Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.8 LAccepted-AOC | L1 | Accepted-AOC Being lowest | |
| 2 | L2₹25.0 L+₹4.2 L (20.0%)Rejected-Finance | L2 | Rejected-Finance Being not lowest | |
| 3 | L3₹26.3 L+₹5.5 L (26.5%)Rejected-Finance | L3 | Rejected-Finance Being not lowest | |
| 4 | L4₹26.6 L+₹5.8 L (28.0%)Rejected-Finance | L4 | Rejected-Finance Being not lowest | |
| 5 | L5₹28.0 L+₹7.2 L (34.7%)Rejected-Finance | L5 | Rejected-Finance Being not lowest |
Tender Value
₹35 L
EMD Value
₹70,000
Closing Date
30 Nov 2020, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CWE (AF) BAMRAULI
HQ CWE AF BAMRAULI ALLAHABAD-211012
REPAIR TO DRAIN, PCC, JOINT FILLING AND LINE MARKING IN DISPERSAL AND PAVEMENT AREA AT AF STATION GORAKHPUR
2020_MES_374870_2
87095/C/E8
Open Tender
Civil Works
Item Rate
182 days
Gorakhpur
Please refer Tender documents.
9 documents required · 9 mandatory
₹500
GE (AF) Gorakhpur
₹70,000
Yes
23 Dec 2020
13 Nov 2020
2 Dec 2020
13 Nov 2020
30 Nov 2020
13 Nov 2020
60 days
Amount
Cutting grass manually and removing material out side MOD land obtained from cutting and cleaning both side runway PTT near DTGM board complete all as specified and directed. Note :- (i) Grass shall be cut and finished 10 mm to 25 mm above the existing ground level. (ii) All foreign materials (stone pieces etc) obtained during cutting of grass shall be removed from out side MOD land. (iii) Materials obtained from cutting of grass shall be removed out side of MOD land
Material and Labour for obtaining approved earth ( stabilized soil) from out side defence land to a distance as per requirement and bring out to site and deposited for forming embankment/ filling berms including spreading in layers not exceeding 30 centimetre thick, levelled and ramming with 8 to 10 tonne mechanical roller including watering complete all as specified and directed. Note :- (i) To arrive finished quantity for payment purpose consolidation thickness shall be measured. (ii) Earth shall be free from foreign material, ie, grass, roots etc. (iii) The consolidation shall be done by heavy mechanical machinery of capacity exceeding 3 tonne. (iv) The specified standard proctor density under optimum moisture conditions shall be obtained and 5% deduction for bulkage shall be made.
Material and labour rolling and consolidating formation surfaces, sub grade / runway shoulder with power roller of capacity exceeding 8 tonnes and not exceeding 12 tonne complete all as specified and directed by Garrison Engineer/ Engr-in-Charge.
Material and labour providing, plain cement concrete 1:2:4 type B1, (20mm graded crushed stone aggregate) in copings, and the like including weathering, slightly rounded or chamered angles and throating, including necessary form work complete all as specified and directed by Garrison Engineer/ Engr-in-Charge.
Material and labour brick work except bricks straight or curved on plan exceeding 6 metre mean radius, built in cement and sand mortar (1:4) complete all as specified and directed by Garrison Engineer / Engr-in-Charge. Note :- (i) Serviceable Bricks obtained under demolition of respective item shall be used.
Material and labour brick work with sub-class 'B' bricks (old size bricks) straight or curved on plan exceeding 6 metre mean radius, built in cement and sand mortar (1:4) complete all as specified and directed by Garrison Engineer/ Engr-in-Charge.
Material and labour brick work with sub-class 'B' bricks (old size bricks) laid flat, in floors, bedded and jointed in cement mortar 1:6 and pointed in cement mortar 1:3 complete all as specified and directed by Garrison Engineer/ Engr-in-Charge.
Material and labour brick work with sub-class 'B' bricks (old size bricks) laid on edge , in floors, drains etc bedded and jointed in cement mortar 1:6 and pointed in cement mortar 1:3 complete all as specified and directed by Garrison Engineer/ Engr-in-Charge.
Material and labour brick work except bricks laid flat, in floors, saucer drains etc bedded and jointed in cement mortar 1:6 and pointed in cement mortar 1:3 complete all as specified and directed by Garrison Engineer/ Engr-in-Charge.
Material and labour 100mm thick plain cement concrete 1:2:4 type B-2, (Using 40mm graded crushed stone aggregate) laid in alternate bays as floor, finished concrete surface with spike rolling or making impression of expanded metal whilst the concrete is green including necessary form work complete all as specified and directed by Garrison Engineer/ Engr-in-Charge.
Material and labour 15 mm thick rendering in cement and sand mortar (1:4) on fair faces of brick work surfaces finished even and fair complete all as specified and directed by Garrison Engineer/ Engr-in-Charge.
Material and labour raking out joints / pointing to brick work or brick tiles, built in cement or cement lime mortar laid flat, in floors, surface channel or roofs etc complete all as specified and directed by Garrison Engineer/ Engr-in-Charge.
Material and labour flush pointing to bricks laid flat or brick tiles in pavings / saucer drains, in cement mortar 1:3 complete all as specified and directed by Garrison Engineer/ Engr-in-Charge.
Material and Labour for preparation of old painted concrete surfaces with washing down soap water of runway, taxi track road for painting with mechanical mode of application as lines, dashes, arrows, letters and the like exceeding 10cm width or girth and applying one coat of runway road marking paint aqua based golden, yellow, or white colour as approved by Garrison Engineer to give uniform finish complete all as specified and directed. Note :- Masking tape should be used on edges of paints before painting work and removed the masking tape after paint is applied where ever required and as directed by Engineer-in-Charge.
Material and Labour for preparation of old painted concrete surfaces with washing down with soap water of runway, taxi track, road for painting with mechanical mode of application as lines, dashes, arrows, letters and the like not exceeding 10cm width or girth and applying one coat of runway road marking paint aqua based golden , yellow, or white colour as approved by Garrison Engineer to give uniform finish complete all as specified and directed. Note :- Masking tape should be used on edges of paints before painting work and removed the masking tape after paint is applied where ever required and as directed by Engineer-in-Charge.
Material and Labour for preparation of old painted concrete / plastered / unplastered surfaces of wall with washing down soap water of runway, taxi track , link, dispersal and side wall for painting with mechanical mode of application exceeding 10cm width or girth and applying one coat of synthetic enamel paint red and white in alternate square panel to give uniform finish complete all as specified and directed. Note :- Masking tape should be used on edges of paints before painting work and removed the masking tape after paint is applied where ever required and as directed by Engineer-in-Charge.
Material and Labour for preparation of old painted concrete surfaces runway, and applying one coat of cement based paint complete all as specified and directed. Note :- Masking tape should be used on edges of paints before painting work and removed the masking tape after paint is applied where ever required and as directed by Engineer-in-Charge.
Material and labour cement concrete in pavement / hard standing of flexural strength 40 Kg / per square centimetre in field using 400 Kgs of cement per cubic metre of concrete slab not exceeding 25 centimetre thick , laying pavement concrete / Hard standing in bays between joints including necessary form work complete all as specified and directed by Garrison Engineer / Engr-in-Charge. Note :- (i) Work shall be executed as per design mix as approved by GE. (ii) The content of cement as specified is minimum. Any variation in content of cement during design mix at site on plus side shall be borne by the contractor without any extra cost to the Government.
Material and Labour for repair to broken/damage portion of concrete slab or pavement of surface area not exceeding 10 square centimetre and depth not exceeding 15 mm by cutting damaged portion to slab/spoil edges to triangular / rectangular cross section and removing all loose and foreign materials and depositing the same to out side MOD land and cleaning the surface by compressed air to remove all dust dirt etc and washing with hydrochloric acid and filling epoxy resin mortar after application of epoxy primer as per manufacture instructions bull nosing the edges complete all as specified and directed. Note :- Material obtained from damaged portion of concrete slab shall be removed from out side MOD land.
Material and Labour for repair to broken/damage portion of concrete slab or pavement of surface area not exceeding 1 square metre by cutting damaged portion to slab/spoil edges to triangular / rectangular cross section and removing all loose and foreign materials and depositing the same to out side MOD land and cleaning the surface by compressed air to remove all dust dirt etc and washing with hydrochloric acid and filling epoxy resin mortar after application of epoxy primer as per manufacture instructions bull nosing the edges complete all as specified and directed. Note :- Material obtained from damaged portion of concrete slab shall be removed from out side MOD land.
Material and Labour for repair to broken/damage portion of concrete slab or pavement of surface area exceeding 1 square metre by cutting damaged portion to slab/spoil edges to triangular / rectangular cross section and removing all loose and foreign materials and depositing the same to out side MOD land and cleaning the surface by compressed air to remove all dust dirt etc and washing with hydrochloric acid and filling epoxy resin mortar after application of epoxy primer as per manufacture instructions bull nosing the edges complete all as specified and directed. Note :- Material obtained from damaged portion of concrete slab shall be removed to out side MOD land.
Material and Labour for preparing of existing construction / contraction / dummy / expansion joints including removing filled material in joints of runway by removing the cracking out joints 25 to 30 mm wide and 40 mm deep including removing all loose material and cleaning the joints with brush and removing all loose fine particles with compressed air and providing a suitable dia polyurethane back up rod/debonding strip and top 13mm primed and sealed with using polyurethane based sealing compound with suitable primer as per manufacturers recommendation polyurethane sealent complying with BS-5212 & BS -4254 and EN 141875 -2003 ( for hydrolysis / water resistance test ) priming the sides with minimum MAF± 30 % (with ten years performance guarantee ) and applying masking tape on edges of joint to prevent accidental spillage of sealent and removing the masking tape after sealent is applied complete all as specified and directed. Note :- Material obtained from removing of existing filled up materials shall be removed from out side MOD land.
Material and Labour for preparing of existing construction / contraction / dummy / expansion joint including removing filled material in joints of runway by removing the cracking out joints 20 to 25 mm wide and 30 mm deep including removing all loose material and cleaning the joints with brush and removing all loose fine particles with compressed air primed and providing a suitable dia polyurethane back up rod/debonding strip and top 15mm primed and sealed with using polyurethane based sealing compound with suitable primer as per manufacturers recommendation polyurethane sealent complying with BS-5212 & BS -4254 and EN 141875 -2003 ( for hydrolysis / water resistance test ) priming the sides with minimum MAF± 30 % (with ten years performance guarantee ) and applying masking tape on edges of joint to prevent accidental spillage of sealent and removing the masking tape after sealent is applied complete all as specified and directed. Note :- Material obtained from removing of existing filled up materials shall be removed from out side MOD land.
Material and Labour for preparing of existing construction / contraction / dummy / expansion joint including removing filled material in joints of runway by removing the cracking out joints 18 to 20 mm wide and 25mm deep including removing all loose material and cleaning the joints with brush and removing all loose fine particles with compressed air primed and providing a suitable dia polyurethane back up rod/debonding strip and top 15mm primed and sealed with using polyurethane based sealing compound with suitable primer as per manufacturers recommendation polyurethane sealent complying with BS-5212 & BS -4254 and EN 141875 -2003 ( for hydrolysis / water resistance test ) priming the sides with minimum MAF± 30 % (with ten years performance guarantee ) and applying masking tape on edges of joint to prevent accidental spillage of sealent and removing the masking tape after sealent is applied complete all as specified and directed. Note :- Material obtained to removing of existing filled up materials shall be removed from out side MOD land.
Material and Labour for preparing of existing construction / contraction / dummy / expansion joints including removing filled material in joints of runway by removing the cracking out joints 25 to 30 mm wide and 40 mm deep including removing all loose material and cleaning the joints with brush and removing all loose fine particles with compressed air and applying the bituminous primer and sealing the joints by filling sealing compound grade `B` (Jet fuel resistant) as per IS 1834-984 complete all as specified and directed. Note :- Material obtained from removing of existing filled up materials shall be removed to out side MOD land.
Material and Labour for preparing of existing construction / contraction / dummy / expansion joint including removing filled material in joints of runway by removing the cracking out joints 20 to 25 mm wide and 30 mm deep including removing all loose material and cleaning the joints with brush and removing all loose fine particles with compressed air and applying the bituminous primer and sealing the joints by filling sealing compound grade `B` (Jet fuel resistant) as per IS 1834-984 complete all as specified and directed. Note :- Material obtained from removing of existing filled up materials shall be removed to out side MOD land.
Material and Labour for preparing of existing construction / contraction / dummy / expansion joint including removing filled material in joints of runway by removing the cracking out joints 18 to 20 mm wide and 25mm deep including removing all loose material and cleaning the joints with brush and removing all loose fine particles with compressed air and applying the bituminous primer and sealing the joints by filling sealing compound grade `B` (Jet fuel resistant) as per IS 1834-984 complete all as specified and directed. Note :- Material obtained from removing of existing filled up materials shall be removed to out side MOD land.
Supply and fix 20 mm thick insulated toughened glass (5 mm thick clear toughened glass and 5 mm thick black toughened glass with 10 mm spacing between both the glass) and fixed with aluminimum beading and rubber gaskate of suitable size fixed in aluminimum frame work in ATC tower complete all as specified and directed by Garrison Engineer / Engr-in-Charge.
Supply and running of mechanical tractor minimum 40 HP capacity alongwith one skilled driver and one semi skilled helper, including fuel / lubricants etc for cutting of grass by mechanically operated Slasher wherever required including removing of materials obtained from cutting to out side of MOD land. Grass cutting is to be done upto 100 metre from the edge of runway, taxi track and parking area and height of grass shall not be more than 5 cm to 10 cm after cutting complete all as specified and directed by Garrison Engineer / Engr-in-Charge. Note:- (i) A log book shall be maintained by JE(Civil) and the same shall be signed by Engineer-in-Charge & contractor daily for the purpose of calculating daily working hours which shall be actual mode of payment. (ii) Tractor deployed shall not be more than 5 years old from the date of manufacturing. Contractor to provide the registration documents to Engr-in-Charge on this account. (iii) Actual working hours shall be calculated based on actual running of machinary as directed by Garrison Engineer and excluding of transit hours. (iv) As per site requirement contractor shall arrange more than one tractor alongwith mechanical slasher. Seperate log book shall be maintained for each tractor.
Supply and running of earth moving plant/Backhoe loader with minimum loaded capacity of one cubic metre of loaded bucket for excavation and levelling of soil alongwith one skilled driver and one semi skilled helper, including fuel / lubricants etc complete all as directed by Engineer-in-Charge. Note:- (i) A log book shall be maintained by JE(Civil) and the same shall be signed by Engineer-in-Charge & contractor daily for the purpose of calculating daily working hours which shall be actual mode of payment. (ii) Earth moving plant/Backhoe loader deployed shall not be more than 5 years old from the date of manufacturing. Contractor to provide the registration documents to Engr-in-Charge on this account. (iii) Actual working hours shall be calculated based on actual running of machinary as directed by Garrison Engineer and excluding of transit hours.
Material and labour for cutting of grass, shurbs, vegetation, bush, weed by brush cutter operated slasher where ever required including cleaning the bothe sides edges of runway / PTT removing of materials obtained from cutting to out side of MOD land complete all as specified and directed by Garrison Engineer/ Engr-in-Charge. Note :- (i) The contractor shall arrange two numbers of brush cutter machine alongwith two operator and two helper (one operator and one helper for each machine) including POl etc from 0900 hrs to 1700 hrs (including half an hour lunch break). (ii) The output of brush cutter machine shall be 1000 square metre per day per machine including cleaning/removing of materials obtained from cutting to out side of MOD land. (iii) Site/area of grass cutting shall be handed over as and when on requirement basis. Contractor shall start the work immediatly whenever site is handed over to him. (iv) A log book shall be maintained by JE(Civil) and the same shall be signed by Engineer-in-Charge & contractor daily for the purpose of calculating daily working hours which shall be actual mode of payment.
Material and Labour for weather resistance retro-reflective high intensity prismatic sheet / tape conforming to ASTM D-4956-01 type XI, of any colour / tint as per direction of Garrison Engineer/Engineer-in-Charge for writing alphabet letter, number and arrows on DTGM boards as computer plotter 64 mm or as directed stroke width complete all as specified and directed. (i) Note :- Area shall be calculated from stroke length and width of numerals / alphabets.
Material and labour for cleaning drain any shape and any size of runway and removing sludge, soil, mud, grass and vegetation roots from drain and removing of materials obtained from cleaning ie. sludge, mud, soil etc to out side of MOD land complete all as specified and directed by Garrison Engineer/ Engr-in-Charge. Note :- To determine the depth of sludge levels initially and after cleaning of drain shall be taken and recorded in MB duly signed by, Garrison Engineer, Engineer - in Charge and contractor.
Supplying, and fix in repair visible sign board of area exceeding 0.70 Square metre and not ezxceeding 1.50 square metre each made from 4 mm thick engineering grade plastic (acralic sheet) having monolithic structure to withstand temprature variations from cold environment to sweltering hot conditions and to withstand high velocity winds frmaed and braced with 40 mm dia PVC pipe best quality to with stand high ground level with best quality structure including excavating in post holes of size 30cmx30cmx45cm and embedded in PCC1:2:4 type B1 using 20mm graded stone aggregate and making plinth around frame of width 600mm and length as required, including providing / applying weather resistance coating, providing and pasting of new numerals/alpahbets with retro reflective tape cutting it as computer plotter etc complete all as specified and directed by Garrison Engineer/ Engr-in-Charge.
Supplying, and fix in repair visible sign board of area not exceeding 0.70 Square metre each made from 4 mm thick engineering grade plastic (acralic sheet) having monolithic structure to withstand temprature variations from cold environment to sweltering hot conditions and to withstand high velocity winds frmaed and braced with 40 mm dia PVC pipe best quality to with stand high ground level with best quality structure including excavating in post holes of size 30cmx30cmx45cm and embedded in PCC1:2:4 type B1 using 20mm graded stone aggregate and making plinth around frame of width 600mm and length as required, including providing and applying and weather resistance coating, providing and pastingh of new numerals/alp0hbets with retro reflective tape cutting it as computer plotter etc complete all as specified and directed. from cold complete all as specified and directed by Garrison Engineer/ Engr-in-Charge.
Supply and fixing in repairs 4 mm thick acrylic sheet of any size as in visible sign board complete all as specified and directed by Garrison Engineer/ Engr-in-Charge. Note :- Make of Acrylic sheet shall be as per sample kept in sample room of GE office/make as approved by Garrison Engineer.
Demolition of cement concrete (unreinforced) of any description and in any position not otherwise specifically provided for and removing rubbish out site MOD land complete all as specified and directed by Garrison Engineer/ Engr-in-Charge.
Demolition of brick masonry quions, arches, pillars etc, but excluding ashlar fackings, dressed stonewrk and precast concrete articles complete all as specified and directed by Garrison Engineer/ Engr-in-Charge. Note : (i) Unserviceable material retrieved under this item is contractor property and necessary amount as per schedule of credit shall be deducted from the contractor dues. (ii) Rubbish shall be removed out site MOD land. (iii) Serviceable bricks retrieved shall be reused in respective items of this schedule.
Dismantling bricks (laid flat or on edge) or bricks tiles in floors, channels, kerbs, aprons, etc (each layer) laid, bedded and pointed in any mortar complete all as specified and directed by Garrison Engineer/ Engr-in-Charge. Note : (i) Unserviceable material retrieved under this item is contractor property and necessary amount as per schedule of credit shall be deducted from the contractor dues. (ii) Rubbish shall be removed out site MOD land. (iii) Serviceable bricks retrieved shall be reused in respective items of this schedule.
M/S ARORA CONSTRUCTION
Hindustan Power Corporation
M/s Mahendra Construction
M/S SHANKER TRADERS
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .