Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.9 LAdmitted-Finance | ₹17.9 L | L1 | Admitted-Finance |
| 2 | L2₹21.5 L+₹3.6 L (20.4%)Admitted-Finance | ₹21.5 L+₹3.6 L (20.4%) | L2 | Admitted-Finance |
| 3 | L3₹25.7 L+₹7.8 L (43.5%)Admitted-Finance | ₹25.7 L+₹7.8 L (43.5%) | L3 | Admitted-Finance |
| 4 | L4₹27.9 L+₹10.0 L (55.9%)Admitted-Finance | ₹27.9 L+₹10.0 L (55.9%) | L4 | Admitted-Finance |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | NATIONAL CONTRACTOR & GENERAL ORDER SUPPLIER L1 | SIDDHI ENTERPRISES L4 | KRISHNA PRAKASH SRIVASTAVA L3 | A. A. ENGINEERING CO. L2 |
|---|---|---|---|---|---|---|---|
| 1.00GEM Maintenance Free Earthing for Substations. | |||||||
| 1.01 | Supply & Installation of : GEM Maintenance Free Earthing for Substations: By Installation of 14.2 mm dia Nickel plated MS Rod electrodes, 3 metre long with 250 micron molecular copper bonding. Electrodes to conform to UL 467 Standards and are stamped with UL Listing Mark, conforming to IEC 62561 -2 Specs, alongwith 2 bags of GEM (Ground Enhancement Material) of 11.3 Kg each as per IEC 62561 - 7 Standard, plus Gun Metal H Clamp assembly with SS Nut Bolt & Spring Washer. Electrodes/Earth Pits will be interconnected by 50 mm X 6 mm GI strip and connecting all switchyard structures to achieve Equipotential earthing. | 60 | Nos. | 10,000 ₹6,00,000 Lowest | 19,000 ₹11,40,000 | 17,100 ₹10,26,000 | 14,900 ₹8,94,000 |
| 1.02 | Supply & Installation of : GEM Maintenance Free Earthing for Substations: By Installation of 14.2 mm dia Nickel plated MS Rod electrodes, 3 metre long with 250 micron molecular copper bonding. Electrodes to conform to UL 467 Standards and are stamped with UL Listing Mark, conforming to IEC 62561 -2 Specs, alongwith 2 bags of GEM (Ground Enhancement Material) of 11.3 Kg each as per IEC 62561 - 7 Standard, plus Gun Metal H Clamp assembly with SS Nut Bolt & Spring Washer. Electrodes/Earth Pits will be interconnected by 50 mm X 6 mm GI strip and connecting all switchyard structures to achieve Equipotential earthing. | 60 | Nos. | 10,000 ₹6,00,000 Lowest | 19,000 ₹11,40,000 | 17,100 ₹10,26,000 | 14,000 ₹8,40,000 |
| 1.03 | Supply & Installation of : 50 X 6 mm GI Strip, with full 3 sides welding | 1,200 | Mtr. | 491 ₹5,89,200 | 425 ₹5,10,000 | 430 ₹5,16,000 | 350 ₹4,20,000 Lowest |
Tender Value
₹26 L
EMD Value
₹26,000
Closing Date
4 Aug 2026, 2:00 pmClosed
S.E., TECHNICAL, LUCKNOW
33/11 kV S/S HAL POWER HOUSE LUCKNOW
51/SE(T)/GNZ/2026-27
2026_MVVNL_1162953_4
51/SE(T)/GNZ/2026-27
Open Tender
Electrical Works
Item Rate
60 days
33/11 kV S/S HAL POWER HOUSE LUCKNOW
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
A/C No. 77290200000745 IFSC Code BARB0VJRSMN
₹26,000
12 Aug 2026
30 Jul 2026
4 Aug 2026
30 Jul 2026
4 Aug 2026
30 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1GEM Maintenance Free Earthing for Substations. | |||||
| 1.01 | Supply & Installation of : GEM Maintenance Free Earthing for Substations: By Installation of 14.2 mm dia Nickel plated MS Rod electrodes, 3 metre long with 250 micron molecular copper bonding. Electrodes to conform to UL 467 Standards and are stamped with UL Listing Mark, conforming to IEC 62561 -2 Specs, alongwith 2 bags of GEM (Ground Enhancement Material) of 11.3 Kg each as per IEC 62561 - 7 Standard, plus Gun Metal H Clamp assembly with SS Nut Bolt & Spring Washer. Electrodes/Earth Pits will be interconnected by 50 mm X 6 mm GI strip and connecting all switchyard structures to achieve Equipotential earthing. | 60 | Nos. | - | - |
| 1.02 | Supply & Installation of : GEM Maintenance Free Earthing for Substations: By Installation of 14.2 mm dia Nickel plated MS Rod electrodes, 3 metre long with 250 micron molecular copper bonding. Electrodes to conform to UL 467 Standards and are stamped with UL Listing Mark, conforming to IEC 62561 -2 Specs, alongwith 2 bags of GEM (Ground Enhancement Material) of 11.3 Kg each as per IEC 62561 - 7 Standard, plus Gun Metal H Clamp assembly with SS Nut Bolt & Spring Washer. Electrodes/Earth Pits will be interconnected by 50 mm X 6 mm GI strip and connecting all switchyard structures to achieve Equipotential earthing. | 60 | Nos. | - | - |
| 1.03 | Supply & Installation of : 50 X 6 mm GI Strip, with full 3 sides welding | 1,200 | Mtr. | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.50 MB
RE-Tenderform-51-2026-27.pdf
Tender Documents • 1.80 MB
BOQ_2203691.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .