Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹9.2 LAccepted-AOC 443 V P O LIWAN 132001 | KARNAL | HARYANA | 132001 | 1 | Accepted-AOC Being L1 bidder | |
| 2 | 2₹9.7 L+₹40,812 (4.42%)Rejected-AOC 528 PREETI NAGAR 125001 | HISAR | HARYANA | 125001 | 2 | Rejected-AOC work awarded to L 1 bidder | |
| 3 | 3₹10.5 L+₹1.3 L (13.8%)Rejected-AOC FATEHABAD HGVY | FATEHGARH SAHIB | PUNJAB | 140402 | 3 | Rejected-AOC work awarded to L 1 bidder | |
| 4 | 4₹13.6 L+₹4.3 L (47.0%)Rejected-AOC | 4 | Rejected-AOC work awarded to L 1 bidder | |
| 5 | Rejected-Technical GURGAON HARYANA 122002 UDYAM HR 05 0027927 | GURUGRAM | HARYANA | 122002 | - | Rejected-Technical PQR NOT FULFILLED |
Tender Value
Refer Docs
EMD Value
₹27,700
Closing Date
25 Sept 2023, 6:00 pmClosed
TINKU
CE RGTPP Khedar Hisar
Running, Operation and Maintenance of Sewage Treatment Plant of Capacity 30 KLD in Plant area and 400 KLD in RGTPP Colony Khedar for the FY 2023-24
2023_HBC_310009_1
20237CA22C2A 1663 447A 9D21 80090AD11F31712PGC
Open Tender
Civil Works
Works
365 days
RGTPP COLONY KHEDAR
AS PER NIT
2 documents required · 2 mandatory
₹1,180
₹27,700
Yes
13 Dec 2023
9 Sept 2023
28 Sept 2023
9 Sept 2023
25 Sept 2023
9 Sept 2023
Amount
Repairing/rewinding of motor/pump having capacity of 2.1 KW to 3.0 KW (NS item)
Repairing/rewinding of motor/pump having capacity of 4.1 KW to 6.0 KW (NS item)
Repairing/rewinding of motor/pump having capacity of 10.1 KW to 11 KW (NS item)
Running, Operation and Maintenance of Sewage Treatment Plant of Capacity 30 KLD in Plant area and 400 KLD in RGTPP Colony Khedar (NS item) with following scope of work I. Complete Operation of 30 KLD in Plant Area & 400 KLD capacities Sewage Treatment Plant at RGTPP Colony. For this purpose round the clock services of skilled operator (s) for operation of 400 KLD plant and daily 8 Hours services of skilled operator (s) in General shift for operation of 30 KLD plant shall be provided by the firm. Supervisory services of supervisor (s) having sound knowledge of electrical & mechanic system shall also be provided by firm. Firm shall ensure to give rest to persons deployed at site as per labour laws. Rest reliver (s) shall be skilled operator. II. Maintenance like decoupling, coupling, lubricating, gland-packing, dismantling, removal and unfastening/decoupling of equipment/ valves/pumps for to and fro transportation from Colony to RGTPP (inside Plant) or to any other place as per requirement with all manpower, tools and tackles etc. III. Control, Operation & maintenance of all the equipments like (Motors & Pumps), installed in Sewage Treatment Plant. IV. Quarterly servicing of Sand & carbon filters as per requirement. The material required, if any for servicing of filters i.e. sand, silica, gravel & activated carbon will have to be arranged by the firm. However complete media change (as per requirement) shall be in the scope of HPGCL. V. Monitoring the parameters of STP and daily update of data to Engineer-in-charge. for this purpose Proper Record and Log Book of the STP has to be maintained by the Contractor. VI. Housekeeping for maintaining Hygiene at site and surrounding STP of 30 KLD in Plant Area and 400 KLD capacities Sewage Treatment Plant during operation. VII. Contractor should ensure proper & timely maintenance of STP which will be carried out by Skilled & Qualified Mechanic/Supervisor. VIII. Mixing of chemical seeding nutrients to maintain required PH. All the consumables like lubricant, fuel, chemicals like Ferric Alum, Ferric Chloride, Aluminum Chloride, Chlorine etc. will arranged well in advance by the contractor at his own expenses to maintain desired parameters. IX. Cleaning of sludge from treated sewage pump/holding pond, septic tanks, pits and neutralization pit and draining/ cleaning of all sludge, muck etc. (sludge in semi liquid form ) in working like manner with all safety equipment, Labour etc. X. Dewatering the water in tanks of STP with pump XI. Disposal of sludge within RGTPP Colony with contractor own transport including loading, unloading and taking all precautions including removal of floating material, if any including maintenance of disposal system of treated effluent provided by HPGCL as per the direction of the Engineer In Charge. XII. All required Tools &Tackles are to be maintained by the contractor at his own cost. XIII. The contractor will be responsible for upkeep & custody of all the equipments/components of the STP Plant. Any loss due to the negligence or inaction of the contractor or his employee of any kind will be recovered from the contractor. XIV. Spares, if required will be provided by HPGCL. However, all the consumables required for completion of satisfactory job will have to provided by the contractor. XV. The contractor has to adopt all safety precautions and has to fulfill all the statutory requirements as required under the Factories Act, ISO standards, HSPCB and CPCB norms and other Goverment norms etc. The contractor shall also ensure compliance of relevant Labour Laws like EPF Act, Workmen’s Compensation Act., Payment of Wages Act, Minimum Wages Act, Industrial Disputes Act etc. XVI. Firm shall ensure availability of mobile with sim with operator (s) who is/are on duty at site (s) so that they can be contacted by authorities telephonically.
TANUJ AGARWAL CONTRACTOR
SHREE RAM ENTERPRISES
VARUN BANSAL
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .