Loading…
Loading…
Tender Value
₹2.5 Cr
EMD Value
₹2.5 L
Closing Date
22 Jun 2026, 5:30 pm
EXECUTIVE ENGINEER P.W.D. DIVISION NO 1 BALAGHAT
EXECUTIVE ENGINEER P.W.D. DIVISION NO 1 BALAGHAT
FOR SPECIAL STRENTHENING WORK OF 1.GARRA-PIPARIYA RD. LN -2.20.2.SELVATPAR - TUIYAPAR RD. LN -2.00 3. BRAMHANTOLI DOKE KOTHURNA RD.LN -4.00 KM.4. KOTHURNA-GONDITOLA RD.LN -1.00 KM.5. ARMBHA-BAKODI RD.LN-1.40 KM.6.AGARI JARAHMOHGAON RD.LN -2.40 KM.
2026_PWDRB_513059_1
10-1/SAC/2026-27 BALAGHAT DATE 04/06/2026
Open Tender
Civil Works - Roads
90 days
CHIEF ENGINEER (C.Z.) P.W.D. JABALPUR
Please refer Tender documents.
4 documents required · 4 mandatory
₹15,000
₹2.5 L
4 Jun 2026
4 Jun 2026
24 Jun 2026
4 Jun 2026
22 Jun 2026
4 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1CONSTRUCTION WORK | ||||||
| 1.01 | SPECIAL STRENTHENING WORK OF 1. GARRA - PIPARIYA ROAD LENGTH-2.20.
2.SELVATPAR - TUIYAPAR ROAD LENGTH-2.00
3. BRAMHANTOLI DOKE KOTHURNA ROAD LENGTH-4.00 KM.
4. KOTHURNA - GONDITOLA ROAD LENGTH-1.00 KM.
5. ARMBHA - BAKODI ROAD LENGTH-1.40 KM.
6.AGARI JARAHMOHGAON ROAD LENGTH-2.40 KM. | - | Nos | 2,49,13,000 | - | BI01010001010000000000000515BI0100001113 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.07 MB
Tenderdocument01.pdf
Tender Documents • 28.27 MB
GSchedule.pdf
Tender Documents • 1.30 MB
BOQ_618086.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid