Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 LAccepted-Finance | L1 | Accepted-Finance Responsive | |
| 2 | L2₹1.5 L+₹4,699 (3.23%)Accepted-Finance | L2 | Accepted-Finance Responsive | |
| 3 | l3₹1.7 L+₹22,950 (15.8%)Accepted-Finance | l3 | Accepted-Finance Responsive | |
| 4 | L4₹1.7 L+₹24,900 (17.1%)Accepted-Finance | L4 | Accepted-Finance Responsive | |
| 5 | L5₹1.8 L+₹31,200 (21.5%)Accepted-Finance | L5 | Accepted-Finance Responsive |
Tender Value
₹2.0 L
Closing Date
21 Apr 2022, 4:00 pmClosed
Er Zulfiqar Ali Malik
Executive Engineer Jal Shakti (PHE) Division Qazigund
Providing water supply facilities to Shri Amar Nath Ji Yatries at Base Camp Walnut Factory Levdoora Qazigund during the year 2022 (SANJY 2022-23)
2022_PHE_166122_2
01/EE/JSD/Qazigund/2022-23
Open Tender
Civil Works - Water Works
Item Rate
10 days
Levdoora Qazigund
Please refer NIT
2 documents required · 2 mandatory
₹200
MH 0215 PHE
Exempted
17 May 2022
6 Apr 2022
22 Apr 2022
6 Apr 2022
21 Apr 2022
6 Apr 2022
Amount
Laying and fitting of G.I. pipes (all classes) complete excluding cost of pipes, fittings and Earth work
25 mm dia GI Pipe
20 mm dia GI Pipe
Engagement of Labour for clearance of drains for disposal of waste water and watch and ward of pipe network and disiliting of IR.
Fixing charges of PVC Storage tanks at camp site ( Capacity 1000 Ltr)
Providing and placing on terrace (at all floor levels) polyethylene water storage tank ISI : 12701 marked, with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank
Providing and fixing of banners etc complete Job :-
Large Size:- (2'x6"x6'-0")
Fixing charges of MS Stands for PVC Tanks complet job
Providing mugs & buckets for wash Room /Bath Points complete job:
Buckets
Provision for Cutting of Road inside camp Premises.(if required at site)Complete job.
Hire Charges of gas cylinder ,Utensils,Bedding to staff during yatra period complete job
Installation of PSP Inside bathroom/washoom .kitchen and other required spots including cost of pipe specials and returning of all the pipe special /fitting to divisional store.After completion of Yatra.
Installation of 01 Hp motor and stabilizer including all allied accessories etc complete job
Provision for pipe specials if not supplied departmently(to be paid as per actual as per voucher dully verified by AEE concerned).
Installation Charges of water purifier cum cooler of standard manufacture at camp and retuned back to Divisional store after completion of yatra.
600 Ltr/ Hr Capacity
200 Ltr/ Hr Capacity
Providing fixing of 65 mm dia canvas flaxible pipe required for smooth functioning of tanker service during yatra period.
Carriage of pipes material and all other allied items from Divisional Store Qazigund to site of work and return back to Divisional Store after completion of yatra by mechinical Transport Avg Lead 06 KM. Including loading, unloading and stacking complete.
ABDUL RASHID BHAT
SHAHID SULTAN
MIR ZAMEER AHMAD
JAVID AHMAD TAK
tech_eval.pdf
fin_eval.pdf
finance_385272.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .