Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.3 LAdmitted-Fee/PreQual/Technical/Finance | -36.00% | ₹1.3 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹1.4 L+₹14,380.32 (11.3%)Admitted-Fee/PreQual/Technical/Finance | -28.76% | ₹1.4 L+₹14,380.32 (11.3%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹1.4 L+₹14,400.18 (11.3%)Admitted-Fee/PreQual/Technical/Finance | -28.75% | ₹1.4 L+₹14,400.18 (11.3%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹1.5 L+₹22,860.71 (18.0%)Admitted-Fee/PreQual/Technical/Finance | -24.49% | ₹1.5 L+₹22,860.71 (18.0%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.0 L
EMD Value
₹3,980
Closing Date
10 Aug 2026, 6:00 pmClosed
Executive Engineer RRWD SMC
Executive Engineer RIGHT RIVER WORKS DIVISON SMC REGAL LANE LAL CHOWK
Construction of tile lane from main road via H/O Abdul Hameed Alakband H/o Bashir Ahmad Alakband and others upto H/o Mushtaq Ahmad Alakband at Al-Noor Colony, Doctors Lane, Ellahibagh Sgr
2026_HAUDD_317172_15
SHORT Term NOTICE INVITING ETENDER No. 19 of 2026-2027 Dated 21.07.2026 RRWD SMC
Open Tender
Civil Works
Percentage
30 days
Doctors Lane, Ellahibagh Sgr
PLEASE REFER TO TENDER DOCUMENT
2 documents required · 2 mandatory
₹200
FA/CAO AC NO 0216010200000007
₹3,980
13 Aug 2026
22 Jul 2026
11 Aug 2026
23 Jul 2026
10 Aug 2026
23 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Engagement of Labourers for site clearance including removal of mulba etc | 5 | No. | 553 | ₹2,765 |
| - | Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m in -All kinds of soil | 99.62 | Sqm | 24.12 | ₹2,402.83 |
| - | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 6.32 | Cum | 5,202.9 | ₹32,882.33 |
| - | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 8.85 | Cum | 7,014.35 | ₹62,077 |
| - | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level: Thermo-Mechanically Treated bars of grade Fe-500D or more | 647.25 | Kgs | 123.2 | ₹79,741.2 |
| - | Raising of Manholes in cement concrete work including raising of manhole covers (Polycrate Manholes) | 3 | No. | 3,000 | ₹9,000 |
| - | Removal of Mulba/Unhygienic Material/Mud/unserviceable material from the site including its disposal beyond Municipal Limits by Mechanical Transport including all carriages, leads and Lifts complete job as directed at site. | 4 | Cum | 350 | ₹1,400 |
| - | Carriage of material by mechanical Transport.
Sand/Aggregates | 20.47 | Cum | 409.49 | ₹8,382.26 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.94 MB
BOQ_1038957.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .