| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 LAdmitted-Finance B 204 KAVITA KUNJ CHS MITHBUNDER ROAD KOPRI THANE E 400603 | THANE | THANE | MAHARASHTRA | 400603 | ₹1.2 L | L1 | Admitted-Finance |
| 2 | L2₹1.2 LAdmitted-Finance 1 GANESH DARSHAN ADV SURVE MARG SANDHURST ROAD W MUMBAI 9 | MUMBAI | MAHARASHTRA | ₹1.2 L | L2 | Admitted-Finance |
| 3 | L3₹1.2 LAdmitted-Finance | ₹1.2 L | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Speedfrost Services Pvt. Ltd. L2 | Gil Airconditioning And Refrigeration Services L1 | NEW NATIONAL AIRCONDITIONING CO. L3 |
|---|---|---|---|---|---|---|
| 1.00 | Providing monthly servicing of 11000 cfm Jet Fans installed at basement in Mazgaon court which includes : to check blowers & blades. To check alignment and lubrication, to inspect dampers and air quality. To check foundations, shock absorbers mountings periodically to verify no cracks are developed or suspension is proper.To check the speed of fans with dual speed motor. The scope also includes repairs to blowers, and overhauling of fan motor once a year.
(8 fans x 12 Month = 96 Jobs) | 1 | Job | 600 ₹600 | 589 ₹589 | 615 ₹615 |
| 2.00 | Providing monthly servicing of 6000 cfm Cabinet type Exhaust Fans installed on terrace of STP Building in Mazgaon court which includes : to check pulleys, blades, and clean filters, to check alignment and tension of belts, perform regular lubrication, and inspect dampers and air quality. To check foundations, shock absorbers mountings periodically to verify no cracks are developed or suspension is proper.To maintain low sound level not exceeding more than 60 DBA To check and clean pulleys, blades, and filters. To inspect, checking loose connections if any in wiring, to check and rectify leakages in ducting / insulation once a year or as and when needed. ((1 Job x 12 Month = 12 Jobs) The scope covers free replacement of belts, fan flades, pullye's, canvass and overhauling of motor once a year. | 1 | Job | 2,600 ₹2,600 | 2,568 ₹2,568 | 2,595 ₹2,595 |
| 3.00 | Providing monthly servicing of of Smoke spill Axial Fans installed at basement for smoke extractor at Mazgaon court which includes : to check pulleys, blades, and clean filters. To check alignment and tension of belts, perform regular lubrication, and inspect dampers and air flow. To check foundations, shock absorbers mountings periodically to verify no cracks are developed or suspension is proper. To maintain low sound level The smoke spill axial fans of range: 11000 CFM. The scope also includes repairs to blowers, replacement of belts and overhauling of fan motor once a year. (4 x 12 Month = 48 Jobs) | 1 | Job | 4,575 ₹4,575 | 4,548 ₹4,548 | 4,600 ₹4,600 |
| 4.00 | Providing Monthly Servicing of 16800 cfm Axial Fans installed at Terrace for staircae ventilation at Mazgaon court which includes : to check pulleys, blades, and drive package. To check alignment, lubrication, and inspect dampers and air quality. To check foundations, shock absorbers mountings periodically. To verify and confirm no cracks are developed & suspension is proper.To maintain low sound level. 16800 CFM (2 fans x 12 Month = 24 Jobs) The scope covers repairs to canvass, blowers, overhauling of Fan motor as & when required. | 1 | Job | 6,550 ₹6,550 | 6,527 ₹6,527 | 6,750 ₹6,750 |
| 5.00 | Providing monthly servicing of Axial Fans installed on terrace for Lift pressurisation at Mazgaon court which includes : to check pulleys, blades, and clean filters. To check alignment and tension of belts, perform regular lubrication, and inspect dampers and air flow To check foundations, shock absorbers mountings periodically to verify no cracks are developed or suspension is proper.To maintain low sound level . The Axial fans of range: 70600 CFM. The scope covers repairs to canvass, blowers, overhauling of Fan motor as & when required. (4 fans x 12 Month = 48 Jobs) | 1 | Job | 8,550 ₹8,550 | 8,507 ₹8,507 | 8,600 ₹8,600 |
| 6.00 | Providing monthly servicing of Inline Fans installed at various floors at Mazgaon court for intake of Fresh air to all Indoor units. The scope includes : to check & replace pulleys, blades, Canvass & filters if found necessary. To check alignment and tension of belts, perform regular lubrication, and inspect dampers and air flow. To check sound level which should not exceed more than 60 DBA. The Inline fans of range: 202 CFM to 1275 CFM The scope also includes overhauling/ repairing of Fan motor (89 fans x 12 Month = 1068 Jobs) | 1 | Job | 10,600 ₹10,600 | 10,486 ₹10,486 | 10,575 ₹10,575 |
| 7.00 | Annual Maintenance of CONTROL PANELS FOR FANS consists of the following cubicle type, dead front, sheet steel, wall mounted control panels, including anchoring into the wall, wiring terminating into MCCB and copper earthing, in each panel shall be provided by the electrical contractor. All outgoing shall be provided with Stop /Manual /Auto selector switch to facilitate operation through BAS. All starters shall be provided with potential free Contact for Connections to Building Automation System. All internal wiring and copper earthing of motors from the panel shall be included. MCCB as per the ratings given below, suitable for motor duty and able to withstand fault level of 20 KA. DOL / SD starter as per HP gratings given. Terminal block for power distribution as required. Contactor, over load relay with built in single phasing protection. Phase indicating lights and indicating light for `ON’ status. 96 mm x 96 mm voltmeter and digital ammeter with selector switches. Time delay relay for delayed automatic restart of motor. Wiring for microswitch for stopping the fan when fire damper closes (in case of Fan only). For on/off/remote and local operation, 3 pole single throw switch shall be provided in each panel to facilitate override of the automatic operation. The number of control panels shall be as follows 63 amps MPCB, 11 KW Star-Delta Starter. The scope covers servicing & replacement of minor switch gears. ( 4 Panel x 12 Months = 48 Job) | 1 | Job | 12,500 ₹12,500 | 12,466 ₹12,466 | 12,600 ₹12,600 |
| 8.00 | Annual Comprehenssive Maintenance of CONTROL PANELS FOR FANS consists of the following cubicle type, dead front, sheet steel, wall mounted control panels, including anchoring into the wall, wiring terminating into MCCB and copper earthing, in each panel shall be provided by the electrical contractor. All outgoing shall be provided with Stop /Manual /Auto selector switch to facilitate operation through BAS. All starters shall be provided with potential free Contact for Connections to Building Automation System. All internal wiring and copper earthing of motors from the panel shall be included. MCCB as per the ratings given below, suitable for motor duty and able to withstand fault level of 20 KA. DOL / SD starter as per HP gratings given. Terminal block for power distribution as required. Contactor, over load relay with built in single phasing protection. Phase indicating lights and indicating light for `ON’ status. 96 mm x 96 mm voltmeter and digital ammeter with selector switches. Time delay relay for delayed automatic restart of motor. Wiring for microswitch for stopping the fan when fire damper closes (in case of Fan only). For on/off/remote and local operation, 3 pole single throw switch shall be provided in each panel to facilitate override of the automatic operation. The number of control panels shall be as follows 63 amps MPCB, 3.7 KW Star-Delta Starter. The scope covers servicing & replacement of minor switch gears. ( 4 Panels x 12 Months = 48 Job) | 1 | Job | 14,800 ₹14,800 | 14,445 ₹14,445 | 14,700 ₹14,700 |
| 9.00 | Providing monthly maiintennce of MOTOR CONTROL CENTRES FOR OUTDOOR UNIT consits of the following cubicle type 2 mm thick sheet steel enclosed separate compartment for each feeder, front operated, rear connections indoor type LT motor control panel, dust and vermin proof, drawout/hinged and lockable doors, complete with internal wiring, colour coding with ferrules, cable glands, bonding to earth and painting. Quoted price for each panel & motor control centre shall include all cabling & earthing over cable trays into various equipment, all associated control wiring and interlocking circuitary. Each MCC shall include cost of wiring, control wiring & inter locking between chillers, primary CHW pumps, condenser water pumps, motorized valves at chillers and condensers, flow meter & flow switch installed in de-coupler by-
pass line, in order to execute the required sequence of operation. All outgoing shall be provided with Stop/Manual/ Auto/selector switch to facilitate operation through BAS. All starters shall be provided with potential free Contact for Connections to Building Automation System. A separate set of CTs to be provided for BAS and wiring from CT’s and voltage transducers to be brought on to separate set of terminals. Motor Control Centre 415V Bus Section-1 consisting of Incoming One No.800 amps TPN manual drawout type incoming microprocessor based ACB complete with the following : 0 - 500 volts 96 x 96 sq mm digital voltmeter with selector switch. 0 -1000 amps 96 x 96 sq mm digital ammeter with 1000./5 amps CT’s and selector switch Over voltage tripping mechanism for persistent voltage exceeding 110% of the rated voltage for more than 5 minutes Phase indicating lamps, with toggle switches. TPN bus bars shall be of aluminium and shall be sleeved. Phase bus bars shall be rated at …… amps and neutral bus bar shall be of 50% capacity. Maximum density of aluminium bus bars for current carrying capacity shall be one amp per square mm. Outgoing 02 Nos. 25 amps ELMCB, for 24 HP ODU 02 Nos. 16 amps ELMCB, for 26 HP ODU 02 Nos. 32 amps ELMCB, for 26 HP ODU 02 Nos. 25 amps ELMCB, for 42 HP ODU 01 Nos. 32 amps ELMCB, for 42 HP ODU 10 Nos. 25 amps ELMCB, for 44 HP ODU 05 Nos. 32 amps ELMCB, for 44 HP ODU Necessary cable alleys, space for spare switches, internal wiring, control wiring/cabling and copper earthing of all equipment shall also be included. All switches and other components shall be motor duty rating. Motor Control Centre No. 1 as described above. The scope covers servicing & replacement of minor switch gears. (2 Panel x 12 months= 24 Job) | 1 | Job | 16,500 ₹16,500 | 16,425 ₹16,425 | 16,550 ₹16,550 |
| 10.00 | Annual Maintenance of CONTROL PANELS FOR FANS consists of the following cubicle type, dead front, sheet steel, wallmounted control panels, including anchoring into the wall, wiring terminating into MCCB and copper earthing, in each panel shall be provided by the electrical contractor. All outgoing shall be provided with Stop /Manual /Auto selector switch to facilitate operation through BAS. All starters shall be provided with potential free Contact for Connections to Building Automation System. All internal wiring and copper earthing of motors from the panel shall be included. MCCB as per the ratings given below, suitable for motor duty and able to withstand fault level of 20 KA. DOL / SD starter as per HP gratings given. Terminal block for power distribution as required.Contactor, over load relay with built in single phasing protection. Phase indicating lights and indicating light for `ON’ status. 96 mm x 96 mm voltmeter and digital ammeter with selector switches. Time delay relay for delayed automatic restart of motor. Wiring for microswitch for stopping the fan when fire damper closes (in case of Fan only). For on/off/remote and local operation, 3 pole single throw switch shall be provided in each panel to facilitate override of the automatic operation. The number of control panels shall be as follows 63 amps MPCB, 7.5 KW Star-Delta Starter. The scope covers servicing & replacement of minor switch gears. ( 1 Panel x 12 Months = 12 Job) | 1 | Job | 18,450 ₹18,450 | 18,404 ₹18,404 | 18,500 ₹18,500 |
Tender Value
Refer Docs
Closing Date
6 Feb 2026, 5:30 pmClosed
Executive Engineer Central Mumbai Electrical Divis
Executive Engineer Central Mumbai Electrical Division Sadhana House 2nd floor, Pandurang Budhkar marg, Behind Mahindra Tower, Worli, Mumbai -18
Providing fully comprehensive annual maintenance for ventilation system and allied electrical panels installed at Mazgaon Court Building, Mazgaon, Mumbai.
2026_PWDM_1273041_1
Quatation/21/25-26/Maz court/1st
Open Tender
Electrical Works
90 days
JJ Hospital subdivision
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
9 Feb 2026
30 Jan 2026
9 Feb 2026
30 Jan 2026
6 Feb 2026
30 Jan 2026
Providing monthly servicing of 11000 cfm Jet Fans installed at basement in Mazgaon court which includes : to check blowers & blades. To check alignment and lubrication, to inspect dampers and air quality. To check foundations, shock absorbers mountings periodically to verify no cracks are developed or suspension is proper.To check the speed of fans with dual speed motor. The scope also includes repairs to blowers, and overhauling of fan motor once a year. (8 fans x 12 Month = 96 Jobs)
Providing monthly servicing of 6000 cfm Cabinet type Exhaust Fans installed on terrace of STP Building in Mazgaon court which includes : to check pulleys, blades, and clean filters, to check alignment and tension of belts, perform regular lubrication, and inspect dampers and air quality. To check foundations, shock absorbers mountings periodically to verify no cracks are developed or suspension is proper.To maintain low sound level not exceeding more than 60 DBA To check and clean pulleys, blades, and filters. To inspect, checking loose connections if any in wiring, to check and rectify leakages in ducting / insulation once a year or as and when needed. ((1 Job x 12 Month = 12 Jobs) The scope covers free replacement of belts, fan flades, pullye's, canvass and overhauling of motor once a year.
Providing monthly servicing of of Smoke spill Axial Fans installed at basement for smoke extractor at Mazgaon court which includes : to check pulleys, blades, and clean filters. To check alignment and tension of belts, perform regular lubrication, and inspect dampers and air flow. To check foundations, shock absorbers mountings periodically to verify no cracks are developed or suspension is proper. To maintain low sound level The smoke spill axial fans of range: 11000 CFM. The scope also includes repairs to blowers, replacement of belts and overhauling of fan motor once a year. (4 x 12 Month = 48 Jobs)
Providing Monthly Servicing of 16800 cfm Axial Fans installed at Terrace for staircae ventilation at Mazgaon court which includes : to check pulleys, blades, and drive package. To check alignment, lubrication, and inspect dampers and air quality. To check foundations, shock absorbers mountings periodically. To verify and confirm no cracks are developed & suspension is proper.To maintain low sound level. 16800 CFM (2 fans x 12 Month = 24 Jobs) The scope covers repairs to canvass, blowers, overhauling of Fan motor as & when required.
Providing monthly servicing of Axial Fans installed on terrace for Lift pressurisation at Mazgaon court which includes : to check pulleys, blades, and clean filters. To check alignment and tension of belts, perform regular lubrication, and inspect dampers and air flow To check foundations, shock absorbers mountings periodically to verify no cracks are developed or suspension is proper.To maintain low sound level . The Axial fans of range: 70600 CFM. The scope covers repairs to canvass, blowers, overhauling of Fan motor as & when required. (4 fans x 12 Month = 48 Jobs)
Providing monthly servicing of Inline Fans installed at various floors at Mazgaon court for intake of Fresh air to all Indoor units. The scope includes : to check & replace pulleys, blades, Canvass & filters if found necessary. To check alignment and tension of belts, perform regular lubrication, and inspect dampers and air flow. To check sound level which should not exceed more than 60 DBA. The Inline fans of range: 202 CFM to 1275 CFM The scope also includes overhauling/ repairing of Fan motor (89 fans x 12 Month = 1068 Jobs)
Annual Comprehenssive Maintenance of Programmable Logic controller with main components like power, processor, input & output cards, an open protocol for interface with the BMS systems. PLC to be complete as per specs installed inside the Main Switchgear MCC panel. The PLC shall have a FULL MODBus / BACnet / Eithernet interface facility with the Central BMS system. Scope to include the Gateway or converter, Communication module, HVAC software in addition to the standard features.Minimum Specifications of a Controller are as follows : a) 10 x analogue inputs for CO or other pollutant sensors. (0-20mA, 0-5V and 0-10V input available). b) 16 x digital inputs for fan run/fault status.c) 1 x emergency alarm (i.e. fire) digital signal inputs. d) MODBUS, BACnet and other protocols for supervisory connection with BMS system. Built-in communication - Modbus slave serial link by means of connection on integrated RJ45 port (Modbus master/slave serial link on integrated RJ45 port). e) 3 x analogue outputs available to speed control groups of JetVent Fans, central car park exhaust fan or supply fan. f) 3 x digital outputs to drive speed control relays (for 2 speed fans) or other systems according to pollutant concentration.Other Standard Details which the Basic Controller shall have are as follows:a) Programmable Logic Controller with HVAC softwareb) Dedicated PWM programmable output.c) Programmable Anagol Outputs/Inputs 0 - 10 V, 0 - 20 mA, 4 - 20 Ma d) Display block for displaying the controller status: 4 LEDs (PWR, RUN, ERR and EXP) and 1 LED that can be used in the application.e) Connector for a removable terminal block (1) (2 terminals) for connecting the 24 V c/a supply.f) RJ11 connector marked Prg. Port for connecting a programming port g)Connector for a removable terminal block , for connecting analog inputs. h) Connector for a removable terminal block for connecting discrete inputs. i) Connector for a removable terminal block, for connecting analog outputs. j) RJ45 connector, for connection to the odbus™ bus.k) RJ45 connector, for connection to the Modbus bus. l) Five Modbus bus and expansion bus polarization and line terminator adjustment switches. m) Connector for a removable terminal block, for connecting the expansion bus. n) Connector for a removable terminal block to connect the power supply for a remote display unit. o) Connector for a removable terminal block, for connecting 4 discrete relay N/C outputs. p) Connector for a removable terminal block for connecting the discrete relay C/O output. q) Display with 6 command buttons for setting the controller parameters r) logic controllers are mounted as standard on a 35 mm DIN rail. Supply, laying, testing and commissioning of 600/1000V Copper Conductor FRLS insulated PVC Sheathed Armoured - IEC 60502, with max short circuit temperature 300⁰C. The scope covers servicing & replacement of minor switch gears ( 2 Panels x 12 Months = 24 Job)
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.50 MB
BOQ_2191564.xls
BOQ • 1.62 MB
Download all tender documents and submit your bid