| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.1 LAccepted-AOC | L1 | Accepted-AOC L1 Bidder Accepted | |
| 2 | L2₹13.3 L+₹23,228 (1.77%)Rejected-AOC | L2 | Rejected-AOC L2 Bidder Rejected |
| Sl No | Description | Qty | Unit | M/S Thalapathy Siva Construction L1 | STEPHEN LOURDURAJ P L2 |
|---|---|---|---|---|---|
| 1.00 | Picking 5 cm to 10 cm old metalled surface and sectioning | 452.5 | Cum | 23 ₹10,407.5 Lowest | 25 ₹11,312.5 |
| 2.00 | Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A | 260.64 | Sqm | 140.3 ₹36,567.79 Lowest | 145 ₹37,792.8 |
| 3.00 | Spreaded the collected US gravel 100mm thick watering and hand rolling including cost and supply of US gravel from approved quarry and stacking to departmental gauge for pre measurements etc., complete as per standard specification and as direct | 43.44 | Cum | 683.4 ₹29,686.9 Lowest | 690 ₹29,973.6 |
| 4.00 | Providing and laying spreading and compacting grade stone agreegate to wmm specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in subabse / base course on well prepared surface and compacting with vibaratory roller to achieve the desired density including cost of materials labour charges rentals for machinery fuel and other incidental charges etc., complete | 135.75 | Cum | 3,418.6 ₹4,64,074.95 Lowest | 3,450 ₹4,68,337.5 |
| 5.00 | Providing and laying of prime coat using emulsion at the rate of 7 kg per ten square metre over the WMM surface preparatory to another bituminous construction over it | 1,357.5 | Cum | 85 ₹1,15,387.5 Lowest | 90 ₹1,22,175 |
| 6.00 | Providing and laying Tack Coat over WMM surface at 2.50 Kg of RS-1 Bitumen Emulsion /10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Complete. | 1,357.5 | Sqm | 33.8 ₹45,883.5 Lowest | 35 ₹47,512.5 |
| 7.00 | Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 14.60Kg of Bitumen for pre-mixing 10 sqm of pre-mix carpet and laying separately Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete | 1,357.5 | Sqm | 296.62 ₹4,02,661.65 Lowest | 300 ₹4,07,250 |
| 8.00 | Provision for Name board | 1 | Nos | 4,500 ₹4,500 Lowest | 4,500 ₹4,500 Lowest |
| 9.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 1,99,650.56 ₹1,99,650.56 Lowest | 2,03,193.7 ₹2,03,193.7 |
Tender Value
₹13.2 L
EMD Value
₹13,230
Closing Date
17 Sept 2025, 3:00 pmClosed
The Block Development Officer(BP)
Panchayat Union, Andimadam
Strenhthening the road from Nagampandal PUE School to Srimushanam link road in Nagampandal panchayat in Andimadam block of Ariyalur District under MLACDS 2025-26
2025_RDTN_601573_1
R.C.No.A3/1352/2025, Date.25.08.2025
Open Tender
Civil Works - Roads
Item Rate
90 days
Andimadam
As per tender document
5 documents required · 5 mandatory
₹0
₹13,230
9 Oct 2025
8 Sept 2025
17 Sept 2025
8 Sept 2025
17 Sept 2025
8 Sept 2025
Amount
Picking 5 cm to 10 cm old metalled surface and sectioning
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
Spreaded the collected US gravel 100mm thick watering and hand rolling including cost and supply of US gravel from approved quarry and stacking to departmental gauge for pre measurements etc., complete as per standard specification and as direct
Providing and laying spreading and compacting grade stone agreegate to wmm specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in subabse / base course on well prepared surface and compacting with vibaratory roller to achieve the desired density including cost of materials labour charges rentals for machinery fuel and other incidental charges etc., complete
Providing and laying of prime coat using emulsion at the rate of 7 kg per ten square metre over the WMM surface preparatory to another bituminous construction over it
Providing and laying Tack Coat over WMM surface at 2.50 Kg of RS-1 Bitumen Emulsion /10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Complete.
Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 14.60Kg of Bitumen for pre-mixing 10 sqm of pre-mix carpet and laying separately Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete
Provision for Name board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
STEPHEN LOURDURAJ P (BID ID -1454219)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .