Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.1 LAccepted-AOC DIVISION 180 UNIT 38 ZONE 13 TAMIL NADU TN | ₹3.1 L | L1 | Accepted-AOC Accept |
| 2 | L2₹3.2 L+₹4,837.13 (1.55%)Rejected-AOC | ₹3.2 L+₹4,837.13 (1.55%) | L2 | Rejected-AOC Reject |
| 3 | L3₹3.2 L+₹5,669.75 (1.82%)Rejected-AOC | ₹3.2 L+₹5,669.75 (1.82%) | L3 | Rejected-AOC Reject |
| 4 | L4₹3.4 L+₹25,375.10 (8.15%)Rejected-AOC | ₹3.4 L+₹25,375.10 (8.15%) | L4 | Rejected-AOC Reject |
Tender Value
Refer Docs
EMD Value
₹4,000
Closing Date
12 Mar 2026, 3:00 pmClosed
Zonal Officer II
New Zonal office building, Kamarajar Salai, Chennai - 600068
DISMANTLING AND SHIFTING OF STEEL BUS SHELTER AT NEDUNCHEZHIAN STREET IN DN-21, UNIT-5, ZONE-2
2026_CoC_671439_1
Z.O.II.C.No.E1/705204/2025
Open Tender
Civil Works
Works
90 days
Manali
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹4,000
6 Jul 2026
6 Mar 2026
13 Mar 2026
6 Mar 2026
12 Mar 2026
6 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling RCC by manual / by using deploying machineries | 3 | CUM | 4,610.31 | ₹13,830.93 |
| 2 | Earth work excavation for foundation by Mechanical means for Isolated &
Combined Footing etc in all soils and sub-soils and to full depth as may be
directed except in rock requiring blasting inclusive of shoring shuttering,
bailing out water wherever necessary and depositing the surplus earth within
the compound in places shown by the departmental officers with an initial
lead of 100 mts and clearing and levelling including dressing of sides and
raming of bottoms etc., complete complying with standard specification and
as directed by the departmental officers.- Upto 2.40m Footing Depth.
(including Refilling charges) | 7 | CUM | 368.55 | ₹2,579.85 |
| 3 | Supplying clean Crushed Stone Sand
(Commercially called M-Sand) | 2 | CUM | 1,982.86 | ₹3,965.72 |
| 4 | Plain Cement Concrete 1:2:4 (one cement, two crushed stone sand and
four hard broken stone jelly) using 20mm jelly for wearing coat including
laying, compacting, finishing and curing, etc., complete as per standard
specificatins and as directed by the departmental officers.-Mixing by
mechanical means | 9 | CUM | 7,255.21 | ₹65,296.89 |
| 5 | Providing and laying in position
,Standardised Concrete Mix M-20 Grade in accordance with | 3 | CUM | 8,015.86 | ₹24,047.58 |
| 6 | Brick work in following Cement Mortar using best quality Burnt Clay Brick of
size 9” x 4 3/8” x 2 3/4” with class designation of 10 conforming to
IS 1077-1992 for foundation and basement including Cost of Mortar
Plasticizer curing, etc.,complete complying with standard specification and as
directed by the departmental officers. Brickwork shall be done as per IS 2212
1991 adopting English Bond generally.other type of bond shall be done as
directed by the Executive Engineer in charge. | 3 | CUM | 7,935.89 | ₹23,807.67 |
| 7 | Paving the flooring with CEMENT
CONCRETE TILES hydraulic pressed
Antiskid tiles | 40 | SQM | 1,578.33 | ₹63,133.2 |
| 8 | Dismantling and shifting ss bus stand (Including Crane,Labour other charges) | 1 | LS | 85,000 | ₹85,000 |
| 9 | Bus stand ss polish | 1 | Nos | 15,000 | ₹15,000 |
| 10 | Minor Repair works | 1 | LS | 20,000 | ₹20,000 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.14 MB
705204.pdf
Tender Documents • 1.56 MB
BOQ_806915.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .