Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.3 LAccepted-AOC 04 L BLOCK MARKET SECTOR 11 NOIDA 201301 UP GAUTAM BUDHA NAGAR | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201301 | L1 | Accepted-AOC Being L1 bidder | |
| 2 | L2₹16.9 L+₹60,894 (3.74%)Rejected-Finance | L2 | Rejected-Finance Other than L1 | |
| 3 | L3₹17.0 L+₹69,470 (4.27%)Rejected-Finance E 140 2010 BKP VILL AMTALLA PO DUMARCHIR DIST PAKUR PIN 814111 JHARKHAND | PAKUR | PAKUR | JHARKHAND | 814111 | L3 | Rejected-Finance Other than L1 | |
| 4 | L4₹17.0 L+₹72,469 (4.45%)Rejected-Finance | L4 | Rejected-Finance Other than L1 | |
| 5 | L5₹18.2 L+₹1.9 L (11.8%)Rejected-Finance | L5 | Rejected-Finance Other than L1 |
Tender Value
₹17.5 L
EMD Value
₹35,000
Closing Date
22 Jun 2024, 6:00 pmClosed
GE AF Panagarh
GE AF PANAGARH MES AF STATION PANAGARH PO BIRUDIAH WEST BENGAL 713148
PROVISION OF RETROFITTING OF EMISSION CONTROL DEVICE (RECD) FOR 250 KVA AND 62.5 DG SETS OF POWER HOUSE AND PUMP HOUSE AT AIR FORCE STATION PANAGARH UNDER GE (AF) PANAGARH
2024_MES_655769_1
C/8769/E8
Open Tender
Miscellaneous Works
Item Rate
90 days
AF STATION PANAGARH
Refer tender document
7 documents required · 7 mandatory
₹500
GE AF PANAGARH
₹35,000
31 Aug 2024
24 May 2024
24 Jun 2024
24 May 2024
22 Jun 2024
10 Jun 2024
Amount
Supplying, installation, testing & commissioning of retrofitting emission control device on existing 250 KVA DG set to reduce particulate matter, hydrocarbon and carbon monoxide emission by at least 70% to 90% and other harmful pollutants in 5 mode D2 cycle. The emission control device / equipment must be tested over an ISO-8178 5 mode D2 cycle for equivalent KVA rating and consisting of pressure safety valve if SS304, oxidation chamber particulate matter tarp of IS-2062 grade 'B' with high temparature resistance paint, vibration damper & gasket shielding & guarding of insulation with SS202 cladding, making structre, maintance platform & ladder of IS 2062 grade B with high temprature resistant paint, Manual exhaust by pass system present- A manual valve will be given after the first stage (oxidation stage) and before the second stage (Passive Regenrative trap) of the DOFF, Noise attenuation is within the permissble limits, equipped with mechanical pressure relief system, capturing chamber made of resistance process treated mild steel etc as reqd complete all as specified and directed. (Note- (i) The contractor should hire OEM only for precurement to installation and commissioning of RECD. (ii) Test report and certification from NABL lab approved by MoEFCC reconginsed laboratory regarding emmission quality parameters before the device is installed and shold qualify as per NGT norms, it shall be recorded and submit to Engineer-in-Charge. (iii) All specification and norms regarding OEM supplier and RECD is provided as per norms of Central Pollution Control Board. Only passing those parameters OEM supplier should be choosen by the contractor, otherwise OEM not be qualified as OEM for this project.)
All as per Srl item No. 01 here-in-before including notes but of capacity 62.5 KVA complete all as specified and directed please.
SARASWATI ENTERPRISE (INDEX NO CEEC D-81)
M/S MBS TRADING CO
REMCO
SANKAR TRADERS
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .