| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.6 LAccepted-AOC PLOT NO 59 60 WAZIDPUR JAIMAU KANPUR 208010 | KANPUR NAGAR | UTTAR PRADESH | 208010 | L1 | Accepted-AOC Awarded | |
| 2 | L2₹16.8 L+₹49,006 (3.00%)Rejected-Finance H NO 113 APR COLONY KATANGA CANTT JABALPUR M P PIN 482001 | JABALPUR | MADHYA PRADESH | 482001 | L2 | Rejected-Finance Rejected | |
| 3 | L3₹17.0 L+₹62,916 (3.85%)Rejected-Finance | L3 | Rejected-Finance Rejected | |
| 4 | L4₹17.4 L+₹1.0 L (6.41%)Rejected-Finance | L4 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | M/S GR construction compony L4 | B. S BUILDERS L1 | P.H. CONSTRUCTION CO. L2 | RIZCON L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling of brick tiles or terris tiles single layer on roof of any position and or any height, jointed and grouted/pointed in cement mortar including roof treatment of any description and debris/rubbish off from site upto distance 500 mtr and depositing in low laying are of def land complete all as specified and directed by Engineer-in-Charge | 1,388 | Sqm | 20 ₹27,760 | 9 ₹12,492 | 5 ₹6,940 Lowest | 5 ₹6,940 Lowest |
| 2.00 | Demolition of mud phuska in roof any thickness including plastering, leeping (whether full thickness removed or only a part thereof), etc, complete all as specified and directed by Engineer-in-Charge
Note : Mud stacking at site will not be allowed | 278 | Cum | 150 ₹41,700 | 139 ₹38,642 | 150 ₹41,700 | 49 ₹13,622 Lowest |
| 3.00 | Removing of demolished / excavated materials/mud phuska collected after demolition from the roof slabs as mentioned here-in-before, out side of defence land complete all as specified and directed by Engineer-in-Charge | 278 | Cum | 90 ₹25,020 | 111 ₹30,858 | 50 ₹13,900 Lowest | 199 ₹55,322 |
| 4.00 | M&L for preparing surface by brushing with wire brush, sweeping with brooms and cleaning with water and drying with gunny bags to remove all loose dirt etc complete all as specified and directed by Engineer-in-Charge | 1,735 | Sqm | 11 ₹19,085 | 9 ₹15,615 Lowest | 10 ₹17,350 | 10 ₹17,350 |
| 5.00 | Demolition of cement concrete work of any description and in any position not other wise specifically provided for complete all as specified and directed by Engineer-in-Charge | 19 | Cum | 100 ₹1,900 | 190 ₹3,610 | 50 ₹950 Lowest | 99 ₹1,881 |
| 6.00 | M&L for providing cement concrete 1:2:4 type B-1 (20 mm graded stone aggregate) in roof padding with maintaining proper slope in (1:40) finished even and smooth , including in roof kerb, mud slope rounder or chamfered on edges coping kerb water tough and like incl weathering, slightly rounded or chamferred angles and throating directed incl necessary formwork complete all as specified and directed by Engineer-in-Charge | 128 | Cum | 4,000 ₹5,12,000 | 2,930 ₹3,75,040 | 3,500 ₹4,48,000 | 2,800 ₹3,58,400 Lowest |
| 7.00 | M&L for providing and applying Smartcare Damp proof, a fibre reinforced elastomeric liquid water proofing membrane formulated with reimbursement acrylic fibers having Sun Reflecting Index (SRI) of 105 on horizontal/vertical surface of roof/wall/chajjas in three coats @ 1.0 litres per sqm, primary coat self-priming coat (dilution with water in the ration of 3:1) and other two coats to be applied undiluted. The coating needs to be reinforced with 40 GSM Geotextile fabric, to sandwich between 2nd and 3rd coat of coating on new PCC/plastered surfaces. The application shall be carried out after scrapping and properly cleaning the surface to remove loose particles with wire brushes complete in all respect as per the direction of Engineer-in- charge.
Notes :-
(1) The work shall be executed through authorised applicator of manufacturer only.
(2) Authrised Applicator shall be approved by AGE(I) before statring of work.
(3) All materials shall be procured directly form manufacture / distributors.
(4) Guarantee : The contractor shall furnish a written guarantee for the effectiveness of the water proofing treatment for a period of ten years in favour of the AGE(I). A sum equivalent to 2.5% (Two point Five Percent) of the cost of water proofing treatment shall be retained by the Govt from contractor's dues as security deposit, The contractor may, however, furnish a fixed deposite receipt in lieu from a Schedule bank pledged in favour of AGE(I). | 100 | Sqm | 200 ₹20,000 Lowest | 999 ₹99,900 | 500 ₹50,000 | 599 ₹59,900 |
| 8.00 | M&L for providing and applying Smartcare Damp proof, a fibre reinforced elastomeric liquid applied water proofing membrane formulated with select elastomeric and resilient acrylic polymers and reinforcing polyster fibers reinforcing acrylic fibers having Sun Reflectivity Index (SRI) of 105 on horizontal/vertical surface of roof/wall/chajjas in three (including primer) coats @ 2.0 litre / Sqm. Primary coat is self-priming coat of elastomeric waterproofing liquid (dilution with water in the ration of 3:1, damp proof water applied with brushs) and other coats to be applied with brushs/Roller on old PCC/plastered surfaces. The application shall be carried out after scrapping and properly cleaning the surface to remove loose particles with wire brushes complete in all respect as per the direction of Engineer-in- charge.
Notes:- (Important instructions to be followed as mentioned here- in-before in respective item) | 100 | Sqm | 500 ₹50,000 Lowest | 999 ₹99,900 | 500 ₹50,000 Lowest | 599 ₹59,900 |
| 9.00 | M&L for provinding and applying Smartcare crack seal, for interior or exterior surface of walls and ceiling on horizontal / vertical surface upto 5mm depth and 3mm wide, after taking down the cracks with cheisal and cleaning the surface with brushes complete all as specified and directed by Engineer-in-Charge. | 50 | RM | 100 ₹5,000 Lowest | 599 ₹29,950 | 200 ₹10,000 | 250 ₹12,500 |
| 10.00 | M&L for applying evenly a tack coat of industrial bitumen 85/25 at the rate of 1.2 kg per sqm including cleaning base surfaces complete all as specified and directed by Engineer-in-Charge | 1,735 | Sqm | 80 ₹1,38,800 | 30 ₹52,050 Lowest | 50 ₹86,750 | 75 ₹1,30,125 |
Tender Value
₹30 L
EMD Value
₹60,000
Closing Date
18 Oct 2025, 6:00 pmClosed
AGE I U B R
AGE I U B R Delhi Cantt
REPAIR TO ROOF TREATMENT OF WATER SUPPLY INSTALLATIONS AND SUB STN UNDER AGE(I) (U) B/R DELHI CANTT-10
2025_MES_731752_1
AGE(I)(U)B/R/T-44/2025-26
Open Tender
Civil Works
Item Rate
180 days
Delhi Cantt
Please refer Tender documents.
10 documents required · 10 mandatory
₹500
AGE I U B R Delhi Cantt
₹60,000
Yes
17 Dec 2025
19 Sept 2025
21 Oct 2025
19 Sept 2025
18 Oct 2025
6 Oct 2025
Amount
Dismantling of brick tiles or terris tiles single layer on roof of any position and or any height, jointed and grouted/pointed in cement mortar including roof treatment of any description and debris/rubbish off from site upto distance 500 mtr and depositing in low laying are of def land complete all as specified and directed by Engineer-in-Charge
Demolition of mud phuska in roof any thickness including plastering, leeping (whether full thickness removed or only a part thereof), etc, complete all as specified and directed by Engineer-in-Charge Note : Mud stacking at site will not be allowed
Removing of demolished / excavated materials/mud phuska collected after demolition from the roof slabs as mentioned here-in-before, out side of defence land complete all as specified and directed by Engineer-in-Charge
M&L for preparing surface by brushing with wire brush, sweeping with brooms and cleaning with water and drying with gunny bags to remove all loose dirt etc complete all as specified and directed by Engineer-in-Charge
Demolition of cement concrete work of any description and in any position not other wise specifically provided for complete all as specified and directed by Engineer-in-Charge
M&L for providing cement concrete 1:2:4 type B-1 (20 mm graded stone aggregate) in roof padding with maintaining proper slope in (1:40) finished even and smooth , including in roof kerb, mud slope rounder or chamfered on edges coping kerb water tough and like incl weathering, slightly rounded or chamferred angles and throating directed incl necessary formwork complete all as specified and directed by Engineer-in-Charge
M&L for providing and applying Smartcare Damp proof, a fibre reinforced elastomeric liquid water proofing membrane formulated with reimbursement acrylic fibers having Sun Reflecting Index (SRI) of 105 on horizontal/vertical surface of roof/wall/chajjas in three coats @ 1.0 litres per sqm, primary coat self-priming coat (dilution with water in the ration of 3:1) and other two coats to be applied undiluted. The coating needs to be reinforced with 40 GSM Geotextile fabric, to sandwich between 2nd and 3rd coat of coating on new PCC/plastered surfaces. The application shall be carried out after scrapping and properly cleaning the surface to remove loose particles with wire brushes complete in all respect as per the direction of Engineer-in- charge. Notes :- (1) The work shall be executed through authorised applicator of manufacturer only. (2) Authrised Applicator shall be approved by AGE(I) before statring of work. (3) All materials shall be procured directly form manufacture / distributors. (4) Guarantee : The contractor shall furnish a written guarantee for the effectiveness of the water proofing treatment for a period of ten years in favour of the AGE(I). A sum equivalent to 2.5% (Two point Five Percent) of the cost of water proofing treatment shall be retained by the Govt from contractor's dues as security deposit, The contractor may, however, furnish a fixed deposite receipt in lieu from a Schedule bank pledged in favour of AGE(I).
M&L for provinding and applying Smartcare crack seal, for interior or exterior surface of walls and ceiling on horizontal / vertical surface upto 5mm depth and 3mm wide, after taking down the cracks with cheisal and cleaning the surface with brushes complete all as specified and directed by Engineer-in-Charge.
M&L for applying evenly a tack coat of industrial bitumen 85/25 at the rate of 1.2 kg per sqm including cleaning base surfaces complete all as specified and directed by Engineer-in-Charge
M&L for APP based polymeric membrane 3mm thickness and weighing not less than 3.0 Kg/sqm water proofing membrane reinforced with polyster non woven fabric (wt. not less than 150gm/Sqm) land on primered surface by forced application with side overlap of 75mm and 100mm on longitudinally complete all as specified and directed by Engr-in-Charge. Note:- (a) The rate of necessary scaffolding wherever reqd, gas & other arrangements shall be deemed to be included in the quoted rate of item. (b) Each step must be approved by Engr in Charge before proceeding to next step complete all as specified and directed by Engineer-in-Charge.( c) Ponding test shall be carried out by contractor.
M&L for preparation of new or previously untreated surface of any description over 10 cm girth or width, not otherwise described and applying two coats of aluminium paint complete all as specified and directed by Engineer-in-Charge
Taking down Cast Iron/PVC pipe of any size of any description with fittings complete all as specified and directed by Engineer-in-Charge
S&F PVC (SWR)110 mm bore Pipes single socketed ,in any length with rubber ring joints fixed to walls with MS clamps and screw complete all as specified and directed by Engineer-in-Charge
S&F PVC (SWR)110mm bends any radius
Disconnecting existing tanks, setting aside (or lowering if required) for repairs, cleaning, etc. and hoisting if required reconnecting and re-fixing in position and Cleaning and removing all scale and dirt, etc, from tanks and from mouths of circulating pipes,etc.(Exc 250 ltr n exc 500 ltr) and writing date of cleaning with white paint on tank complete all as specified and directed by Engineer-in-Charge.
Disconnecting existing tanks, setting aside (or lowering if required) for repairs, cleaning, etc. and hoisting if required reconnecting and re-fixing in position and Cleaning and removing all scale and dirt, etc, from tanks and from mouths of circulating pipes,etc. (Exc 500 N exc 1000 ltr) and writing date of cleaning with white paint on tank complete all as specified and directed by Engineer-in-Charge.
Demolition of brick masonry work buit in cement mortar or cement lime mortar complete all as specified and directed by Engineer-in-Charge.
M&L for brick work with sub class "B" bricks (old size) straight or curved on plan exc 6 m mean radius, built in cement mortar 1:6 complete all as specified and directed by Engineer-in-Charge
Taking down cement plaster, any description from brick or stone walls etc. including racking out joints, hacking for key, scrubbing down with water, inclu taking down roots of trees complete etc. complete all as specified and directed by Engineer-in-Charge.
M&L for Rendering 10 mm thick on brick or concrete surfaces in cement mortar 1:6, finished even & smooth without using extra cement complete all as specified and directed by Engineer-in-Charge.
M&L for preparation of newly untreated plastered surfaces of wall and applying two coats of oil bound distemper over a coat of primer with alkali resistant priming paint complete all as specified and directed by Engineer-in-Charge.
M&L for rendering 15 mm thick in cement mortar (1:4) on fair faces of brick work on concrete surfaces using water proofing compound @ 3% by weight of cement finished even and smooth without using extra cement complete all as specified and directed by Engineer-in-Charge (Note : Rate to be quoted by bidder inclusive WPC)
M&L for applying two coats of weather proof exterior emulsion paint over priming coat of exterior primer on new or untreated plastered surfaces using brush for priming coat and 1st coat and 2nd coat with airless spray technology with max working pressure of 3300 PSI and capable of operating single spray gun with a max material hose length of 30 mtr the spray machine should be of reputed manufacturer with pro guard technology and capability of tracking pressure complete all as specified and directed by Engineer-in-Charge.
Complete removal of existing treatment by scrapping with mechanical wall sander (having mechanical vacuum mechanism) having RPM not less than 1500, sanding pad of 80 Grit having dia of 7"/9" to make the surface free from dust, loose paint etc by skilled labour complete all as specified and directed by Engineer-in-Charge
M&L for applying two coats of weather proof exterior emulsion paint using brush for first coat and second/final coat with Airless spray technology with max working pressure of 3300 PSI and capable of operating single spray gun with a max materials hose length of 30 mtr the spray machine should be of reputed manufacturer with pro guard technology and capability of tracking pressure complete all as specified and directed by Engineer-in-Charge.
M&L for rendering 5 mm thick in cement mortar 1:3 on ceilling finish even and smooth w / o using extra cement complete all as specified and directed by Engineer-in-Charge
M&L for prepration of newly plastered surfaces on ceiling and applying three coats of white wash complete all as specified and directed by Engineer-in-Charge
P.H. CONSTRUCTION CO. (BID ID -3447982)
RIZCON (BID ID -3454644)
M/S GR construction compony (BID ID -3447014)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
BOQ_819266.xls
BOQ • 0.47 MB
TENDER44.pdf
Tender Documents • 1.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .