| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.7 LAccepted-AOC | 1 | Accepted-AOC Below Estimate | |
| 2 | 2₹5.8 L+₹4,223 (0.74%)Rejected-AOC | 2 | Rejected-AOC Above Estimate |
| Sl No | Description | Qty | Unit | SRI VINAYAKA CONSTRUCTIONS L1 | M EASWARAN L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for Open Cutting and depositing on bank with in the initial lead of 10m and a lift of 2m in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc. complete. complying with std. specifications.SS 20 B | 22 | m3 | 3,784 ₹3,784 Lowest | 3,850 ₹3,850 |
| 2.00 | Earth work excavation for foundation and depositing on bank with in the initial lead of 10m and a lift of 2m in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc. complete. complying with std. specifications.SS 20 B | 7 | m3 | 2,415 ₹2,415 Lowest | 2,450 ₹2,450 |
| 3.00 | Plain Cement Concrete 1:4:8 Mix (one part cement, Four part sand and Eight part of aggrigate) using 40mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc. complete. Complying with std. specifications. | 3 | m3 | 20,871 ₹20,871 Lowest | 20,880 ₹20,880 |
| 4.00 | Supplying and fabrication of steel placing in position and the rate including cost and conveyance of all materials to work site and labour charges etc., complete complying with standard specification | 1,500 | Kg | 1,54,500 ₹1,54,500 Lowest | 1,57,500 ₹1,57,500 |
| 5.00 | R.C.C.1:11/2:3 mix using 20mm metal and the rate including cost and conveyance of all materials to work site and labour charges etc., complete complying with standard specification | 16 | m3 | 1,83,184 ₹1,83,184 Lowest | 1,83,200 ₹1,83,200 |
| 6.00Supplying and erecting of centering to sides and soffits including supports and strutting for drainage sides and culvert body wall sides using 90cm x 60cm and B.G 10 stifened with welded mild steel angles of size 25mm x 25mm x 3mm for boarding laid over (silver oak joists) of size 10cm x 6.50 cm spread at about 90cm including all labour charges and cost and conveyance of all materials to site etc., complete complying with standard specification | |||||
| 6.01 | (a) For round GLR steining | 89 | m2 | 1,04,842 ₹1,04,842 Lowest | 1,05,020 ₹1,05,020 |
| 6.02 | (b) GLR slab | 20 | m2 | 24,300 ₹24,300 Lowest | 24,400 ₹24,400 |
| 7.00 | Plastering in cm 1:3 to 10 mm thick and the rate including cost and conveyance of all materials to work site and labour charges etc., complete complying with standard specification | 105 | m2 | 44,310 ₹44,310 Lowest | 44,625 ₹44,625 |
| 8.00 | Supply and fixing of 50 mm dia GI pipes and the rate including the cost of labour for loading and unloading to the department store etc.,complete.with standard specification | 72 | RM | 32,760 ₹32,760 Lowest | 33,120 ₹33,120 |
Tender Value
₹7 L
EMD Value
₹7,000
Closing Date
6 Aug 2025, 3:00 pmClosed
EXECUTIVE OFFICER
HULICAL TOWN PANCHAYAT
Construction of GLR at 7th ward Nedimund (15th SFC 25-26 1st Ins)
2025_DTP_588222_1
286/2025-2
Open Tender
Civil Works
Works
180 days
HULICAL TOWN PANCHAYAT
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹7,000
8 Mar 2026
2 Aug 2025
6 Aug 2025
2 Aug 2025
6 Aug 2025
2 Aug 2025
2 Aug 2025 - 6 Aug 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .