Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance 126 JULEDHA SARDHANA SARDHANA MEERUT UTTAR PRADESH 250342 | MEERUT | UTTAR PRADESH | 250342 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹5.0 L
EMD Value
₹5,000
Closing Date
4 Dec 2020, 1:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE
Pallavpuram
System Improvement work against Sanction linkage and package of different type of work in Sardhana
2020_PVVNL_524311_2
106/EDC-2/MT/2020-21
Open Tender
Electrical Works
Item Rate
30 days
Meerut
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
SE EDC-2
₹5,000
24 Dec 2020
27 Nov 2020
4 Dec 2020
27 Nov 2020
4 Dec 2020
27 Nov 2020
180 days
Amount
Electrical Line Work :-
Cartage of following from store center Meerut to dump site including loading & unloading at both ends maximum distance up to 20 Km :– A) 63 KVA T/f.
B) 250 KVA T/f.
B) 400 KVA T/f.
Cartage of line material from store centre to dump site & then dump site to site of work on day to day basis, including loading & unloading at both ends maximum distance up to 20 Km.
Making plinth suitable for 250 KVA (3 x2x1 mtr.) Transformer alongwith plaster & paint.
Providing & fixing of wiremess fancing around the plinth of 250 KVA T/f (3 x2x1 mtr.)
Water level earthing of T/f (neutral & body) after providing of G.I pipe 32mm Dia and MS. Flat 35x5mm up to 20 mtr depth complet work in all respect.
Removal of 02 no. 25 KVA & 02 no. 100 KVA T/f from double pole after opening the connection with the help of chain tackle safely.
Mounting of 02 no. 63 KVA T/f on double pole & making connection properly.
Safe placing of 250 KVA T/f on newly constructed plinth alongwith making connection properly.
Removal of 250 KVA T/f from double pole after opening the connection with the help of chain tackle safely.
Safe placing of 400 KVA T/f on newly constructed plinth alongwith making connection properly.
Providing & fixing of MS Nut & Bolt off size.
Providing & fixing of MS clamp off size
Laying lifting, sagging & binding properly of AB Conductor with the help of J hook & pearcing clamp. (240 mtr. + 135 mtr.)
Earthing of each 11 KV line pole & T/F properly after drive of electrodes if size 20mmx250mm and connection the earthing point with GL wire.
Fixing of Distribution box properly and making connection of service cable properly.
Providing & fixing as follows :- A) Pearcing clamp
B) Dead end clamp
C) Suspension clamp
Back cartage of old & used material as follow:- A) 25 KVA T/f.
B) 100 KVA T/f.
C) 250 KVA T/f.
M/S ABID CONTRACTOR
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .