| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.5 LAccepted-AOC | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹30.3 L+₹5.8 L (23.8%)Rejected-Finance | L2 | Rejected-Finance BEING NOT L1 |
Tender Value
₹35 L
EMD Value
₹70,000
Closing Date
26 Jul 2022, 6:00 pmClosed
GE AF OJHAR
GE AF OJHAR
PERIODICAL SERVICES AND CAMOFLAUGE PAINTING AT DOMESTIC AND TECHNICAL AREA AT AF STATION OJHAR
2022_MES_534688_1
8895/E8
Open Tender
Civil Works
Item Rate
335 days
OJHAR
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
Yes
GE AF OJHAR
₹70,000
Yes
10 Aug 2022
30 Jun 2022
28 Jul 2022
1 Jul 2022
26 Jul 2022
13 Jul 2022
Amount
Preparation of old surfaces by scrapping down smoke soot, moulds, moss and efflorescent salts and greasy spots,removing nails and make the surface smoth by using sand paper and fill the holes with putty etc., and applying one coat of white wash on walls including cornices etc.complete all as specified and as directed by Engineer in charge
All as item No 1 but in two coats complete.
All as per serial item No.1 above but one coat of white wash on ceilings complete all as specified and as directed by Engineer in charge.
Complete Removal of existing treatment by scrapping down smoke soot, moulds, moss and efflorescent salts and greasy spots, plastic emulsion paint, synthetic enamal paint and removing nails and fill the holes with putty etc and applying two coat of Oil bound distemper using roller, brushes including in patches over a coat of primer coat of 1.50 mm thick in two layers putty and minimum 6 hr interval between the coats on surfaces complete of wall. all as specified and as directed by Engineer in charge
Preparation of old surfaces by scrapping down smoke soot, moulds, moss and efflorescent salts and greasy spots, removing nails by mannual and fill the holes with putty etc. and applying one coat of distemper oil emulsion white or tinted on walls including in patches also , cornices by roller machine etc.complete all as as specified and as directed by Engineer in charge
Preparation of old surfaces by scrapping down smoke soot, moulds, moss and efflorescent salts and greasy spots, removing nails by mannual and fill the holes with putty etc. and applying Two coats of distemper oil emulsion white or tinted on walls including in patches in cornices by roller machine etc.complete all as as specified and as directed by Engineer in charge
Preparation of old painted surfaces of wood and wood based of any description, not otherwise described, over 10 cm width or girth filling of cracks, holes with wooden putty and matching the surfae to existing and applying one coat of synthetic enamel paint complete all as specified and as directed by Engineer in charge
All as item No 7 but in two coats complete.
Preparation of old painted surfaces of steel and iron of any description, over 10 cm in width or girth, not otherwise described include for all necessary preparatory work required and applying one coat of synthetic enamel paint complete all as specified and directed by Engineer in charge.
All as item No 9 above but in two coats complete.
All as item No 9 above but in two coats including primer complete.
Preparation of old painted surfaces of steel and iron of any description, over 10 cm in width or girth, not otherwise described include for all necessary preparatory work required and applying one coat of Aluminium paint complete all as specified and directed by Engineer in charge.
Preparation of old painted surfaces of steel and iron of any description, n exc 10 cm in width or girth, not otherwise described include for all necessary preparatory work required and applying one coat of synthetic enamel paint complete all as specified and directed by Engineer in charge.
Complete Removal of existing treatment on old surfaces of wall/ ceiling and make the surface smooth by rubbing/filling the holes with cement based wall care putty and applying two coat of cement base paint white or tinted including cornices etc.complete all as specified and as directed by Engineer in charge. Note : Curing is essential before & after application of cement base paint. Contractor is make his proper arrangement of work scaretted in all the buildings.
Preparation of old surfaces of wall/ceiling by brooming down and applying one coat of cement paint white or tinted on walls including cornices etc complete all as specified and as directed by Engineer in charge. Note : Curing is essential before & after application of cement base paint. Contractor is make his proper arrangement of work scaretted in all the buildings.
Complete removal of existing treatment & cleaningby including vacuume based sanding machine removing nails etc, and applying Two coats of exterior Acrylic emulsion (Apex)/Equivalent of as white/sappire blue/dark blue or as approved over one coat of exterior water based wall primer and making good the even on surface by filling with wall care putty on walls, ceiling, facias, beams, cornices etc with and including provision of scaffolding required for the treatment to external surfaces of building with required safety measures etc complete all as specified and as directed by Engineer in charge. Note : The work shall be executed stage wise and each stage approved by Engr-in-Charge. Stage 1 : Complete removal of existing treatment. Stage 2 : Priming with exterior water based wall priming Stage 3 : 1st coat of exterior Acrylic emulsion (Apex)/Berger weather coat) of any colour Stage 4 : 2nd coat of exterior Acrylic emulsion ((Apex)/Berger weather coat) of any colour
Preparation of old surfaces by brooming down and applying One coat of exterior Acrylic emulsion (Apex)/Equivalent as white/sappire blue/dark blue or as approved on walls, kerb stone, ceiling, facias, beams, cornices and other misc works etc with and including provision of scaffolding required for the treatment to external surfaces of building with required safety measuers etc complete complete all as specified and as directed by Engineer in charge.
M&L Preparation of old surfaces by scrapping down smoke soot, moulds, moss and efflorescent salts and greasy spots , removing nails etc,for one coats of Plastic emulsion paint on old wall surfaces including Priming paint plaster coat for preparing the old surfaces to make even and smooth surfaces . Complete all as specified and as directed by Engineer-In-Charge.
All as item No 18 but in two coats including in patches complete.
M & L for Writing Letters or figures (Block,Roman,Italic or Indian) n.exc 30cm high complete all as specified and as directed by Engineer in charge
M&L cutting of grooves size 10mm deep and 10mm wide using groove cutting machine etc and make good the damaged surface make with cement based putty/CM 1:4 including finishing the surface to make with existing wall finishes complete
Complete removal of existing treatment & cleaningby including vacuume based sanding machine removing nails etc, and applying Two coats of exterior Acrylic emulsion (Apex)/Equivalent of as Camouflage pattern or as pattern approved by Engr-in-Charge over one coat of exterior water based wall primer and making good the even on surface by filling with wall care putty on walls, ceiling, facias, beams, cornices etc with and including provision of scaffolding required for the treatment to external surfaces of building with required safety measures etc complete all as specified and as directed by Engineer in charge. Note : The work shall be executed stage wise and each stage approved by Engr-in-Charge. Stage 1 : Complete removal of existing treatment. Stage 2 : Priming with exterior water based wall priming Stage 3 : 1st coat of exterior Acrylic emulsion (Apex)/Berger weather coat) of any colour Stage 4 : 2nd coat of exterior Acrylic emulsion ((Apex)/Berger weather coat) of any colour
Preparation of old surfaces and applying one coats of exterior Acrylic emulsion (Apex)/Equivalent of Camouflage pattern or pattern approved by Engr-in-Charge including patches and making good to existing pattern complete all as specified and as directed by Engineer in charge.
Taking down cement plaster on brick or stone walls, etc. including raking out joints, hacking for key, scrubbing down with water, etc.
M&L for 15 mm thick cement plaster in CM 1:6 on brick surface finished even and smooth without using extra cement including in patches Complete all as specified and directed by Engineer-in-charge.
M&L for 15 mm thick cement plaster in CM 1:4 on brick surface finished even and smooth without using extra cement including in patches Complete all as specified and directed by Engineer-in-charge.
All as per item No 26 above but in up to 10mm thick CM 1:3 as in ceiling, Chajja colounms, soffit/edges of roof slab including in patches Complete all as specified and directed by Engineer-in-charge.
M&L preparation of newly plastered surface of wall and applying 2 coats of cement based paint on on ecoat of alkali resistant primer complete.
M &L for preparation of newly plastered surfaces at walls and applying the 2 coat of Oil bound distemper over 1 coat of primer Complete all as specified and directed by Engineer-in-charge.
M &L for preparation of newly plastered surfaces at ceiling and applying the 3 coat of white wash.Complete all as specified and directed by Engineer-in-charge.
M&L Texture paint two coats of any colour/pattern by complete removcal of existing treatment including primer and base coat prepertry to texture paint with preparation for wall with 1.5mm thick wall care putty in two layers for texture paint complete all as specified and directed by Engr-in-charge, Make : Royal of M/s Asian paints/ Equivelent ion Berger Note : The texture of above paint shall be of multiple designs and by using different materials/ Specifications. The Contractor shall make sample of texture and get approved before placeing bulk order. rate are deemed to include this espect.
Note : (a) The effected glass pane, wiremesh, door, window, wall tiles and floor to be cleaned immedetly after the periodical services. If Contractor doesnot clear the glass/wiremeshes immedietly in that case he will replace the wiremesh/ glasses detoriated due to his negligency nothing shall be paid extra. (b) Periodical of residencial accn shall be completed within 2 days i.e 48 hrs after handover of key. (c) The contractor shall increase the labour at the time of inspections and as directed by Engr-in-Charge without any extra payment. (d) Contractor shall made own arrengment for climbing and working upto 16 mtr ht. (e) Work is comprise of to be executed in scattered area at different locations, as and when the requirement of periodical services projected by the users. Qtrs/ bldgs shall be made available as per the site requirements projected by the users. All the qtrs/ area cannot be handed over at one time but will be handed over in piece meal manner. (f) Only 1st quality materials shall be used by the contractor and the materials shall be purchased and stocked at his store of sufficent qty for which requirement as per site projected to him. The ledger of the materials qty shall be maintained by the contrator and got verified at the time of payment with original voucher. (g) All the conditions mentioned above shall be complied by the contractor and ratse are deemed to include such provisions, Nothing extra shall be paid.
GUND PARAG JAGANNATH
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .