| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.4 CrAccepted-AOC | ₹5.4 Cr Quoted ₹5.7 Cr | L1 | Accepted-AOC BEING BOND CREATED |
| 2 | L2₹6.0 Cr+₹26.9 L (4.73%)Rejected-Finance | ₹6.0 Cr+₹26.9 L (4.73%) | L2 | Rejected-Finance BEING HIGHER RATE FOUND |
| 3 | Rejected-Technical | - | - | Rejected-Technical BEING FOUND NON RESPONSIVE IN PRAHARI SOFTWARE |
Tender Value
₹5.3 Cr
EMD Value
₹10.6 L
Closing Date
6 May 2022, 12:00 pmClosed
SE SUL.A.CIRCLE PWD SULTANPUR
OFFICE OF SUPERENTENDING ENGINEER, SULTANPUR-AMETH
AS PER BOQ
2022_CEUFZ_685463_1
590/1COM-SUL.A.CIR./2022 DATED 16.03.2022
Open Tender
Civil Works - Roads
Item Rate
180 days
SULTANPUR
AS PER NIT
2 documents required · 2 mandatory
₹2,714
₹10.6 L
Yes
OFFICE OF SUPERENTENDING ENGINEER, SULTANPUR-AMETH
14 Nov 2022
6 Apr 2022
6 May 2022
6 Apr 2022
6 May 2022
6 Apr 2022
12 Apr 2022
Amount
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2
Providing and laying granular sub-base (GSB) by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in plant method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.As per Direction of E/I.
Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with in all lifts and lead upto 1000 metres.
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. As per MORT&H reff.- 406
Providing, laying and spreading of graded stone aggregate (wet mix macadam) after mixing with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying with 1% OPC Cement & 3.5% Emulsion in uniform single layers on sub- base /subgrade and compacting with road roller to achieve the desired density.
Providing and applying Tack coat-1 with bitumren VG-10 Grade using bitumen pressure dristibutor at the rate of 0.35 Kg per Sqm on the prepared granular surface treated with primer and cleaned with hydraulic broom as per technical specification clause 503.
Providing and laying Dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous [email protected] per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finesher with senser control to the required grade,level and alignment,rolling with smooth wheeled,vibratory and tandem rollers to achieve the disiered compaction as per MoRT&H specifications clause 507complete in all respects . As per Direction of E/I.
Providing and applying Tack coat -2 with bitumren VG-10 Grade using bitumen pressure dristibutor at the rate of 0.30 Kg per Sqm on the prepared granular surface treated with primer and cleaned with hydraulic broom as per technical specification clause 503.
Providing and laying bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous [email protected] per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finesher with senser control to the required grade,level and alignment,rolling with smooth wheeled,vibratory and tandem rollers to achieve the disiered compaction as per MoRT&H specifications clause 509 complete in all respects . As per Direction of E/I.
Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing
Construction of earthen shoulders (Patries) with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 As per Direction of E/I.
Nodal Junction Point grade correction of emerging/branching roads.(12 Nos)- Providing and laying granular sub-base (GSB) by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in plant method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.As per Direction of E/I.
Nodal Junction Point grade correction of emerging/branching roads.(12 Nos)- Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. As per MORT&H reff.- 406
Nodal Junction Point grade correction of emerging/branching roads.(12 Nos)- Providing and applying Tack coat-1 with bitumren VG-10 Grade using bitumen pressure dristibutor at the rate of 0.35 Kg per Sqm on the prepared granular surface treated with primer and cleaned with hydraulic broom as per technical specification clause 503.
Nodal Junction Point grade correction of emerging/branching roads.(12 Nos)- Providing and laying Dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous [email protected] per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finesher with senser control to the required grade,level and alignment,rolling with smooth wheeled,vibratory and tandem rollers to achieve the disiered compaction as per MoRT&H specifications clause 507complete in all respects . As per Direction of E/I.
Nodal Junction Point grade correction of emerging/branching roads.(12 Nos)- Providing and applying Tack coat -2 with bitumren VG-10 Grade using bitumen pressure dristibutor at the rate of 0.30 Kg per Sqm on the prepared granular surface treated with primer and cleaned with hydraulic broom as per technical specification clause 503.
Nodal Junction Point grade correction of emerging/branching roads.(12 Nos)- Providing and laying bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous [email protected] per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finesher with senser control to the required grade,level and alignment,rolling with smooth wheeled,vibratory and tandem rollers to achieve the disiered compaction as per MoRT&H specifications clause 509 complete in all respects . As per Direction of E/I.
C/o Deep U Type Drain on both sides of Road in Abadi portion.(450x500mm)- Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m
C/o Deep U Type Drain on both sides of Road in Abadi portion.(450x500mm)- Plain cement concrete 1:3:6 mix with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. As per SI 280
C/o Deep U Type Drain on both sides of Road in Abadi portion.(450x500mm)- Furnishing and Placing Reinforced/ Prestressed cement concrete in super-structure as per drawing and Technical Specification.As per direction of E/I,As Per SI N0-288
C/o Deep U Type Drain on both sides of Road in Abadi portion.(450x500mm)- Supplying, fitting and placing Mild steel reinforcement complete in sub-structure as per drawing and Technical Specification. As per direction of E/I,
Extention of Hume pipe Culverts.(350 MM dai)- Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m.As per Direction of E/I.
Extention of Hume pipe Culverts.(350 MM dai)- Plain cement concrete 1:3:6 mix with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days..As per direction of E/I.
Extention of Hume pipe Culverts.(350 MM dai)- Class 150 B/W 1:4 cement and coarse sand mortar in foundation and plinth i/c supply of all materials,labour & T&P etc. required for proper completion of work.As per direction of E/I,S.I.No 307(Bellow Foundation)
Extention of Hume pipe Culverts.(350 MM dai)- Struck pointing 1:2 in cement and fine sand mortar as per SI-578
Extention of Hume pipe Culverts.(350 MM dai)- Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical Specifications as per SI-582
Extention of Hume pipe Culverts.(350 MM dai) -Laying Reinforced cement concrete pipe NP4/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets.
Extention of Hume pipe Culverts.(900 MM dai)- Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m
Extention of Hume pipe Culverts.(900 MM dai)- Plain cement concrete 1:3:6 mix with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. As per SI 280
Extention of Hume pipe Culverts.(900 MM dai)- Brick masonry work in 1:4 in sub-structure complete excluding pointing and plastering, as per drawing and Technical Specifications as per SI-305(b)
Extention of Hume pipe Culverts.(900 MM dai)- Struck pointing 1:2 in cement and fine sand mortar as per SI-578
Extention of Hume pipe Culverts.(900 MM dai)- Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical Specifications as per SI-582
Extention of Hume pipe Culverts.(900 MM dai)- Laying Reinforced cement concrete pipe NP4/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets .
VINDHYACHAL SINGH
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .