| 1 | L1₹49.6 LAccepted-AOC | ₹49.6 L | L1 | Accepted-AOC The Lowest Amount Qupted by EST Constructions |
| 2 | L2₹49.6 L+₹984.08 (0.02%)Rejected-Finance | ₹49.6 L+₹984.08 (0.02%) | L2 | Rejected-Finance HIGH |
| Sl No | Description | Qty | Unit | LOKESH L2 | EST CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.00Detailed Project Report for the work of strengthening of(R-69.VPR) Punnai -Osur road 0/0-1/380 km @ PUNNAI Panchayat in Vandavasi Block of Thiruvannamalai District | |||||
| 2.00 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp. | 1,987.2 | Sqm | 6.5 ₹12,916.8 | 6.3 ₹12,519.36 Lowest |
| 3.00 | Picking old metalled / BT surface upto 10cm thick as directed by the departmental officers | 1,317.63 | Sqm | 23.5 ₹30,964.31 | 23.3 ₹30,700.78 Lowest |
| 4.00 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water and other item which may be necessary or convenient to the succesful completion of the excavation in a compacted condition a quality of materials not exceeding the amount of excavation including all machinery charges for T&P employed etc., complete for cutting side drains and forming berms as per standard specifications. | 577.04 | Cu.m | 140.6 ₹81,131.82 | 140.3 ₹80,958.71 Lowest |
| 5.00 | Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp for base-course and side berms
KM.0/0-1/0 | 184.78 | Cu.m | 670.68 ₹1,23,928.25 Lowest | 670.68 ₹1,23,928.25 Lowest |
| 6.00 | KM-1/0-2/0 | 71.25 | Cu.m | 680.74 ₹48,502.73 Lowest | 680.74 ₹48,502.73 Lowest |
| 7.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
KM-1/0-2/0 | 502.27 | Cu.m | 2,535.37 ₹12,73,440.29 Lowest | 2,535.37 ₹12,73,440.29 Lowest |
| 8.00 | Applying tack coat over Un Primed WMB/ WMM surface at 7Kg of SS-1 per 10 Sqm. area including cost of bituminous binder at the site including labour charges for preparing the surface and applying the required quantity of bituminous binder as tack coat including hire charges and fuel charges for bitumen boiler and all other tools and plants employed etc., complete as per clause 503 of MOST specification..
KM-1/0-2/0 | 3,995.62 | Sqm | 84.95 ₹3,39,428.34 Lowest | 84.95 ₹3,39,428.34 Lowest |
| 9.00 | Applying tack coat over Un Primed WMB/ WMM surface at 7Kg of SS-1 per 10 Sqm. area including cost of bituminous binder at the site including labour charges for preparing the surface and applying the required quantity of bituminous binder as tack coat including hire charges and fuel charges for bitumen boiler and all other tools and plants employed etc., complete as per clause 503 of MOST specification..
Km.0/0-2/100 | 4,050 | Sqm | 19.62 ₹79,461 Lowest | 19.62 ₹79,461 Lowest |
| 10.00 | BITUMINOUS CONCRETE 30 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 complete
KM-1/0-2/0 | 101.25 | Cu.m | 10,919.97 ₹11,05,646.96 Lowest | 10,919.97 ₹11,05,646.96 Lowest |
Tender Value
Refer Docs
EMD Value
₹1.3 L
Closing Date
10 Dec 2025, 3:00 pmClosed
The Block Development Office, Vandavasi (B.Pt)
The Block Development Office, Vandavasi (B.Pt)
Detailed Project Report for the work of strengthening of Punnai Osur road at PunnaiPanchayat in Vandavasi Block of Thiruvannamalai District
2025_RDTN_626700_1
Roc. AS No 565/2025/A6 Dt. 09.2025
Open Tender
Civil Works
Lump-sum
180 days
The Block Development Office, Vandavasi (B.Pt)
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1.3 L
Yes
12 Dec 2025
26 Nov 2025
10 Dec 2025
26 Nov 2025
10 Dec 2025
26 Nov 2025
Amount
Detailed Project Report for the work of strengthening of(R-69.VPR) Punnai -Osur road 0/0-1/380 km @ PUNNAI Panchayat in Vandavasi Block of Thiruvannamalai District
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Picking old metalled / BT surface upto 10cm thick as directed by the departmental officers
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water and other item which may be necessary or convenient to the succesful completion of the excavation in a compacted condition a quality of materials not exceeding the amount of excavation including all machinery charges for T&P employed etc., complete for cutting side drains and forming berms as per standard specifications.
Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp for base-course and side berms KM.0/0-1/0
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. KM-1/0-2/0
Applying tack coat over Un Primed WMB/ WMM surface at 7Kg of SS-1 per 10 Sqm. area including cost of bituminous binder at the site including labour charges for preparing the surface and applying the required quantity of bituminous binder as tack coat including hire charges and fuel charges for bitumen boiler and all other tools and plants employed etc., complete as per clause 503 of MOST specification.. KM-1/0-2/0
Applying tack coat over Un Primed WMB/ WMM surface at 7Kg of SS-1 per 10 Sqm. area including cost of bituminous binder at the site including labour charges for preparing the surface and applying the required quantity of bituminous binder as tack coat including hire charges and fuel charges for bitumen boiler and all other tools and plants employed etc., complete as per clause 503 of MOST specification.. Km.0/0-2/100
BITUMINOUS CONCRETE 30 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 complete KM-1/0-2/0
Sub Estimate for CC Pavement
Supplying and erecting centering for sides and soffits including supports and strutting up to 3.20 m height for plane surface in all floors with all cross bracing using mild steel of size 0.90 cm x 60 cm and 10 guage stilfaned welded with mild steel angle
Construction of un re-inforced dowel Jointed at expansion and construction joint only plain cement concrete pavement thickness as per design, over a prepared sub base with 43 Grade
Bitumen
Providing HM stones (0.75*0.23*0.10)
Providing KM stones
Provision for Name board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
LOKESH (BID ID -1530879)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.24 MB
Tenderdocument.pdf
Tender Documents • 1.29 MB
BOQ_749342.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .