Jungle
Provision of name board Charges
Earth work excavation and depositing on banks with initial lead and lift in hard stiff clay , stiff block cotton soil hard earth, shales, narrows etc. as per SS 20B.
Sand filling with good river sand including cost and conveyance of sand including all labour charges for filling and compacting etc. complete. required and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use) S I No 358
Cement concrete 1:4:8 mix using 40mm ISS size HBG metal from approved quarry including cost and conveyance all materials to work site including labour for mixing , laying, watering, with in 200m lead for good water compacting concrete etc. complete.
Cement concrete 1:3:6 mix using 40mm ISS size HBG metal from approved quarry including cost and conveyance all materials to work site including labour for mixing , laying, watering, with in 200m lead for good water compacting concrete etc. complete.
Supply and erecting of steel centering and shuttering including cost and conveyance of all materials and all labour charges etc., complete. complete.
06. Renovation of Tank construction of Bathing ghat,Inlet, Retain wall 14m in periyakulam in Karuveli at papakoil panchayat.,
Clearing scrub jungles including all other incidential charges etc., complete
Earthwork in all Soils except hard Rock requiring blasting and conveying for Formation of Bund with lead of 0 to 100 m deploying earth moving machinery and Tippers
Earthwork excavation deploying earth moving machinery for Desilting Channel and Faorming Bund on either side and depositing the earth on banks including Jungle
Provision of name board Charges
Earth work excavation and depositing on banks with initial lead and lift in hard stiff clay , stiff block cotton soil hard earth, shales, narrows etc. as per SS 20B.
Sand filling with good river sand including cost and conveyance of sand including all labour charges for filling and compacting etc. complete. required and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use) S I No 358
Cement concrete 1:4:8 mix using 40mm ISS size HBG metal from approved quarry including cost and conveyance all materials to work site including labour for mixing , laying, watering, with in 200m lead for good water compacting concrete etc. complete.
Cement concrete 1:3:6 mix using 40mm ISS size HBG metal from approved quarry including cost and conveyance all materials to work site including labour for mixing , laying, watering, with in 200m lead for good water compacting concrete etc. complete.
Supply and erecting of steel centering and shuttering including cost and conveyance of all materials and all labour charges etc., complete. complete.
Provision for Rcc Pipe 600mm dia
Earth work excavation and depositing on banks with initial lead and lift in hard stiff clay , stiff block cotton soil hard earth, shales, narrows etc. as per SS 20B.
Sand filling with good river sand including cost and conveyance of sand including all labour charges for filling and compacting etc. complete. required and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use) S I No 358
Cement concrete 1:4:8 mix using 40mm ISS size HBG metal from approved quarry including cost and conveyance all materials to work site including labour for mixing , laying, watering, with in 200m lead for good water compacting concrete etc. complete.
Cement concrete 1:3:6 mix using 40mm ISS size HBG metal from approved quarry including cost and conveyance all materials to work site including labour for mixing , laying, watering, with in 200m lead for good water compacting concrete etc. complete.
Supply and erecting of steel centering and shuttering including cost and conveyance of all materials and all labour charges etc., complete. complete.
07. Renovation of Tank construction of Bathing ghat,Retaining wall 20m and Inlet in Vannakulam in samathuvapuram at papakoil panchayat.,
Clearing scrub jungles including all other incidential charges etc., complete
Earthwork in all Soils except hard Rock requiring blasting and conveying for Formation of Bund with lead of 0 to 100 m deploying earth moving machinery and Tippers
Earthwork excavation deploying earth moving machinery for Desilting Channel and Faorming Bund on either side and depositing the earth on banks including Jungle
Provision of name board Charges
Earth work excavation and depositing on banks with initial lead and lift in hard stiff clay , stiff block cotton soil hard earth, shales, narrows etc. as per SS 20B.
Sand filling with good river sand including cost and conveyance of sand including all labour charges for filling and compacting etc. complete. required and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use) S I No 358
Cement concrete 1:4:8 mix using 40mm ISS size HBG metal from approved quarry including cost and conveyance all materials to work site including labour for mixing , laying, watering, with in 200m lead for good water compacting concrete etc. complete.
Cement concrete 1:3:6 mix using 40mm ISS size HBG metal from approved quarry including cost and conveyance all materials to work site including labour for mixing , laying, watering, with in 200m lead for good water compacting concrete etc. complete.
Supply and erecting of steel centering and shuttering including cost and conveyance of all materials and all labour charges etc., complete. complete.
Earth work excavation and depositing on banks with initial lead and lift in hard stiff clay , stiff block cotton soil hard earth, shales, narrows etc. as per SS 20B.
Sand filling with good river sand including cost and conveyance of sand including all labour charges for filling and compacting etc. complete. required and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use) S I No 358
Cement concrete 1:4:8 mix using 40mm ISS size HBG metal from approved quarry including cost and conveyance all materials to work site including labour for mixing , laying, watering, with in 200m lead for good water compacting concrete etc. complete.
Cement concrete 1:3:6 mix using 40mm ISS size HBG metal from approved quarry including cost and conveyance all materials to work site including labour for mixing , laying, watering, with in 200m lead for good water compacting concrete etc. complete.
Supply and erecting of steel centering and shuttering including cost and conveyance of all materials and all labour charges etc., complete. complete.
Earth work excavation and depositing on banks with initial lead and lift in hard stiff clay , stiff block cotton soil hard earth, shales, narrows etc. as per SS 20B.
Sand filling with good river sand including cost and conveyance of sand including all labour charges for filling and compacting etc. complete. required and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use) S I No 358
Cement concrete 1:4:8 mix using 40mm ISS size HBG metal from approved quarry including cost and conveyance all materials to work site including labour for mixing , laying, watering, with in 200m lead for good water compacting concrete etc. complete.
Cement concrete 1:3:6 mix using 40mm ISS size HBG metal from approved quarry including cost and conveyance all materials to work site including labour for mixing , laying, watering, with in 200m lead for good water compacting concrete etc. complete.
Supply and erecting of steel centering and shuttering including cost and conveyance of all materials and all labour charges etc., complete. complete.
Provision for Rcc Pipe 600mm dia
08. Renovation of Ponds and Construction of bathing ghat and Inlet in Sivankoil kulam @ sembiyanmahadevi Panchayat,
Clearing scrub jungles including all other incidential charges etc., complete
Earthwork in all Soils except hard Rock requiring blasting and conveying for Formation of Bund with lead of 0 to 100 m deploying earth moving machinery and Tippers
Earthwork excavation deploying earth moving machinery for Desilting Channel and Faorming Bund on either side and depositing the earth on banks including Jungle
Provision of name board Charges
Earth work excavation and depositing on banks with initial lead and lift in hard stiff clay , stiff block cotton soil hard earth, shales, narrows etc. as per SS 20B.
Sand filling with good river sand including cost and conveyance of sand including all labour charges for filling and compacting etc. complete. required and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use) S I No 358
Cement concrete 1:4:8 mix using 40mm ISS size HBG metal from approved quarry including cost and conveyance all materials to work site including labour for mixing , laying, watering, with in 200m lead for good water compacting concrete etc. complete.
Cement concrete 1:3:6 mix using 40mm ISS size HBG metal from approved quarry including cost and conveyance all materials to work site including labour for mixing , laying, watering, with in 200m lead for good water compacting concrete etc. complete.
Supply and erecting of steel centering and shuttering including cost and conveyance of all materials and all labour charges etc., complete. complete.
Earth work excavation and depositing on banks with initial lead and lift in hard stiff clay , stiff block cotton soil hard earth, shales, narrows etc. as per SS 20B.
Sand filling with good river sand including cost and conveyance of sand including all labour charges for filling and compacting etc. complete. required and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use) S I No 358
Cement concrete 1:4:8 mix using 40mm ISS size HBG metal from approved quarry including cost and conveyance all materials to work site including labour for mixing , laying, watering, with in 200m lead for good water compacting concrete etc. complete.
Cement concrete 1:3:6 mix using 40mm ISS size HBG metal from approved quarry including cost and conveyance all materials to work site including labour for mixing , laying, watering, with in 200m lead for good water compacting concrete etc. complete.
Supply and erecting of steel centering and shuttering including cost and conveyance of all materials and all labour charges etc., complete. complete.
Provision for Rcc Pipe 600mm dia
09.Renovation of Ponds and construction of bathing ghat and retaining wall - 8m in Ambala kulam in Agarasembiyanmahadevi @ Sembiyanmahadevi Panchayat,
Clearing scrub jungles including all other incidential charges etc., complete
Earthwork in all Soils except hard Rock requiring blasting and conveying for Formation of Bund with lead of 0 to 100 m deploying earth moving machinery and Tippers
Earthwork excavation deploying earth moving machinery for Desilting Channel and Faorming Bund on either side and depositing the earth on banks including Jungle
Provision of name board Charges
Earth work excavation and depositing on banks with initial lead and lift in hard stiff clay , stiff block cotton soil hard earth, shales, narrows etc. as per SS 20B.
Sand filling with good river sand including cost and conveyance of sand including all labour charges for filling and compacting etc. complete. required and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use) S I No 358
Cement concrete 1:4:8 mix using 40mm ISS size HBG metal from approved quarry including cost and conveyance all materials to work site including labour for mixing , laying, watering, with in 200m lead for good water compacting concrete etc. complete.
Cement concrete 1:3:6 mix using 40mm ISS size HBG metal from approved quarry including cost and conveyance all materials to work site including labour for mixing , laying, watering, with in 200m lead for good water compacting concrete etc. complete.
Supply and erecting of steel centering and shuttering including cost and conveyance of all materials and all labour charges etc., complete. complete.
Earth work excavation and depositing on banks with initial lead and lift in hard stiff clay , stiff block cotton soil hard earth, shales, narrows etc. as per SS 20B.
Sand filling with good river sand including cost and conveyance of sand including all labour charges for filling and compacting etc. complete. required and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use) S I No 358
Cement concrete 1:4:8 mix using 40mm ISS size HBG metal from approved quarry including cost and conveyance all materials to work site including labour for mixing , laying, watering, with in 200m lead for good water compacting concrete etc. complete.
Cement concrete 1:3:6 mix using 40mm ISS size HBG metal from approved quarry including cost and conveyance all materials to work site including labour for mixing , laying, watering, with in 200m lead for good water compacting concrete etc. complete.
Supply and erecting of steel centering and shuttering including cost and conveyance of all materials and all labour charges etc., complete. complete.
10.Renovation of tanks Construction of retaining Wall - 15m and Bathing ghat Karumpu kuttai in ponveli @ Sikkal Panchayat,
Clearing scrub jungles including all other incidential charges etc., complete
Earthwork in all Soils except hard Rock requiring blasting and conveying for Formation of Bund with lead of 0 to 100 m deploying earth moving machinery and Tippers
Earthwork excavation deploying earth moving machinery for Desilting Channel and Faorming Bund on either side and depositing the earth on banks including Jungle
Provision of name board Charges
Earth work excavation and depositing on banks with initial lead and lift in hard stiff clay , stiff block cotton soil hard earth, shales, narrows etc. as per SS 20B.
Sand filling with good river sand including cost and conveyance of sand including all labour charges for filling and compacting etc. complete. required and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use) S I No 358
Cement concrete 1:4:8 mix using 40mm ISS size HBG metal from approved quarry including cost and conveyance all materials to work site including labour for mixing , laying, watering, with in 200m lead for good water compacting concrete etc. complete.
Cement concrete 1:3:6 mix using 40mm ISS size HBG metal from approved quarry including cost and conveyance all materials to work site including labour for mixing , laying, watering, with in 200m lead for good water compacting concrete etc. complete.
Supply and erecting of steel centering and shuttering including cost and conveyance of all materials and all labour charges etc., complete. complete.
Earth work excavation and depositing on banks with initial lead and lift in hard stiff clay , stiff block cotton soil hard earth, shales, narrows etc. as per SS 20B.
Sand filling with good river sand including cost and conveyance of sand including all labour charges for filling and compacting etc. complete. required and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use) S I No 358
Cement concrete 1:4:8 mix using 40mm ISS size HBG metal from approved quarry including cost and conveyance all materials to work site including labour for mixing , laying, watering, with in 200m lead for good water compacting concrete etc. complete.
Cement concrete 1:3:6 mix using 40mm ISS size HBG metal from approved quarry including cost and conveyance all materials to work site including labour for mixing , laying, watering, with in 200m lead for good water compacting concrete etc. complete.
Supply and erecting of steel centering and shuttering including cost and conveyance of all materials and all labour charges etc., complete. complete.
11. Renovation of tanks Construction of retaining wall - 23m and Bathing ghat Thirumeiganam kulam in Sikkal @ Sikkal Panchayat,
Clearing scrub jungles including all other incidential charges etc., complete
Earthwork in all Soils except hard Rock requiring blasting and conveying for Formation of Bund with lead of 0 to 100 m deploying earth moving machinery and Tippers
Earthwork excavation deploying earth moving machinery for Desilting Channel and Faorming Bund on either side and depositing the earth on banks including Jungle
Provision of name board Charges
Earth work excavation and depositing on banks with initial lead and lift in hard stiff clay , stiff block cotton soil hard earth, shales, narrows etc. as per SS 20B.
Sand filling with good river sand including cost and conveyance of sand including all labour charges for filling and compacting etc. complete. required and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use) S I No 358
Cement concrete 1:4:8 mix using 40mm ISS size HBG metal from approved quarry including cost and conveyance all materials to work site including labour for mixing , laying, watering, with in 200m lead for good water compacting concrete etc. complete.
Cement concrete 1:3:6 mix using 40mm ISS size HBG metal from approved quarry including cost and conveyance all materials to work site including labour for mixing , laying, watering, with in 200m lead for good water compacting concrete etc. complete.
Supply and erecting of steel centering and shuttering including cost and conveyance of all materials and all labour charges etc., complete. complete.
Earth work excavation and depositing on banks with initial lead and lift in hard stiff clay , stiff block cotton soil hard earth, shales, narrows etc. as per SS 20B.
Sand filling with good river sand including cost and conveyance of sand including all labour charges for filling and compacting etc. complete. required and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use) S I No 358
Cement concrete 1:4:8 mix using 40mm ISS size HBG metal from approved quarry including cost and conveyance all materials to work site including labour for mixing , laying, watering, with in 200m lead for good water compacting concrete etc. complete.
Cement concrete 1:3:6 mix using 40mm ISS size HBG metal from approved quarry including cost and conveyance all materials to work site including labour for mixing , laying, watering, with in 200m lead for good water compacting concrete etc. complete.
Supply and erecting of steel centering and shuttering including cost and conveyance of all materials and all labour charges etc., complete. complete.
Earth work excavation and depositing on banks with initial lead and lift in hard stiff clay , stiff block cotton soil hard earth, shales, narrows etc. as per SS 20B.
Sand filling with good river sand including cost and conveyance of sand including all labour charges for filling and compacting etc. complete. required and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use) S I No 358
Cement concrete 1:4:8 mix using 40mm ISS size HBG metal from approved quarry including cost and conveyance all materials to work site including labour for mixing , laying, watering, with in 200m lead for good water compacting concrete etc. complete.
Cement concrete 1:3:6 mix using 40mm ISS size HBG metal from approved quarry including cost and conveyance all materials to work site including labour for mixing , laying, watering, with in 200m lead for good water compacting concrete etc. complete.
Supply and erecting of steel centering and shuttering including cost and conveyance of all materials and all labour charges etc., complete. complete.
12.Renovation of Ponds and construction of bathing ghat and retaining wall in Nadutheru kulam @ Themangalam Panchayat,
Clearing scrub jungles including all other incidential charges etc., complete
Earthwork in all Soils except hard Rock requiring blasting and conveying for Formation of Bund with lead of 0 to 100 m deploying earth moving machinery and Tippers
Earthwork excavation deploying earth moving machinery for Desilting Channel and Faorming Bund on either side and depositing the earth on banks including Jungle
Provision of name board Charges
Earth work excavation and depositing on banks with initial lead and lift in hard stiff clay , stiff block cotton soil hard earth, shales, narrows etc. as per SS 20B.
Sand filling with good river sand including cost and conveyance of sand including all labour charges for filling and compacting etc. complete. required and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use) S I No 358
Cement concrete 1:4:8 mix using 40mm ISS size HBG metal from approved quarry including cost and conveyance all materials to work site including labour for mixing , laying, watering, with in 200m lead for good water compacting concrete etc. complete.
Cement concrete 1:3:6 mix using 40mm ISS size HBG metal from approved quarry including cost and conveyance all materials to work site including labour for mixing , laying, watering, with in 200m lead for good water compacting concrete etc. complete.
Supply and erecting of steel centering and shuttering including cost and conveyance of all materials and all labour charges etc., complete. complete.
Earth work excavation and depositing on banks with initial lead and lift in hard stiff clay , stiff block cotton soil hard earth, shales, narrows etc. as per SS 20B.
Sand filling with good river sand including cost and conveyance of sand including all labour charges for filling and compacting etc. complete. required and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use) S I No 358
Cement concrete 1:4:8 mix using 40mm ISS size HBG metal from approved quarry including cost and conveyance all materials to work site including labour for mixing , laying, watering, with in 200m lead for good water compacting concrete etc. complete.
Cement concrete 1:3:6 mix using 40mm ISS size HBG metal from approved quarry including cost and conveyance all materials to work site including labour for mixing , laying, watering, with in 200m lead for good water compacting concrete etc. complete.
Supply and erecting of steel centering and shuttering including cost and conveyance of all materials and all labour charges etc., complete. complete.
13.Renovation of Ponds and construction of bathing ghat and retain wall in Pillaiyar kulam @ Themangalam Panchayat,
Clearing scrub jungles including all other incidential charges etc., complete
Earthwork in all Soils except hard Rock requiring blasting and conveying for Formation of Bund with lead of 0 to 100 m deploying earth moving machinery and Tippers
Earthwork excavation deploying earth moving machinery for Desilting Channel and Faorming Bund on either side and depositing the earth on banks including Jungle
Provision of name board Charges
Earth work excavation and depositing on banks with initial lead and lift in hard stiff clay , stiff block cotton soil hard earth, shales, narrows etc. as per SS 20B.
Sand filling with good river sand including cost and conveyance of sand including all labour charges for filling and compacting etc. complete. required and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use) S I No 358
Cement concrete 1:4:8 mix using 40mm ISS size HBG metal from approved quarry including cost and conveyance all materials to work site including labour for mixing , laying, watering, with in 200m lead for good water compacting concrete etc. complete.
Cement concrete 1:3:6 mix using 40mm ISS size HBG metal from approved quarry including cost and conveyance all materials to work site including labour for mixing , laying, watering, with in 200m lead for good water compacting concrete etc. complete.
Supply and erecting of steel centering and shuttering including cost and conveyance of all materials and all labour charges etc., complete. complete.
Earth work excavation and depositing on banks with initial lead and lift in hard stiff clay , stiff block cotton soil hard earth, shales, narrows etc. as per SS 20B.
Sand filling with good river sand including cost and conveyance of sand including all labour charges for filling and compacting etc. complete. required and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use) S I No 358
Cement concrete 1:4:8 mix using 40mm ISS size HBG metal from approved quarry including cost and conveyance all materials to work site including labour for mixing , laying, watering, with in 200m lead for good water compacting concrete etc. complete.
Cement concrete 1:3:6 mix using 40mm ISS size HBG metal from approved quarry including cost and conveyance all materials to work site including labour for mixing , laying, watering, with in 200m lead for good water compacting concrete etc. complete.
Supply and erecting of steel centering and shuttering including cost and conveyance of all materials and all labour charges etc., complete. complete.
14.Renovation of Ponds and construction of bathing ghat in Kothamangalam Sambu kulam @ Themangalam Panchayat,
Clearing scrub jungles including all other incidential charges etc., complete
Earthwork in all Soils except hard Rock requiring blasting and conveying for Formation of Bund with lead of 0 to 100 m deploying earth moving machinery and Tippers
Earthwork excavation deploying earth moving machinery for Desilting Channel and Faorming Bund on either side and depositing the earth on banks including Jungle
Provision of name board Charges
Earth work excavation and depositing on banks with initial lead and lift in hard stiff clay , stiff block cotton soil hard earth, shales, narrows etc. as per SS 20B.
Sand filling with good river sand including cost and conveyance of sand including all labour charges for filling and compacting etc. complete. required and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use) S I No 358
Cement concrete 1:4:8 mix using 40mm ISS size HBG metal from approved quarry including cost and conveyance all materials to work site including labour for mixing , laying, watering, with in 200m lead for good water compacting concrete etc. complete.
Cement concrete 1:3:6 mix using 40mm ISS size HBG metal from approved quarry including cost and conveyance all materials to work site including labour for mixing , laying, watering, with in 200m lead for good water compacting concrete etc. complete.
Supply and erecting of steel centering and shuttering including cost and conveyance of all materials and all labour charges etc., complete. complete.
15.Renovation of Ponds and construction of retain wall in Sadaiyan kulam @ Themangalam Panchayat,
Clearing scrub jungles including all other incidential charges etc., complete
Earthwork in all Soils except hard Rock requiring blasting and conveying for Formation of Bund with lead of 0 to 100 m deploying earth moving machinery and Tippers
Earthwork excavation deploying earth moving machinery for Desilting Channel and Faorming Bund on either side and depositing the earth on banks including Jungle
Provision of name board Charges
Earth work excavation and depositing on banks with initial lead and lift in hard stiff clay , stiff block cotton soil hard earth, shales, narrows etc. as per SS 20B.
Sand filling with good river sand including cost and conveyance of sand including all labour charges for filling and compacting etc. complete. required and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use) S I No 358
Cement concrete 1:4:8 mix using 40mm ISS size HBG metal from approved quarry including cost and conveyance all materials to work site including labour for mixing , laying, watering, with in 200m lead for good water compacting concrete etc. complete.
Cement concrete 1:3:6 mix using 40mm ISS size HBG metal from approved quarry including cost and conveyance all materials to work site including labour for mixing , laying, watering, with in 200m lead for good water compacting concrete etc. complete.
Supply and erecting of steel centering and shuttering including cost and conveyance of all materials and all labour charges etc., complete. complete.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} 12% for other than Earth Quantity
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} 12% for other than Earth Quantity
DELTA ENGINEERING SERVICE
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .