| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹35.7 CrAccepted-AOC 200 C P COLONY MORAR GWALIOR M P 474006 | GWALIOR | GWALIOR | MADHYA PRADESH | 474006 | L1 | Accepted-AOC Being Lowest Bidder and reasonable bid | |
| 2 | L2₹37.7 Cr+₹1.9 Cr (5.26%)Rejected-Finance | L2 | Rejected-Finance Other than lowest Bidder | |
| 3 | L3₹38.4 Cr+₹2.6 Cr (7.17%)Rejected-Finance 14 KISHANGARH WEST IDGAH AGRA 282001 | AGRA | UTTAR PRADESH | 282001 | L3 | Rejected-Finance Other than lowest Bidder | |
| 4 | L4₹39.0 Cr+₹3.1 Cr (8.76%)Rejected-Finance | L4 | Rejected-Finance Other than lowest Bidder | |
| 5 | L5₹43.5 Cr+₹7.7 Cr (21.4%)Rejected-Finance STREET NO 11 SECTOR NO 04 TILAK NAGAR SAGAR ROAD BIKANER RAJASTHAN 334001 | BIKANER | RAJASTHAN | 334001 | L5 | Rejected-Finance Other than lowest Bidder |
| Sl No | Description | Qty | Unit | JASPAL SINGH & CONST L3 | Agarwal Jagdish Construction Company Pvt. Ltd. L6 | PRAGMATIC INFRASTRUCTURE LIMITED L4 | Roshan Lal Talwar L5 | ATUL CONSTRUCTION CO. L1 | BHASHA INFRA PVT LTD L2 | TRISHUL CONSTRUCTIONS L7 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Note:- 1. Please refer schedule 'A' notes before quoting the tender. 2. Amount of schedudle of credit shall be deducted offline by department . | ||||||||||
| 2.00GENERAL SUMMARY | ||||||||||
| 3.00 | Lump sum price worked out by the contractor for BUILDING WORKS as listed in Schedule ‘A’ Part-I (Ref prepriced schedule attached seperately) | 1 | LUMP SUM | 30,71,36,362.27 ₹30,71,36,362.27 | 34,84,97,600 ₹34,84,97,600 | 30,50,00,000 ₹30,50,00,000 | 35,54,00,000 ₹35,54,00,000 | 27,87,98,080 ₹27,87,98,080 Lowest | 29,62,22,960 ₹29,62,22,960 | 44,99,36,936 ₹44,99,36,936 |
| 4.00 | Lump sum price worked out by the contractor for SCHEDULE ‘A’ PART- II (INTERNAL WATER SUPPLY WORKS) as listed in Schedule ‘A’ Part- II (Ref prepriced schedule attached seperately) | 1 | LUMP SUM | 7,48,014.62 ₹7,48,014.62 | 10,77,141.06 ₹10,77,141.06 | 6,12,000 ₹6,12,000 | 7,42,000 ₹7,42,000 | 7,77,935.21 ₹7,77,935.21 | 5,98,411 ₹5,98,411 Lowest | 7,20,000 ₹7,20,000 |
| 5.00 | Lump sum price worked out by the contractor for SCHEDULE ‘A’ PART-III (INTERNAL ELECTRIFICATION WORKS ) as listed in Schedule ‘A’ Part -III (Ref prepriced schedule attached seperately) | 1 | LUMP SUM | 57,52,503.53 ₹57,52,503.53 | 71,13,310.82 ₹71,13,310.82 | 59,90,000 ₹59,90,000 | 56,21,000 ₹56,21,000 | 55,66,938.9 ₹55,66,938.9 Lowest | 60,00,000 ₹60,00,000 | 57,00,000 ₹57,00,000 |
| 6.00 | Lump sum price worked out by the contractor for SCHEDULE ‘A’ PART-IV (EXTERNAL ELECTRIC SUPPLY WORKS) as listed in Schedule ‘A’ Part-IV (Ref prepriced schedule attached seperately) | 1 | LUMP SUM | 84,48,402.14 ₹84,48,402.14 | 94,68,036.88 ₹94,68,036.88 | 74,00,000 ₹74,00,000 | 1,02,00,000 ₹1,02,00,000 | 1,00,50,685.3 ₹1,00,50,685.3 | 70,00,000 ₹70,00,000 Lowest | 90,50,000 ₹90,50,000 |
| 7.00 | Lump sum price worked out by the contractor for SCHEDULE 'A' PART-V (SEWAGE DISPOSAL AND RCC SEPTIC TANK WORKS) as listed in Schedule ‘A’ Part-V (Ref prepriced schedule attached seperately) | 1 | LUMP SUM | 18,15,144.09 ₹18,15,144.09 | 19,96,658.5 ₹19,96,658.5 | 16,80,000 ₹16,80,000 | 17,64,000 ₹17,64,000 | 17,42,538.33 ₹17,42,538.33 | 13,49,000 ₹13,49,000 Lowest | 20,98,747 ₹20,98,747 |
| 8.00 | Lump sum price worked out by the contractor for SCHEDULE ‘A’ PART-VI (ROAD, PATH AND CULVERT WORKS) as listed in Schedule ‘A’ Part-VI (Ref prepriced schedule attached seperately) | 1 | LUMP SUM | 1,88,02,903.18 ₹1,88,02,903.18 | 2,68,61,290.26 ₹2,68,61,290.26 | 2,11,00,000 ₹2,11,00,000 | 1,84,00,000 ₹1,84,00,000 | 1,90,26,747.27 ₹1,90,26,747.27 | 1,78,00,000 ₹1,78,00,000 Lowest | 1,83,47,654 ₹1,83,47,654 |
| 9.00 | Lump sum price worked out by the contractor for SCHEDULE 'A' PART-VII (AREA DRAINAGE WORKS) as listed in Schedule ‘A’ Part-VII (Ref prepriced schedule attached seperately) | 1 | LUMP SUM | 67,84,190 ₹67,84,190 | 74,62,609 ₹74,62,609 | 64,00,000 ₹64,00,000 | 69,00,000 ₹69,00,000 | 57,66,561.5 ₹57,66,561.5 | 57,60,000 ₹57,60,000 Lowest | 77,33,905 ₹77,33,905 |
| 10.00 | Lump sum price worked out by the contractor for SCHEDULE 'A' PART- VIII (COMPOUND WALL, FENCING AND GATE WORKS) as listed in Schedule ‘A’ Part-VIII (Ref prepriced schedule attached seperately) | 1 | LUMP SUM | 24,56,555.5 ₹24,56,555.5 | 36,84,833.25 ₹36,84,833.25 | 27,00,000 ₹27,00,000 | 28,58,000 ₹28,58,000 | 27,02,211.05 ₹27,02,211.05 | 20,86,555 ₹20,86,555 Lowest | 26,78,347 ₹26,78,347 |
Tender Value
₹34.0 Cr
EMD Value
₹15 L
Closing Date
27 Dec 2025, 6:00 pmClosed
CHIEF ENGR, BHOPAL ZONE
HQ CHIEF ENGR BHOPAL ZONE, MES SI LINE BHOPAL 462001
PROVN OF OTM ACCN AT SAUGOR UNDER GE SAUGOR
2025_MES_740581_1
CEBZ/SAG/TOKEN/24 OF 2025-26
Open Tender
Civil Works
Lump-sum
750 days
SAUGOR
AS PER TENDER DOCUMENTS
5 documents required · 5 mandatory
₹3,000
GE SAUGUR
₹15 L
Bhopal
1 Jul 2026
19 Nov 2025
3 Jan 2026
19 Nov 2025
27 Dec 2025
20 Dec 2025
1 Dec 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 2GENERAL SUMMARY | |||||
| 3 | Lump sum price worked out by the contractor for BUILDING WORKS as listed in Schedule ‘A’ Part-I (Ref prepriced schedule attached seperately) | 1 | LUMP SUM | 24,33,20,770.61 | ₹24,33,20,770.61 |
| 4 | Lump sum price worked out by the contractor for SCHEDULE ‘A’ PART- II (INTERNAL WATER SUPPLY WORKS) as listed in Schedule ‘A’ Part- II (Ref prepriced schedule attached seperately) | 1 | LUMP SUM | 6,25,267.37 | ₹6,25,267.37 |
| 5 | Lump sum price worked out by the contractor for SCHEDULE ‘A’ PART-III (INTERNAL ELECTRIFICATION WORKS ) as listed in Schedule ‘A’ Part -III (Ref prepriced schedule attached seperately) | 1 | LUMP SUM | 9,51,295.09 | ₹9,51,295.09 |
| 6 | Lump sum price worked out by the contractor for SCHEDULE ‘A’ PART-IV (EXTERNAL ELECTRIC SUPPLY WORKS) as listed in Schedule ‘A’ Part-IV (Ref prepriced schedule attached seperately) | 1 | LUMP SUM | 73,44,500.09 | ₹73,44,500.09 |
| 7 | Lump sum price worked out by the contractor for SCHEDULE 'A' PART-V (SEWAGE DISPOSAL WORKS) as listed in Schedule ‘A’ Part-V (Ref prepriced schedule attached seperately) | 1 | LUMP SUM | 1,13,022.03 | ₹1,13,022.03 |
| 8 | Lump sum price worked out by the contractor for SCHEDULE ‘A’ PART-VI (ROAD, PATH AND CULVERT WORKS) as listed in Schedule ‘A’ Part-VI (Ref prepriced schedule attached seperately) | 1 | LUMP SUM | 2,34,45,790.84 | ₹2,34,45,790.84 |
| 9 | Lump sum price worked out by the contractor for SCHEDULE 'A' PART-VII (AREA DRAINAGE WORKS) as listed in Schedule ‘A’ Part-VII (Ref prepriced schedule attached seperately) | 1 | LUMP SUM | 67,84,190 | ₹67,84,190 |
| 10 | Lump sum price worked out by the contractor for SCHEDULE 'A' PART- VIII (COMPOUND WALL, FENCING AND GATE WORKS) as listed in Schedule ‘A’ Part-VIII (Ref prepriced schedule attached seperately) | 1 | LUMP SUM | 24,56,555.5 | ₹24,56,555.5 |
| 11 | Lump sum price worked out by the contractor for SCHEDULE 'A' PART-IX (RETAINING WALL WORKS) as listed in Schedule ‘A’ Part-IX (Ref prepriced schedule attached seperately) | 1 | LUMP SUM | 23,99,604.62 | ₹23,99,604.62 |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.45 MB
BOQ_829280.xls
BOQ • 0.74 MB
Tender24.pdf
Tender Documents • 7.86 MB
DRG_ALL.pdf
Additional Documents • 36.17 MB
corrigendum11.pdf
PDF • 0.13 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .