| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.9 LAccepted-AOC | 1 | Accepted-AOC L1 | |
| 2 | 2₹2.9 L+₹1,959.84 (0.68%)Rejected-Finance MUGALGARHI MAJRA FULRAI TEHSEEL SIKANDRARAO HATHRAS | 2 | Rejected-Finance L2 | |
| 3 | 3₹3.2 L+₹30,750.24 (10.6%)Rejected-Finance 102 SAI APPARTMENT SIMROL ROAD DREAMLAND MHOW INDORE MADHYA PRADESH 453441 INDIA | INDORE | MADHYA PRADESH | 453441 | 3 | Rejected-Finance L3 | |
| 4 | 4₹3.2 L+₹30,838.34 (10.7%)Rejected-Finance | 4 | Rejected-Finance L4 | |
| 5 | 5₹3.3 L+₹41,146.22 (14.2%)Rejected-Finance | 5 | Rejected-Finance L5 |
Tender Value
₹3.6 L
EMD Value
₹36,000
Closing Date
10 May 2022, 5:00 pmClosed
Executive Engineer
Irrigation Division, Firozabad
Reconstruion of VRB at km. 2.200 of Paindapur miner.
2022_UPIDC_695458_5
01/EE/2022-23
Open Tender
Civil Works
Item Wise
30 days
Reconstruion of VRB at km. 2.200 of Paindapur min
Please refer Tender documents.
2 documents required · 2 mandatory
₹856
Executive Engineer
₹36,000
6 Sept 2022
2 May 2022
11 May 2022
2 May 2022
10 May 2022
2 May 2022
Amount
Eartwork in filling for making or removing bundha in all types of soil ,proper dressing & compaction including initial lift and lead i/c all cost of labour,T&P etc.
Dismentelling work of old structure including cost of all labour, T&P etc. and proper disposal of material with distance of 60m or as directed by Engineer-in-charge for proper completion of work.
Earth work in excavation of foundation in all types of soil with initial lead & lift i/c all cost of labour,T&P etc.
C.C. 1:3:6 in cement ,Coarse sand and stone grit for foundation footing including all cost of labour ,materials ,T&P etc.for proper completion of work.
C.C. 1:6:12 in cement ,Coarse sand and stone grit for foundation footing including all cost of labour ,materials ,T&P etc.for proper completion of work.
Ist class brick work in 1:4 in cement mortar including all cost of labour ,materials ,T&P etc.for proper completion of work.
CC.1:1½:3 with stone ballast in R.C.C. work including all costof labour ,materials ,T&P etc.for proper completion of work.
C.C. 1:2:4 in ordinary work including all costof labour ,materials ,T&P etc.for proper completion of work.
Centering & shuttering for R.C.C including all cost of labour ,T&P etc.for proper completion of work.
Reinforcement of R.C.C. work including all cost of labour ,materials & T&P etc.for proper completion of work.
stuck deep cement pointing with 1:2 cement mortar including all cost of labour ,materials & T&P etc.for proper completion of work.
Earth work in strengthning of damage bank including proper ramming and dressing with lead up to 1km & lift upto 1.5m including all cost of labour ,T&P etc.
supplying & fixing Thermocoal in joints i/c all cost of labour ,materials and T&P etc.
Making & fixing M.S. sign board size (1250mm x 900mm) 2400 mm height with painting and writing letters i/c all cost of labour ,materials and T&P etc.
P/F of R.C.C. Wheel Guard(size of 150mmx200mmx750mm)
Anil Kumar
M/S ROHIT ENTERPRISES
M/s HARENDRA CONTRACTOR
M/S SATAYA BHAN CONTRACTOR
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .