Loading…
Loading…
Tender Value
₹3.8 Cr
EMD Value
₹3.8 L
Closing Date
15 Jul 2026, 5:00 pm7d left
Chief General Manager
MPRRDA, HO, 3rd Floor, Vikas Bhawan, Arera Hills, BHOPAL
Construction / Upgradation of Rural Roads under Pradhan Mantri Gram Sadak Yojna including maintenance for Five Year after construction.
2026_MPRRD_148275_6
NIT-1276
Open Tender
Civil Works - Roads
365 days
Dewas
As per Tender Document
7 documents required · 7 mandatory
₹17,700
₹3.8 L
MPRRDA, HO, Bhopal
23 Jun 2026
23 Jun 2026
17 Jul 2026
23 Jun 2026
15 Jul 2026
24 Jun 2026
29 Jun 2026
Road/Bridge Work
MPRRDA,PIU DEWAS
Bill of Quantity
Details for the Percentage(%) Rate Tender
Based on SSR 01-01-2024
Khategaon
Khategaon
Total
Amount of Construction Cost
Amount of Mantenance Cost
Total Amount of PAC
Excavation, Carting i/c Removal of Soil with Disposal upto 1000 m Excavation of embankment, sub-grade and drain consisting of excavation, removal and satisfactory disposal of all excavated materials including hauling to sides of embankment and subgrade construction as also the disposal of materials in specified manner and the trimming and finishing of the road to the specified dimensions i/c all lifts, lead upto 1000 meters including dewatering, shaping and excavation in marsh and complete disposal of all muck as per clause 302. for all types of soil i/c moorum gravel etc. as directed by the Engineer-in-charge
Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricating and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406.
Cement Concrete Pavement :- (CC M-30 Without Dowel Bar) Construction of un-reinforced, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of transverse joint as per MORD 2014 Clause no. 1501.8, admixtures as approved, curing of concrete slabs for 14-days,
14.10Providing and Fixing 'citizen's information board' of PMGSY Project Providing and fixing of typical PMGSY CITIZEN'S INFORMATION BOARD with Logo as per MORD specifications and drawing, made of 75mm square or 75mm dia. circular s
White washing of parapet walls of CD work and tree truncks White washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technical specifications Clause 1915
Meter
Supplying, fixing and placing TMT bar reinforcement (Fe 500) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1204.15 & 1202
Cement Concrete Slab Construction of un-reinforced and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and construction joints, applying debonding strips, primer, sealant, approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,
Drainage spouts complete as per drawing and technical specifications Clause 1404.5
TOTAL AMOUNT
G Total
Cost of Annual Maintenance for five years after completion of project will be estimated as per the PMGSY Guidelines. Different activities of ordnary repairs are done as and when.
Amount Required for maintenance of Road for five years after completion of Project.
Total
Amount Required for maintenance of Road for five years after completion of Project.
Total
Grand Total
Sub Engineer/Astt. Manager
MPRRDA
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.90 MB
Tendernotice_2.pdf
PDF • 3.26 MB
BOQ_232374.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid