| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.6 CrAccepted-AOC | ₹9.6 Cr | L1 | Accepted-AOC Rate quoted by the firm is justified and workable |
| 2 | L2₹11.4 Cr+₹1.9 Cr (19.3%)Rejected-Finance | ₹11.4 Cr+₹1.9 Cr (19.3%) | L2 | Rejected-Finance Firm not qualified in financial evaluation |
| 3 | L3₹11.6 Cr+₹2.0 Cr (21.2%)Rejected-Finance | ₹11.6 Cr+₹2.0 Cr (21.2%) | L3 | Rejected-Finance Firm not qualified in financial evaluation |
| 4 | Rejected-Technical VILL P O TIKOLA KALAN ROORKEE HARIDWAR | HARIDWAR | UTTARAKHAND | 247656 | - | - | Rejected-Technical Firm not qualified in technical evaluation |
| 5 | Rejected-Technical | - | - | Rejected-Technical Firm not qualified in technical evaluation |
Tender Value
₹11.6 Cr
EMD Value
₹9.1 L
Closing Date
15 Jun 2020, 12:00 pmClosed
Chief Engineer Project Beacon
HQrs Chief Engineer Project Beacon Old Airport Road Rangreth Srinagar
DESIGN AND CONSTR OF 130.00 MTR MULTI SPAN MAJOR PMT PSC BOX GIRDER BRIDGE OVER BALINI RIVER AT KM 15.661 INCLUDING SSI AND PROOF CHECKING BY IIT OR NIT ON JAMMU SRINAGAR ROAD UNDER 52 RCC SECTOR 35 BRTF PROJECT BEACON IN JAMMU AND KASHMIR UT
2020_BRO_556572_1
CE (P) BCN/02/2020-21
Open Tender
Civil Works - Bridges
Lump-sum
913 days
Km 15.661 on Jammu-Srinagar Road
Please refer tender documents
13 documents required · 13 mandatory
₹1
Yes
₹9.1 L
Yes
HQrs Chief Engineer Project Beacon Old Airport Roa
23 Jul 2020
25 Apr 2020
16 Jun 2020
27 Apr 2020
15 Jun 2020
6 May 2020
30 Apr 2020 - 2 May 2020
5 May 2020
Amount
SSI, DESIGN INCLUDING PROOF CHECKING BY IIT/NIT AND CONSTRUCTION OF 130.00 MTR (40+50+40 MTR) MULTI SPAN MAJOR PMT PSC BOX GIRDER BRIDGE OVER BALINI RIVER AT KM 15.661 INCLUDING SSI AND PROOF CHECKING BY IIT/NIT ON JAMMU-SRINAGAR ROAD UNDER 52 RCC SECTOR 35 BRTF/ PROJECT BEACON IN JAMMU AND KASHMIR (UT) AS PER NIT DRAWING AND BASED ON HYDRAULIC DATA, GROUND DATA, SUB SOIL DATA, SPECIAL CONDITIONS AND PARTICULAR SPECIFICATIONS OF THE TENDER DOCUMENTS. CONSTRUCTION WORK INCLUDES ALL PREPARATORY WORK, ERECTION OF STAGING /SHUTTERING, ABUTMENTS, RETURN WALL, PLACING OF POT & POT CUM PTFE BEARINGS, CASTING OF SUPERSTRUCTURE, WEARING COAT HAVING NON SKID SURFACE IN UNIFORM THICKNESS, STRIP SEAL EXPANSION JOINTS, RCC CRASH BARRIERS, FOOTPATHS, KERBS, RCC HAND RAILS, DRAINAGE SPOUT, LOAD TESTING OF SUPERSTRUCTURE OF BRIDGE, SERVICE ARRANGEMENT FOR UTILITY, PAINTING OF ALL EXPOSED STEEL WORKS, PROTECTIVE WORKS, TEMPORARY RIVER TRAINING WORKS AND DIVERSION; AND ALL OTHER ITEMS OF WORKS REQUIRED AND NECESSARY FOR THE COMPLETE CONSTRUCTION OF THE BRIDGE INCLUDING CURING BUT EXCLUDING WORKS ON APPROACHES AND APPROACH SLAB.
Navnirman Construction Company
MIRSONS CONSTRUCTION
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .