| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹11.6 LAdmitted-Finance BAL VIDYA MODEL SCHOOL H NO 45 KH NO 74 19 BLOCK H LAXMI PARK NANGLOI NEW DELHI 110041 | WEST DELHI | DELHI | 110041 | -45.63% | ₹11.6 L | L1 | Admitted-Finance |
| 2 | L2₹12.4 LAdmitted-Finance | -41.89% | ₹12.4 L | L2 | Admitted-Finance |
| 3 | L3₹14.7 LAdmitted-Finance | -31.07% | ₹14.7 L | L3 | Admitted-Finance |
Tender Value
₹21.3 L
EMD Value
₹42,566
Closing Date
26 Feb 2026, 3:00 pmClosed
Executive Engineer
EE/HCD-9/DDA
Miscellaneous Repair Works at Kalindi Aviral.
2026_DDA_899718_1
52/EE/HCD-9/DDA/2025-2
Open Tender
Civil Works
45 days
As Per NIT
Please refer Tender documents.
12 documents required · 12 mandatory
₹0
₹42,566
9 Mar 2026
21 Feb 2026
27 Feb 2026
21 Feb 2026
26 Feb 2026
21 Feb 2026
Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m inwidth or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift , including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.
Providing and laying in position cement concrete of specified gradeexcluding the cost of centering and shuttering - All work up to plinth level :1:5:10 (1 cement : 5 coarse sand (zone-III) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources)
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lift.
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:4 (1 cement : 4 coarse sand)
Stone work, plain in copings, cornices, string courses and plinth courses, upto 75 mm thick in Cement mortar 1:6 (1 cement : 6 coarse sand), including pointing with white cement mortar 1:2 (1 white cement : 2 stone dust) with an admixture of pigment matching the stone shade.Red sand stone
Stone work, plain in copings, upto 75 mm thick in Cement mortar 1:6 (1 cement : 6 coarse sand), including pointing with white cement mortar 1:2 (1 white cement : 2 stone dust) with an admixture of pigment matching the stone shade. Red sand stone (Old red sand stone shall be supplied by the department free of cost).
Dismantling stone slab flooring laid in cement mortar including stacking of serviceable material and disposal of unserviceable material within 50 metres lead.
Providing and laying 75 mm thick compacted bed of dry brick aggregate of 40 mm thick nominal size including spreading, well ramming, consolidating and grouting with jamuna sand, including finishing smooth etc. complete as per direction of Engineer-in-charge.
Providing and laying at or near ground level factory made kerb stone of C & D waste of M-25 grade cement concrete in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5mm), including making drainage opening wherever required complete etc. as per direction of Engineer-in charge (length of finished kerb edging shall be measured to calculate volume for payment). (C & D kerb stone shall be approved by Engineer-in-charge).
Taking out existing kerb stones of all types from footpath/ central verge, including removal of mortar etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge.
Laying at or near ground level old kerb stones of all types in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement : 3 coarse sand), including making joints with or without grooves (thickness of joints, except at sharp curve, shall not be more than 5 mm), including making drainage opening wherever required etc. complete as per direction of Engineer-in-charge. (Length of finished kerb edging shall be measured for payment). (Old kerb stones shall be supplied by the department free of cost)
Supplying and stacking at site Good earth
Spreading of Good Earth , watering and rolling complete including preparation of the surface and rolling. With road roller/ hand roller (Suppy and stacking will be paid extra):6mm thick
Providing edge moulding to 40 mm thick Red Sand stone counters, Vanities etc., complete as per design approved by Engineer-in-Charge.
Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in- Charge: All kinds of soil
After Applying GST Correction [email protected]
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.95 MB
BOQ_945706.xls
BOQ • 0.34 MB
NIT52.pdf
Tender Documents • 1.52 MB
Download all tender documents and submit your bid