Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.2 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹2.3 L+₹7,175.35 (3.29%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹2.3 L+₹10,295.07 (4.71%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹2.3 L+₹12,478.87 (5.71%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L5₹2.8 L+₹62,394.35 (28.6%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹3.1 L
EMD Value
₹6,240
Closing Date
4 Jul 2026, 6:55 pmClosed
Executive Engineer REW Pulwama
Executive Engineer REW Pulwama
C/O P/BUND ON HOSPITAL KUL KHUDPATH CRPF CAMP AND NIKYUN KHA NEAR L/O AB RASHID BABA AT TRAL BALA
2026_RDPR_313499_6
e- NIT No. 35/2026-27 Dated 24-06-2026
Open Tender
Civil Works
Percentage
30 days
Pulwama
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Executive Engineer REW Pulwama
₹6,240
6 Jul 2026
24 Jun 2026
6 Jul 2026
24 Jun 2026
4 Jul 2026
24 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and
disposal of surplus excavated earth as directed, within a lead of 50 metres: | 33.04 | cum | - | - |
| 2 | Providing laying dry stone solling and PLUM hand packed including carriage 05km by MT with plum | 11.76 | cum | - | - |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6graded stone aggregate 20 mm nominal size) | 34.61 | cum | - | - |
| 4 | Providing and Applying 12mm plaster in 1:6 mix ( 1 cement : 6 fine sand) | 108.32 | sqm | 1 | ₹108.21 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. | 165.06 | sqm | - | - |
| 6 | Sand carriage by by MT avg lead of 11 kM. | 15.92 | cum | - | - |
| 7 | Bajri carriage by by MT avg lead of 5 kM. | 30.8 | cum | 1 | ₹30.77 |
| 8 | Add cost of photograph and sign board etc.and other unforseen items to be paid as per actual | 1 | LS | - | - |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.55 MB
BOQ_1014819.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .