Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.4 LAccepted-AOC | ₹24.4 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹24.5 LRejected-AOC | ₹24.5 L | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | M/s.MM Constructions L2 | 7HILLS INFRASTRUCTURE L1 |
|---|---|---|---|---|---|
| 1.001.Construction of Retaining Wall @ Therveethi H/O Kamandoddi.Est.Amt.Rs:-24.65 Lakhs. | |||||
| 2.00 | Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation. | 147.11 | cum | 264.23 ₹38,870.88 | 263.48 ₹38,760.54 |
| 3.00 | Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification | 18.39 | cum | 5,340.06 ₹98,203.70 | 5,324.87 ₹97,924.36 |
| 4.00Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid) | |||||
| 5.00 | Sides | 490.36 | Sqm | 548.43 ₹2.7 L | 546.87 ₹2.7 L |
| 6.00 | Cement Concrete 1:3:6 (One Cement, Three M.Sand and Six broken stone jelly) using 40mm size hard broken stone jelly for dummy columns, excluding cost of centering shuttering reinforcement grills and fabrication charges but including curing etc. complete. (Reinforced Cement Concrete 1:2:4 for slab to be extended upto top of splashing with pressed tiles and future extension rods to be embedded in CC 1:3:6 (One Cement, Three M.Sand and Six hard broken stone jelly). Dummy columns should be at least 1 metre height) | 295.29 | cum | 5,643.12 ₹16.7 L | 5,627.06 ₹16.6 L |
| 7.00 | Provision for Weep Holes | 1 | no | 1,001.7 ₹1,001.70 | 998.85 ₹998.85 |
| 8.00 | Provision for Name Board Charges | 1 | no | 1,001.7 ₹1,001.70 | 998.85 ₹998.85 |
| 9.00 | Provision For Photocharges | 1 | no | 500.85 ₹500.85 | 499.42 ₹499.42 |
| 10.00 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) | 1 | GST Amount | 3,73,475 ₹3.7 L | 3,72,413 ₹3.7 L |
Tender Value
₹24.6 L
EMD Value
₹25,000
Closing Date
25 Nov 2025, 3:00 pmClosed
The Block Developement Officer (V.P) Shoolagiri
The Block Development Office Shoolagiri
Krishnagiri District Shoolagiri Block under the Scheme Mines and Minerals_2023_24 Construction of Retaining Wall at Therveethi in Kamandoddi Panchayat Package No_2025_26_SGI_81
2025_RDTN_625743_1
Rocno_1907_2025_E2
Open Tender
Civil Works
The Block Development Office Shoolagiri
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹25,000
Yes
The Block Development Office Shoolagiri
16 Mar 2026
22 Nov 2025
25 Nov 2025
22 Nov 2025
25 Nov 2025
22 Nov 2025
24 Nov 2025
Amount
1.Construction of Retaining Wall @ Therveethi H/O Kamandoddi.Est.Amt.Rs:-24.65 Lakhs.
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification
Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid)
Sides
Cement Concrete 1:3:6 (One Cement, Three M.Sand and Six broken stone jelly) using 40mm size hard broken stone jelly for dummy columns, excluding cost of centering shuttering reinforcement grills and fabrication charges but including curing etc. complete. (Reinforced Cement Concrete 1:2:4 for slab to be extended upto top of splashing with pressed tiles and future extension rods to be embedded in CC 1:3:6 (One Cement, Three M.Sand and Six hard broken stone jelly). Dummy columns should be at least 1 metre height)
Provision for Weep Holes
Provision for Name Board Charges
Provision For Photocharges
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
M/s.MM Constructions (BID ID -1520124)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.58 MB
PB81.pdf
Tender Documents • 0.75 MB
TB81.pdf
Tender Documents • 0.80 MB
BOQ_748257.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid