Loading…
Loading…
| # | Company | Offered Item | Amount | Rank |
|---|---|---|---|---|
| 1 | L1₹6.4 L Construction of back side boundary wall with concertina coil fencing at I.B. Post Baddi (HP). Balance Work. | Construction of back side boundary wall with concertina coil fencing at I.B. Post Baddi (HP). Balance Work. | L1 | |
| 2 | L2₹8.5 L+₹2.1 L (32.6%) Construction of back side boundary wall with concertina coil fencing at I.B. Post Baddi (HP). Balance Work. | Construction of back side boundary wall with concertina coil fencing at I.B. Post Baddi (HP). Balance Work. | L2 | |
| 3 | - | - |
| Sl No | Description | Qty | Unit | AKSHAY SHARMA L2 | M/S AMAN SHARMA L1 |
|---|---|---|---|---|---|
| 1 | (Civil Work) | - | - | 18 ₹8,49,518.58 | -11 ₹6,40,738.59 Lowest |
Tender Value
₹7.2 L
EMD Value
₹14,399
Closing Date
7 Aug 2025, 3:00 pmClosed
EE-Shimla-II
SHASHWAT GAUR
Shimla, EE-Shimla-II
Construction of back side boundary wall with concertina coil fencing at I.B. Post Baddi (HP). Balance Work.
121515
76/EE-II/SD/AE-Kasauli/2025-26(Rcall)
OPEN
Repair and Maintenance
NCB
2 months
Solan, Himachal Pradesh
12 documents required · 12 mandatory
₹14,399
Not Applicable
7 Aug 2025
30 Jul 2025
7 Aug 2025
7 Aug 2025
6 Aug 2025
stage.html
html • 0.08 MB
boq_comp_chart.xls
xls
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Index.pdf
document • 0.70 MB
NIT.pdf
document • 1.15 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .