Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.7 LAccepted-AOC | ₹25.7 L Quoted ₹26.3 L | L1 | Accepted-AOC L1 |
| 2 | L2₹30.0 L+₹3.8 L (14.4%)Rejected-AOC | ₹30.0 L+₹3.8 L (14.4%) | L2 | Rejected-AOC L2 |
| 3 | L3₹30.6 L+₹4.3 L (16.4%)Rejected-AOC | ₹30.6 L+₹4.3 L (16.4%) | L3 | Rejected-AOC L3 |
| 4 | L4₹31.0 L+₹4.7 L (18.0%)Rejected-AOC | ₹31.0 L+₹4.7 L (18.0%) | L4 | Rejected-AOC L4 |
| 5 | L5₹32.1 L+₹5.9 L (22.3%)Rejected-AOC NO 6 NJ BUILDING GANGAMMA TEMPLE ROAD JALAHALLI POST BANGALORE 560 013 | BANGALORE | BANGALORE | KARNATAKA | 560013 | ₹32.1 L+₹5.9 L (22.3%) | L5 | Rejected-AOC L5 |
| Sl No | Description | Qty | Unit | chowdeshwariconstructionco L2 | JITHU CONSTRUCTION COMPANY L1 | Lakkaiah Rangaswamy L6 | ANAND REFRIGERATION L5 | SRI AYYAPPA ENTERPRISES L4 | SRUSHTI CONSTRUCTIONS L7 | D K Engineers and contractors L3 | SHIRDE ENTERPRISES L8 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | M&L for Easing of steel window shutter for properly closing/opening tightening of hinges by oiling, greasing or by replacing of new box type hinges including necessary cutting & welding and painting touch up complete all as specified and directed. | 80 | Per leaf | 150 ₹12,000 | 120 ₹9,600 | 400 ₹32,000 | 60 ₹4,800 Lowest | 75 ₹6,000 | 100 ₹8,000 | 70 ₹5,600 | 100 ₹8,000 |
| 2.00 | M&L for Rescuring or easing and adjusting without taking down wooden window shutters / cup-board shutters n exc 1.0 Sqm for properly closing / opening, tightening of hinges or changing the position of hinges, adjustment of tower bolts & sliding bolt etc complete all as specified & directed. | 40 | Per leaf | 180 ₹7,200 | 120 ₹4,800 | 500 ₹20,000 | 65 ₹2,600 | 75 ₹3,000 | 100 ₹4,000 | 50 ₹2,000 Lowest | 100 ₹4,000 |
| 3.00 | All as per Item No.02 above but for shutters exc 1.0 Sqm but n.exc 2.00 Sqm complete all as specified and directed. | 50 | Per leaf | 200 ₹10,000 | 220 ₹11,000 | 600 ₹30,000 | 90 ₹4,500 | 80 ₹4,000 | 200 ₹10,000 | 65 ₹3,250 Lowest | 200 ₹10,000 |
| 4.00 | M&L for Easing of aluminium doors including taking out door shutters and changing of certain parts if required like pivots, hinges, Handles, Tower bolts, EPDM / rubber beadings etc as required and re-fixing in the same position and size of doors n.exc 4 sqm each etc complete all as specified and directed. | 50 | Per leaf | 300 ₹15,000 | 200 ₹10,000 | 550 ₹27,500 | 1,200 ₹60,000 | 1,000 ₹50,000 | 300 ₹15,000 | 50 ₹2,500 Lowest | 300 ₹15,000 |
| 5.00 | All as per Item No.04 above but for windows shutter complete all as specified and directed. | 75 | Per leaf | 350 ₹26,250 | 250 ₹18,750 | 650 ₹48,750 | 380 ₹28,500 | 400 ₹30,000 | 150 ₹11,250 | 50 ₹3,750 Lowest | 150 ₹11,250 |
| 6.00 | M&L for Taking down door chowkats or frames n.exc 1.5 sqm with shutters (without taking off shutters from the frame) of any description etc complete all as specified and directed. | 4 | Each | 180 ₹720 | 390 ₹1,560 | 500 ₹2,000 | 210 ₹840 | 200 ₹800 | 300 ₹1,200 | 150 ₹600 Lowest | 300 ₹1,200 |
| 7.00 | M&L for Taking down door chowkats or frames exc 1.5 sqm but n.exc 4 sqm with shutters (without taking off shutters from the frame) of any description etc complete all as specified and directed. | 8 | Each | 150 ₹1,200 Lowest | 440 ₹3,520 | 600 ₹4,800 | 240 ₹1,920 | 250 ₹2,000 | 400 ₹3,200 | 250 ₹2,000 | 400 ₹3,200 |
| 8.00 | M&L for Taking down shutters of any description n.exc 1sqm each complete all as specified and directed. | 10 | Per leaf | 140 ₹1,400 | 390 ₹3,900 | 250 ₹2,500 | 75 ₹750 Lowest | 75 ₹750 Lowest | 200 ₹2,000 | 200 ₹2,000 | 200 ₹2,000 |
| 9.00 | M&L for Taking down shutters of any description exc 1sqm and n.exc 2sqm each complete all as specified and directed. | 4 | Per leaf | 180 ₹720 | 440 ₹1,760 | 300 ₹1,200 | 90 ₹360 Lowest | 100 ₹400 | 300 ₹1,200 | 450 ₹1,800 | 300 ₹1,200 |
| 10.00 | S&F 2nd class hard wood plain, solid, straight chowkats and frames, wrought, framed rebated on the solid, rounded or chamfered put together with glue, pinned at joints complete all as specified and directed. | 0.1 | Cum | 85,000 ₹8,500 | 1,20,000 ₹12,000 | 1,000 ₹100 Lowest | 70,000 ₹7,000 | 80,000 ₹8,000 | 80,000 ₹8,000 | 65,000 ₹6,500 | 80,000 ₹8,000 |
Tender Value
₹25 L
EMD Value
₹50,000
Closing Date
29 Apr 2026, 6:00 pmClosed
GE (AF) Yelahanka
GE (AF) Yelahanka Bangalore - 63
PETTY REPAIRS AND CERTAIN MISC B/R WORKS AT VARIOUS OTM ACCN IN TECHNICAL AREA AT AF STN YELAHANKA
2026_MES_759502_1
8482/E8
Open Tender
Civil Works
Item Rate
330 days
GE (AF)Yelahanka
As per NIT
9 documents required · 9 mandatory
₹500
GE (AF) Yelahanka
₹50,000
Yes
11 Sept 2026
8 Apr 2026
6 May 2026
8 Apr 2026
29 Apr 2026
22 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | M&L for Easing of steel window shutter for properly closing/opening tightening of hinges by oiling, greasing or by replacing of new box type hinges including necessary cutting & welding and painting touch up complete all as specified and directed. | - | Per leaf | - | - |
| 2 | M&L for Rescuring or easing and adjusting without taking down wooden window shutters / cup-board shutters n exc 1.0 Sqm for properly closing / opening, tightening of hinges or changing the position of hinges, adjustment of tower bolts & sliding bolt etc complete all as specified & directed. | - | Per leaf | - | - |
| 3 | All as per Item No.02 above but for shutters exc 1.0 Sqm but n.exc 2.00 Sqm complete all as specified and directed. | - | Per leaf | - | - |
| 4 | M&L for Easing of aluminium doors including taking out door shutters and changing of certain parts if required like pivots, hinges, Handles, Tower bolts, EPDM / rubber beadings etc as required and re-fixing in the same position and size of doors n.exc 4 sqm each etc complete all as specified and directed. | - | Per leaf | - | - |
| 5 | All as per Item No.04 above but for windows shutter complete all as specified and directed. | - | Per leaf | - | - |
| 6 | M&L for Taking down door chowkats or frames n.exc 1.5 sqm with shutters (without taking off shutters from the frame) of any description etc complete all as specified and directed. | - | Each | - | - |
| 7 | M&L for Taking down door chowkats or frames exc 1.5 sqm but n.exc 4 sqm with shutters (without taking off shutters from the frame) of any description etc complete all as specified and directed. | - | Each | - | - |
| 8 | M&L for Taking down shutters of any description n.exc 1sqm each complete all as specified and directed. | - | Per leaf | - | - |
| 9 | M&L for Taking down shutters of any description exc 1sqm and n.exc 2sqm each complete all as specified and directed. | - | Per leaf | - | - |
| 10 | S&F 2nd class hard wood plain, solid, straight chowkats and frames, wrought, framed rebated on the solid, rounded or chamfered put together with glue, pinned at joints complete all as specified and directed. | 1 | Cum | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.13 MB
Binder1.pdf
Tender Documents • 0.86 MB
BOQ_850706.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .