Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.5 CrAccepted-AOC 28 JANAPATH TOWER ASHOK NAGAR BHUBANESWAR DIST KHURDA 751009 | BHUBANESWAR | KHURDA | ODISHA | 751009 | ₹29.5 Cr Quoted ₹29.7 Cr | L1 | Accepted-AOC 1st lowest bidder |
| 2 | Rejected-Technical NEAR MEGHANA BIDI OFFICE WARD NO 29 PO BUDHRAJA 768004 DIST SAMBALPUR | SAMBALPUR | SAMBALPUR | ODISHA | 768004 | - | - | Rejected-Technical Disqualified |
Tender Value
₹21.2 Cr
EMD Value
₹21.2 L
Closing Date
17 Feb 2026, 5:00 pmClosed
Chief Engineer, Bridges, Odisha
Nirman Soudha, O/o EIC (Civil), Odisha, Bhubaneswar
Construction of H. L. Bridge over Power Channel at 3.660km on Burla link road (ODR) in the District of Sambalpur under State Plan for the year 2023-24
2026_EICCL_124248_2
CE-BRIDGES-12/2025-26
Open Tender
Civil Works - Bridges
Percentage
730 days
in the District of Sambalpur
Please refer Tender documents.
4 documents required · 4 mandatory
₹10,000
₹21.2 L
Yes
20 Jul 2026
21 Jan 2026
18 Feb 2026
21 Jan 2026
17 Feb 2026
21 Jan 2026
21 Jan 2026 - 13 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material upto 1000m lead including cost of all labour, machinery etc complete as per Technical Specifications and Clause - 201 of MoRT&H Specifications for Road & Bridge works (5th Revision). | 7,204.25 | Sqm | 8.45 | ₹60,875.91 |
| 2 | Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material upto 1000m lead including cost of all labour, machinery etc complete per Technical Specifications and Clause 305.4.3 of MoRT&H Specifications for Road & Bridge works (5th Revision). | 1,750 | Sqm | 6.03 | ₹10,552.5 |
| 3 | Re-working of scarified bituminous surface suitably after supplementing base materials with sand & compacting finished surface including cost, conveyance, royality of sand & cost of all labour, machinery etc complete as per Technical Specifications and Clause-501.8.3.2 of MoRT&H Specifications for Road & Bridge works (5th Revision). | 1,750 | Sqm | 22.01 | ₹38,517.5 |
| 4 | Excavation for road work in soil with hydraulic excavator including cutting, trimming bottom & side slopes and transporting to the embankment locations upto 1000m lead with cost of all labour, machinery etc complete as per approved Drawing & Technical Specifications and Clause - 301 & 304 of MoRT&H Specifications for Road & Bridge works (5th Revision). | 4,671.99 | Cum | 74.79 | ₹3,49,418.13 |
| 5 | Loosening, leveling and Compacting original ground to facilitate placement of first layer of embankment, scarified to a depth of 150mm, compacted at OMC to achieve minimum dry density conforming to Table 300-2 with cost of all labour, machinery etc complete as per Technical Specifications and Clause - 305.3.4 of MoRT&H Specifications for Road & Bridge works (5th Revision). | 304.5 | Cum | 36.05 | ₹10,977.22 |
| 6 | Construction of embankment with approved materials deposited at site from roadway cutting and foundation excavation of CD & structures graded and compacted to meet requirement of table 300-2 including cost of all labour, machinery etc complete as per approved Drawing & Technical Specifications and Clause -305 of MoRT&H Specifications for Road & Bridge works (5th Revision). | 2,544.77 | Cum | 35.83 | ₹91,179.11 |
| 7 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading and compacting to meet requirement of table 300-2 including cost, conveyance, royality of all materials & cost of all labour, machinery etc complete as per approved Drawing & Technical Specifications and Clause -305 of MoRT&H Specifications for Road & Bridge works (5th Revision). | 1,042.1 | Cum | 203.79 | ₹2,12,369.56 |
| 8 | Back Filling of surplus excavated earth behind Structures by manual means with initial lead 50m and lift of 1.50mtr including cost of all labour T&P required for the work etc. complete as directed by Engineer-In-Charge | 1,183.67 | Cum | 153.83 | ₹1,82,083.96 |
| 9 | Sand filling in Road work & foundation of structure including cost, conveyance, royality of sand & cost of all labour etc complete as as per approved Drawing & Technical Specifications and Section - 2100 & Clause -304 of MoRT&H Specifications for Road & Bridge works (5th Revision). | 294.5 | Cum | 1,201.87 | ₹3,53,950.71 |
| 10 | Supplying, Fitting, Fixing, Placing and Driving in position Steel Liner of 6mm to 10mm thick for Pile shaft including cost, conveyance all materials & cost of all labour etc complete as per approved Drawing & Technical Specifications and Section 1100 & 1900 of MoRT&H Specifications for Road & Bridge works (5th Revision). | 66.23 | MT | 1,06,797.76 | ₹70,73,215.64 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.76 MB
BOQ_574648.xls
BOQ • 1.23 MB
POWER_CANAL_REVISED_GAD.pdf
Additional Documents • 0.78 MB
DTCN_POWERCHANNAL.pdf
Tender Documents • 0.90 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .