| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.7 LAccepted-AOC | ₹5.7 L Quoted ₹6.7 L | L1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | A KALIPPAN L1 |
|---|---|---|---|---|
| 1.00 | Earth work excavation in hard stiff clay, stiff black cotton, hard red earth, shales, murrum, gravel, stoney earth mixed with small size boulders and hard gravelly soil with initial lead of 10 m and lift of 2 m | 26 | M3 | 132 ₹3,432 |
| 2.00 | Collection,Supplying and spreading of M.sand with well watering and consolidation as per standard specification including cost of all materials lead lift etc complete | 4 | M3 | 2,495 ₹9,980 |
| 3.00 | PCC 1:3:6 using 40mm HBS machine crushed metal for foundation including cost of all labour, materials, lead, lift, curing etc., complete. | 4 | M3 | 6,182 ₹24,728 |
| 4.00 | PCC 1 : 2 : 4 mix using 12-20mm HBS metal with formwork including cost of all materials, lead, lift, etc, complete | 1 | M3 | 11,736 ₹11,736 |
| 5.00 | Brickwork in CM 1:5 using chamber Bricks including cost of all material, labour lead lift curing etc complete. | 25 | M3 | 8,000 ₹2 L |
| 6.00 | RCC 1:1.5:3 using 20mm (machine crushed) metal including cost of all materials, lead, lift, labour with formwork etc., complete. | 3 | M3 | 14,082 ₹42,246 |
| 7.00 | Supplying and fabricating and placing in position of MS/RTS steelk reinforcement for RCC works including labour for cutting bending tying and fixing in position as per specification including cost of all materials lead lift cost of binding wire etc complete | 240 | Kg | 93 ₹22,320 |
| 8.00 | Fabrication, supplying and fixing of steel members for Fencing angle, Flat channel including cost cutting welding, drilling for Bolt & nut fixing enamel painting, lead, lift etc complete | 382.5 | Kg | 148 ₹56,610 |
| 9.00 | Supply and fixing of 50 Sq.mm GI Chain link fencing of 10 gauge with standard width of 1.80m height including cost of all material, labour for fixing, transportion, lead, lift, etc., complete. | 40 | Rm | 554 ₹22,160 |
| 10.00 | Plastering with CM 1:5 mix 12 mm thick for inside and ouitside walls including all cost labour materials lead lift etc complete | 101 | M2 | 290 ₹29,290 |
Tender Value
Refer Docs
EMD Value
₹6,000
Closing Date
29 Jan 2026, 12:00 pmClosed
SE/GCC/Madurai
SE/GCC/Madurai
Providing gate pillars Madagupatty 110/22 KV SS
2026_EB_644705_1
SE/GCC/Madurai F. Specn. No.060/2025-26
Limited
Civil Works
60 days
Madurai
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹6,000
18 May 2026
19 Jan 2026
30 Jan 2026
19 Jan 2026
29 Jan 2026
19 Jan 2026
Earth work excavation in hard stiff clay, stiff black cotton, hard red earth, shales, murrum, gravel, stoney earth mixed with small size boulders and hard gravelly soil with initial lead of 10 m and lift of 2 m
Collection,Supplying and spreading of M.sand with well watering and consolidation as per standard specification including cost of all materials lead lift etc complete
PCC 1:3:6 using 40mm HBS machine crushed metal for foundation including cost of all labour, materials, lead, lift, curing etc., complete.
PCC 1 : 2 : 4 mix using 12-20mm HBS metal with formwork including cost of all materials, lead, lift, etc, complete
Brickwork in CM 1:5 using chamber Bricks including cost of all material, labour lead lift curing etc complete.
RCC 1:1.5:3 using 20mm (machine crushed) metal including cost of all materials, lead, lift, labour with formwork etc., complete.
Supplying and fabricating and placing in position of MS/RTS steelk reinforcement for RCC works including labour for cutting bending tying and fixing in position as per specification including cost of all materials lead lift cost of binding wire etc complete
Fabrication, supplying and fixing of steel members for Fencing angle, Flat channel including cost cutting welding, drilling for Bolt & nut fixing enamel painting, lead, lift etc complete
Supply and fixing of 50 Sq.mm GI Chain link fencing of 10 gauge with standard width of 1.80m height including cost of all material, labour for fixing, transportion, lead, lift, etc., complete.
Plastering with CM 1:5 mix 12 mm thick for inside and ouitside walls including all cost labour materials lead lift etc complete
Colour washing two coats with cement paint approved colour over primary coats for out side wall including cost of all materials, lead, lift, labour etc., complete.
Supplying and fixing in position of MS grill gate including cost of all materials lead, lift, etc. as per type design drawing with proper locking arrangements as directed by the engineer at site including cost of painting with two coats of enamel paint over with one coat of red oxide.
S&F of 3 phase 3HP Submersiable pump with accessories of approved make of Texmo or ELG Iincluding cost of all materials,labour transport,lead,lift etc with mounting platform & foot valve arrangement and 3 phase 15 amphs L& T starter arragements etc complete
Supplying and fixing of 50 mm dia outer HDPE Hose fine tee, flow tee of ISI make with connecting sepcieals for suction including cost of all materials ,labour, lead, lifts, etc, complete.
Supplying and fixing of 1000 lit capacity sintex tank of approved quality including cost of materials labour for fixing lead lifts etc., complete
SGST to be quoted in Percentage (value alone) Ex. 9%, it should be entered as 9 only
CGST to be quoted in Percentage (value alone) Ex. 9%, it should be entered as 9 only
Inter-state GST @18% for other than Tamil Nadu supplier. If the contractor is within Tamil Nadu may be quoted as "0" only
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
BOQ_772576.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid