| # | Schedule | Awarded To | Bids | Value |
|---|---|---|---|---|
| 1 | Schedule 1 | D K INSTRUMENTS PVT LTD | 1 | ₹29,205 |
| 2 | Schedule 2 | D K INSTRUMENTS PVT LTD | 1 | ₹9,735 |
| 3 | Schedule 3 | D K INSTRUMENTS PVT LTD | 1 | ₹9,735 |
| 4 | Schedule 4 | D K INSTRUMENTS PVT LTD | 1 | ₹14,278 |
| 5 | Schedule 5 | D K INSTRUMENTS PVT LTD | 1 | ₹30,916 |
Tender Value
Refer Docs
EMD Value
Exempted
Closing Date
28 Jul 2025, 2:00 pmClosed
OPERATING PRESSURE 0.61 KG BY CM2 G SHOULD BE SUITABLE FOR MOUNTING PAD 6 EQUIDISTANT HOLES M12 ON PCD 235 mm
ID 155 mm
OD 262mm
OPERATING PRESSURE 0.55 KG BY CM2 G SHOULD BE SUITABLE FOR MOUNTING PAD 6 EQUIDISTANT HOLES M12 ON PCD 235 mm
ID 155 mm
OD 262mm
OPERATING PRESSURE 0.53 KG BY CM2 G SHOULD BE SUITABLE FOR MOUNTING PAD 6 EQUIDISTANT HOLES M12 ON PCD 235 mm
ID 155 mm
OD 262mm
OPERATING PRESSURE 0.49 KG V CM2 G SHOULD BE SUITABLE FOR MOUNTING PAD 4 EQUIDISTANT HOLES M13 ON PCD 125 mm
PIPE SIZE 50mm NB GAS VOLUME RANGE AS PER IS 3637 175 TO 225 cc RATE OF STEADY FLOW OF OIL AS PER IS 3637
75 TO 140 CM BY SEC
PIPE SIZE 80mm NB GAS VOLUME RANGE AS PER IS 3637 200 TO 300 cc RATE OF STEADY FLOW OF OIL AS PER IS 3637
90 TO 160 CM BY SEC
8056029
GEM/2025/B/6423442
Two Packet Bid
OPERATING PRESSURE 0.61 KG BY CM2 G SHOULD BE
90 days
K Chowdary507116STORES UNIT, HWP MANUGURU, P.O. GAUTAMINAGAR, ASWAPURAM, KHAMMAM
Item wise evaluation
BOQ
1 document required · 1 mandatory
Exempted
8 Jul 2025
8 Jul 2025
28 Jul 2025
SUPPLY OF PRESSURE RELIEF VALVES FOR TRANSFORMER
OPERATING PRESSURE 0.61 KG BY CM2 G SHOULD BE SUITABLE FOR MOUNTING PAD 6 EQUIDISTANT HOLES M12 ON PCD 235 mm
OPERATING PRESSURE 0.55 KG BY CM2 G SHOULD BE SUITABLE FOR MOUNTING PAD 6 EQUIDISTANT HOLES M12 ON PCD 235 mm
OPERATING PRESSURE 0.53 KG BY CM2 G SHOULD BE SUITABLE FOR MOUNTING PAD 6 EQUIDISTANT HOLES M12 ON PCD 235 mm
OPERATING PRESSURE 0.49 KG V CM2 G SHOULD BE SUITABLE FOR MOUNTING PAD 4 EQUIDISTANT HOLES M13 ON PCD 125 mm
PIPE SIZE 50mm NB GAS VOLUME RANGE AS PER IS 3637 175 TO 225 cc RATE OF STEADY FLOW OF OIL AS PER IS 3637
75 TO 140 CM BY SEC
PIPE SIZE 80mm NB GAS VOLUME RANGE AS PER IS 3637 200 TO 300 cc RATE OF STEADY FLOW OF OIL AS PER IS 3637
90 TO 160 CM BY SEC
SUPPLY OF PRESSURE RELIEF VALVES FOR TRANSFORMER AND BUCHHOLZ RELAY FOR TRANSFORMER
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_8056029.pdf
GEM_BID
XII_46f0cb89-6f12-49ee-94231751872122577_mprpum.docx
OTHER
list-of-categories-where-trials-are-allowed_1712126171.pdf
OTHER
gtc.pdf
OTHER
23898_annexure_2025-07-07-11-44-07_6effd227b79e178e70b57653dcbc9747.pdf
BOQ
23898_2025-07-07-11-44-07_5d1a5762c44eadc64dff09e00b89d847.csv
BOQ
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .