| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹84.0 LAccepted-AOC | L1 | Accepted-AOC lowest | |
| 2 | L2₹93.0 L+₹9.0 L (10.7%)Rejected-Finance | L2 | Rejected-Finance 2nd Lowest | |
| 3 | L3₹1.0 Cr+₹16.6 L (19.8%)Rejected-Finance | L3 | Rejected-Finance 3rd Lowest | |
| 4 | L4₹1.1 Cr+₹23.7 L (28.2%)Rejected-Finance | L4 | Rejected-Finance 4th Lowest |
| Sl No | Description | Qty | Unit | M/S SHUKLA ENTERPRISES L1 | M/s S.B.S. Traders L3 | ARK ENGINEERING L2 | V.K. TRADERS L4 |
|---|---|---|---|---|---|---|---|
| 1.00Part-A (Material Provided by Contractor) | |||||||
| 1.01 | 33 KV Feeder Pillar Box | 16 | Nos. | 1,00,000 ₹16,00,000 | 1,00,000 ₹16,00,000 | 1,50,000 ₹24,00,000 | 95,000 ₹15,20,000 Lowest |
| 1.02 | 33 KV ‘XLPE’ C/J Kit 3x300mm² Indoor | 32 | Nos | 6,500 ₹2,08,000 Lowest | 6,500 ₹2,08,000 Lowest | 8,000 ₹2,56,000 | 7,000 ₹2,24,000 |
| 1.03 | 33 KV ‘XLPE’ C/J Kit 3x300mm² Outdoor | 20 | Nos. | 6,500 ₹1,30,000 Lowest | 6,500 ₹1,30,000 Lowest | 8,000 ₹1,60,000 | 7,500 ₹1,50,000 |
| 1.04 | 33 KV ‘XLPE’ C/J Kit 3x300mm² Straight Through | 6 | Nos. | 15,000 ₹90,000 Lowest | 18,500 ₹1,11,000 | 15,000 ₹90,000 Lowest | 21,000 ₹1,26,000 |
| 1.05 | M S Channel 100x50 mm 2400 mm Long | 45 | Nos. | 3,500 ₹1,57,500 | 3,600 ₹1,62,000 | 1,500 ₹67,500 Lowest | 2,000 ₹90,000 |
| 1.06 | M S Holding Clamp for STP Support | 90 | Nos. | 300 ₹27,000 Lowest | 450 ₹40,500 | 300 ₹27,000 Lowest | 300 ₹27,000 Lowest |
| 1.07 | Nut Bolt and washer all sizes | 18 | KG | 150 ₹2,700 | 220 ₹3,960 | 150 ₹2,700 | 100 ₹1,800 Lowest |
| 1.08 | Number Plate with clamp and Nut & Bolt | 18 | Nos. | 150 ₹2,700 | 160 ₹2,880 | 200 ₹3,600 | 100 ₹1,800 Lowest |
| 1.09 | Danger Board with clamp and Nut & Bolt | 18 | Nos. | 150 ₹2,700 Lowest | 260 ₹4,680 | 200 ₹3,600 | 150 ₹2,700 Lowest |
Tender Value
Refer Docs
EMD Value
₹1.5 L
Closing Date
9 Sept 2025, 4:00 pmClosed
Superintending Engineer
Mohaddipur Gorakhpur
Construction of 33 KV line Rustampur Gorakhpur
2025_PVVNV_1069414_1
12/EWC(G)/2025-26
Open Tender
Electrical Works
Item Wise
30 days
Gorakhpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
SE EWC
₹1.5 L
Yes
16 Oct 2025
28 Aug 2025
10 Sept 2025
28 Aug 2025
9 Sept 2025
28 Aug 2025
Amount
Part-A (Material Provided by Contractor)
33 KV Feeder Pillar Box
33 KV ‘XLPE’ C/J Kit 3x300mm² Indoor
33 KV ‘XLPE’ C/J Kit 3x300mm² Outdoor
33 KV ‘XLPE’ C/J Kit 3x300mm² Straight Through
M S Channel 100x50 mm 2400 mm Long
M S Holding Clamp for STP Support
Nut Bolt and washer all sizes
Number Plate with clamp and Nut & Bolt
Danger Board with clamp and Nut & Bolt
Barbed Wire
Red Oxide Paint
Aluminium Paint
Earthing Complete (Per set =01 No Earthing Rod + 2Kg GI Wire)
Holding Clamp for GI Pipe
Holding Clamp for cable
33 KV X-arm for temporary line as per site requirement
33 KV X-arm clamp for temporary line as per site requirement
Armoured copper control cable 2 x 2.5 mm2
Armoured copper control cable 4 x 2.5 mm2
PART - B- WORK Shifting, Loading Carriage & Unloading of following materials from store centre Gorakhpur to work site for 33/11 KV S/S Rushtampur
ST Pole 11 m
33 KV 3x300 XLPE Cable
33 KV Bus Isolator
33 KV Bus Isolator structure
33 KV CT 400/200/1A
33 KV CT Structure
33 KV VCB with structure
33 KV Control pannel for single feeder
ACSR Dog Conductor
Laying of 33 KV 3x300 mm² ‘XLPE’ cable in cable trench. As per site requirement
Laying of 33 KV 3x300 mm² ‘XLPE’ cable(D/C) with HDD Method. As per site requirement
Jointing charge of 33 KV ‘XLPE’ C/J Kit 3x300 mm² Outdoor/Indoor
Jointing charge of 33 KV ‘XLPE’ C/J Kit 3x300 mm² Straight Through
Providing and laying of 33 KV ‘XLPE’ cable in air after providing 6” dia.M.S. pipe 3m long Complete work.
Road Restoration Charges (Pakka Road) during cable laying and road cutting.
Making plinth for installation of feeder pillar box
Installation of 33 KV Feeder Pillar Box with complete wiring and complete work
Special pipe earthing for cable and kit protection
Erection of Double pole structure on 11 mtr ST Pole for only Cable rising with fitting of all accessories.
Concreting of pole and making plinth for poles 30 cm above, grouting in the ratio 1:4:8 (cement, sand, 40mm stone ballast), back filling of earth, proper ramming. (as per UPPCL Norms)
Erection and grouting of Bus Isolator Structure and install Bus Isolator and earthing complete work.
Erection and grouting of CT Structure and installation of 33 KV CT, wiring and earthing complete work.
Erection and grouting of VCB Structure and installation of 33 KV VCB, wiring and earthing complete work.
Installation of 33 KV CR Pannel, wiring and earthing complete work.
Erection of Single pole on 11 mtr long ST Pole with fitting of accessories for Temporary line
Temporary hanging of 3x300Sq.mm, XLPE Cable 33 KV on erected ST Pole
Dismantling of Temporary cable and ready to use as permanent
Laying from switchyard to control room for 33 KV panel, CT, VCB by digging trench and making connection complete. (As per site requirement laying of cable though cable trench if available with covering brick and sand.
Dismantling of Temporary ST Pole and X arm and receive back to store centre Gorakhpur
Noc and other permission (Forest/NHAI/PWD etc) provoded by contractor
ARK ENGINEERING (BID ID -5523255)
M/s S.B.S. Traders (BID ID -5522779)
V.K. TRADERS (BID ID -5523392)
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .