Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
Tender Value
₹15 L
EMD Value
₹15,000
Closing Date
30 Nov 2023, 2:00 pmClosed
SE/TANGEDCO/CHENGALPATTU
130,GST Road, Chengalpattu.
Works Contract for Electrical mtc and erection work
2023_EB_390563_1
WC.No.44/dt 18.11.2023 works contract
Open Tender
Electrical and Maintenance Works
Works
365 days
SE/TANGEDCO/CHENGALPATTU
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Yes
₹15,000
Yes
11 Jan 2024
18 Nov 2023
1 Dec 2023
18 Nov 2023
30 Nov 2023
18 Nov 2023
18 Nov 2023 - 30 Nov 2023
Amount
Excavation of Pole pit of size 2'x2'x1/6 of the height of the pole upto 8 mtr pole by using JCB or Manual
Excavation of pit in Hard soil (common to all size of poles)
Excavation of pit in Rocky area (common to all size of poles) by blasting /Manual
Excavation of Stay pit 2'x2'x5' depth by using JCB or manual
Excavation of Stay pit 2'x2'x5' depth in hard rock soil
Erection of RCC poles/PSC poles/Metal poles up to 8.00 M (27' ) by using JCB or manual
Erection of RCC poles/PSC poles/Metal poles above 9.00 M by using JCB or maual
Erection of stay set complete with fixing up stay wire EYE, bow, Guy shackle, Binding etc.,
Erection of stay set complete in the rock area by blasting
Fixing of HT "V" cross arms(all types) / channel cross arms/guarding Cross arms
Fixing of LT 3 phase cross arms
Fixing of LT Single phase cross arms
Fixing of HT/LT TI Fittings
Fixing of HT pin Insulators 11 KV/ 22 KV/ 33 KV
Fixing of HT 11 KV strain disc.
Fixing of HT 22 KV/33 KV strain disc.
Fixing of LT pin Insulator
Fixing of LT shackle
Fixing of Aluminium Knob
Earthing of pole with pin including looping binding and burying
Fixing of top channel 10' centre/15' centre
Fixing of centre support for bed channel
Fixing of belting angle
Erection of 11 KV AB Switch
Erection of 11 KV Vertical type AB Switch for single pole DT
Erection of 11 KV HG Fuse set
Erection of 11 KV Solid core HG Fuse set
Feeder arrangements with open type fuse units
Fixing of HT LAS
Fixing of LT LAS
HT Jumpering complete for Transformer DT Structure
HT Jumpering complete for DP Structure
Fixing of cross bracing(4 nos angles) 10' Centre/15' centre
Fixing of LT Cable arrangements while erecting single pole DT
Fixing of Earth coller for earth pits
Erection of Aluminium bus bar pipe complete for HT bus bar arrangements for DP structure
Fixing of support insulator angle and erection of 3 nos Pin insulator
Paving and stringing of conductors of sizes upto 7/2.59 mm ACSR or other equivalent conductor
Paving and stringing of conductors of sizes upto 7/3.35mm ACSR or other equivalent conductor
Paving and stringing of conductors of 7/4.09mm ACSR or other equivalent conductor
Paving and stringing of conductors of 7/4.72 mm Dog Conductor or other equivalent conductor
Releasing and reerection (resagging) of one run of all sizes of conductor
Numbering of pole by using Enamel paint including cost of paint and painting charges (Numbering in black letters with yellow base by using stencils/skilled painters. The height of lettering shall be 40
Painting of poles and all other metal parts while erecting D.P. Structure brush and paint supplied by the contractor
Painting of pole and all other metal parts while erecting new single pole distribution transformer Structure (brush and paint supplied by the contractor)
Service connection details painting
Structure Concreting , Concreting of poles with size (2'x2'x5') including cost of Cement ,20 mm jelly and Sand with a mixture of 1:2:4 and plastering of concrete with ratio 1:2
Sleeve concreting with size (2'x2'x3') including cost of excavation Cement ,40 mm jelly and Sand with a mixture of 1:3:6 and plastering of concrete with ratio 1:2 including materials
Stay concreting of Stay with Size 1.5' X 1.5' X 3.0' including cost of Cement, 40mm Jelly and sand (with supply) with mixture 1:3:6 along sleeve concreting and plastering of concrete portion above
Erection of Double Pole Transformer Structure complete as per TNEB standard Erection of Top channel,Bed Channel, Structure Materials ,HG fUSE UNIT,LAS HT/LT , Belting Angle, AB Switch,Jumbering works stay erection work ,stay concreting ,pole concreting, tapping channel , all materials including painting, feeders arrangement, colour washing of RCC poles etc.,
Erection of Single Pole Transformer Structure complete as per TNEB standard Erection of Top channel,Bed Channel, Structure Materials ,HG fUSE UNIT,LAS HT/LT , Belting Angle, AB Switch,Jumbering works stay erection work ,stay concreting ,pole concreting, tapping channel , Earthing of structure including pit arrangements all materials including painting, feeders arrangement, colour washing of RCC poles etc.,
(iv) Erection of 11 KV Single pole DP structure with stay as per TNEB Standard including fixing of top channel, cross bracing concreting, painting, colour washing etc., with single earth
Erection of Distribution Transformer including loading of Distribution Transformer at stores and erection at structure or vice versa (i) Above 25 KVA to 100 KVA
(ii) 250-500 KVA and above
(iii) Failed DT replacement below 100 KVA
(iv) Failed DT replacement 100 KVA and above
Replacing the corroded earth pipes of transformer structure and replacing the earth wire completely with aluminium lugs for termination
Replacement of corroded earth pipe
Loading or unloading of Distribution Transformer (i) Upto 100 KVA
(ii) Above 100 KVA and upto 500 KVA
(iii) Metering set of all ratios
Loading or unloading of various sizes of poles(i) RCC, PSC pole upto 8.00 m length
(ii) All REC, RCC pole above 8.00 m length
(iii) Metal poles all sizes
Loading of Conductor
Unloading of Conductor
Loading / Unloading of Iron & Steel
Loading / Unloading of Oil
Loading / Unloading of line materials
Loading / Unloading of 11 KV strain disc
Loading / Unloading of LT Pin insulator shackle, guy shackle, LT Pin, Metal parts, HT pin etc.,
Loading / Unloading of single phase meters
Loading / Unloading of three phase meters
Loading and Stacking of Materials
Transportation of all types and sizes of poles and other associated materials from Road side to pole pit and vice versa upto 0.50 KM
Transportation of all type of poles by bullock cart or other vehicle (for all sizes of poles including loading and unloading) (i) For a lead upto 5 KM
(ii) Above 5 KM of lead of every KM
Transporting of conductors of all sizes from road side to pit locations upto one KM of Conductor
(i) Transporting of Distribution Transformer / Line materials from stores to office / site upto 10 KM distance by engaging 1 Ton capacity Minidor (Lorry)
Breaking and Releasing of grills from RCCPSC poles
Erection of concrete earth tub to Distribution Transformer earth pipe
Dismantling of detoriated cables/Replacement of various size(95,120,185 Sq.mm) from Distribution Transformer LT bushing to LT open type clamp and provision of suitable lugs at both the ends.
b)Above 8Kms per km
Releasing of ACSR/AAAC conductors from conductor drum and coiling ACSR 7/3.35, 7/2.59, AAAC 7/2.50, 7/3.15 MM (Per/Km.)
Renewal of jumper from 22/11 KV line to AB switch to HG Fuse, HG Fuse to Distn. Transformer with PG clamps.
Cutting of coconut leaves /tree branches
Drilling of hole in channel only 3/4" & 1" per hole
Cutting of flat
Cutting of channel
Cutting of Angle
Cutting of pipe
RSJ pole cutting
RSJ pole welding
Providing of line spacers for single phase line
Providing of line spacers for three phase line
Hiring Charges for JCB
Clearing of Jungle
Set right of all sizes of leaning of poles
Erection of LT Shunt Capacitor
Ground patrolling of HT lines during Breakdown
Rectification of snapped HT line during Break down
Rectification of snapped LT line during Break down
Replacement of Clamps of all sizes in Substation
Replacement of Jumpers less than 1 metre
Replacement of Jumpers more than 1 metre
Dismantling charges Dismantling of RCC, REC, PSC & metal pole of all sizes including the closing of the pit
For breaking the mass concrete of all supports
Dismantling of stay set complete (i) including stay rod
(ii) Without stay rod
Dismantling of conductor of upto 7/3.35 including transporting the conductors to the nearest road side and stocking in coils
Dismantling of conductor of above 7/3.35 including transporting the conductors to the nearest road side and stocking in coils
Dismantling of Transformer structure materials complete set and transporting the same from the location to the road side
Dismantling of Cross arm clamps TI fitting hardwares, insulators etc.,
Loading and unloading of HT Cable including coiling and recoiling
Transport of 11 KV HT cable from departmental stores to work spot by engaging private vehicle upto 5 km
Transport of 11 KV HT cable from departmental stores to work spot by engaging private vehicle above 5 km
Excavation of cable trench 0.6 meters width and 1.2 meters depth including cost of providing sign boards, danger lights indication arrangements wherever necessary all lead,lift, labour and tools
Tar Road
Concrete Road
LAYING OF HT CABLE Laying of 11 KV 3X300 sq mm XLPE cable
Laying of 11 KV 3X120 sq mm XLPE cable
Laying of 33 KV 3X400 sq mm XLPE cable
Laying of 33 KV 1X630 sq mm XLPE cable
Covering HT cable by cement "V" trough after covering the cable with good loose earth including loading, unloading and transport from stores to site and letter painting of feeding details & Cable
Refilling with excavated earth layers well consolidated as per std specification including all materials, lead, lift etc., complete.
Transport back any balance cable, empty drums and other materials if any by engaging private vehicle including recoiling, coiling and loading and unloading at both sides from workspot to store
Transport back any balance cable, empty drums and other materials if any by engaging private vehicle including recoiling, coiling and loading and unloading at both sides from workspot to store
Loading and unloading of LT Cable including coiling and recoiling
Transport of LT cable from departmental stores to work spot by engaging private vehicle upto 5 km
Transport of LT cable from departmental stores to work spot by engaging private vehicle above 5 km
Excavation of cable trench 45 cm width and 75 cm depth including cost of providing sign boards, danger lights, indication arrangements wherever necessary, lead, lift, labour and tools and
Tar Road
Concrete Road
Laying of LT Cables Laying of 4 X 240 sq.mm cable
Laying of 4 X 120 sq.mm XPLE cable
Laying of 4 X 25 sq.mm cable
Laying of 2 X 16 sq.mm cable
Refilling with excavated earth layers well consolidated as per std specification including all materials, lead, lift etc., complete.
Trenchless cable laying (New/Rectification) Laying of HT UG Cable using Trenchless technique without pipes
Erection of pillar box including excavation of foundation pits as per standard specification 2 Nos pillar concrete walls, coping and earthing the pillars below ground level 1 feet and above 2 feet/3
4/6/8 way pillar box 3 feet
4/6/8 way pillar box 4 feet
LT Cable fault rectification works Earth Work Exacavation to the (Cable Route) required depth, width
Concrete
Laying of LT Cable Laying of 4 X 240 sq.mm cable
Laying of 4 X 120 sq.mm XPLE cable
Laying of 4 X 25 sq.mm cable
Laying of 2 X 16 sq.mm cable
Refilling the trench cable
Transport of all materials to attending the fault from office to site and site to office vice versa
Provision of joint 240/120 Sq mm
1. HT Cable fault rectification works 2. ATTENDING TO FAULTS IN 11KV & 33KV CABLES BY DOING IT MANUALLY
Concrete
33 KV 1 X 630 sqmm
33 KV 3 X 630 sqmm & 3X 400 sqmm
Installation of terminations by employing private jointer in the absence of company jointer 33 KV 1x630 sqmm Indoor/Outdoor terminations
Installation of terminations by employing private jointer in the absence of company jointer 33 KV 3x400/3x630 sqmm Indoor/Outdoor terminations
Refilling with M- sand over the cable and jointscost of M- sand PWD Schedule of Rate 11 KV
Refilling labour charges /mtr (As per PWLC Rate) 11 KV
Transporting of cables and joint kits from stores to site 11 KV
Transporting of cables and joint kits from office to site 11 KV
Engaging JCB For Excavation of Earth and Back filling the earth after rectification of fault 11KV
Engaging JCB For Excavation of Earth and Back filling the earth after rectification of fault 11 kv
Engaging JCB For Excavation of Earth and Back filling the earth after rectification of fault 33 KV
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .