Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.3 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹3.3 LSame as L1Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L2₹3.3 LSame as L1Rejected-Finance | L2 | Rejected-Finance L2 | |
| 4 | L2₹3.3 LSame as L1Rejected-Finance | L2 | Rejected-Finance L2 | |
| 5 | L2₹3.3 LSame as L1Rejected-Finance | L2 | Rejected-Finance L2 |
Tender Value
₹3.9 L
EMD Value
₹11,607
Closing Date
12 May 2026, 3:00 pmClosed
Udhyaan Prabhari
IV floor Udhaayn Vibhaag Ghaziabad Nagar Nigam
Work-20 Work involving marble-chip finishing on the wall and repair of the footpath in the park situated in front of D-437 D-Block Lajpat Nagar Mohan Nagar Zone Ward-75
2026_DOLBU_1143263_20
5042/UDHYAAN/2026-27 GNN DT 20-04-2026
Open Tender
Miscellaneous Works
Percentage
Ghaziabad Nagar Nigam
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,416
₹11,607
17 Jul 2026
28 Apr 2026
12 May 2026
28 Apr 2026
12 May 2026
28 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Diss. Of existing plaster including disposal of refuse SI.NO.709 | 69.98 | m2 | 45 | ₹3,149.1 |
| 2 | Washed stone grit plaster on existing wall hights up to 10mtr above ground lavel under 12mm cement plaster 1:4. 15mm cement plaster 1:1/2:2 in cement coarse sand & stone chipping 10mm nominal size. DSR 2021 13.72 PAGE NO.285. | 142.4 | m2 | 886.18 | ₹1,26,192.03 |
| 3 | First class Brick Work in (1:4) cement & four coarse sand 2.20 F.M, morter in foundation and plinth and T&P etc all completed as per the direction of engineer-in-charge. (AS PER PWD SOR 2022 PAGE NO 20 SI NO 6.05 ITEM NO 305 (a) | 6.26 | m3 | 5,170 | ₹32,364.2 |
| 4 | Cement Concrete with 4cm gauge approved stone ballast coarse send & cement in the proportion og 8:4:1 including supply of all material labour tools plant PWD/SOR 2022 281 | 0.49 | m3 | 6,100 | ₹2,989 |
| 5 | Steel reinforcement for RCC work.DSR 2023.5.22.1 | 2.5 | qtl | 8,166 | ₹20,415 |
| 6 | RCC work with cement approved coarse send & 2cm gauge. approved stone grit in proportion of 1:1.5:3 in lintal of doors and window excluding supply of reinforcement and its bending but including its fixing and binding wire including nesesory centering and shutring PWD/SOR 2022 283a | 3.1 | m3 | 8,640 | ₹26,784 |
| 7 | Supply and fixing 6mm (1/4") china white glazed tiles in flooring or in skirting or dado laid with 1:3 cement & approved 7 coarse send mortar finished with white cement slurry jointing and polishing complete including supply of all material labour & tools and plants SOR 2022-14.15 | 26.8 | m2 | 900 | ₹24,120 |
| 8 | Removing of old laid tiles | 76.96 | m2 | 100.45 | ₹7,730.63 |
| 9 | S/L of stone ballast 22.4 to 53mm size with stacking for measurement etc all complete as per tha direction of engineer in-charge AS PER PWD SOR 2020 RMR | 6.16 | m3 | 2,151.2 | ₹13,251.39 |
| 10 | Supplying & laying of 80mm thick rubber moulded tiles at all comp.M-30 | 76.96 | m2 | 930 | ₹71,572.8 |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.48 MB
BOQ_2135625.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .