Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.1 LAccepted-Finance | ₹4.1 L | 1 | Accepted-Finance Admitted |
| Sl No | Description | Qty | Unit | MARIUS LYNGSHING L1 |
|---|---|---|---|---|
| 1.00Carriage of materials by Mechanical Transport including loading, unloading and stacking : | ||||
| 1.01 | Disposal of moorum/building rubbish/ malba/ similar unserviceable, dismantled or waste material by mechanical transport including loading, transporting, unloading to approved municipal dumping ground for lead upto 10 km for all lifts, complete as per directions of Engineer-in-charge. Note - item to be applicable in urban areas having directions for restricted hours for movement/ plying of load carrying motor vehicle of 3.5 cum or more. | 24 | One Cubic Metre | 691.6 ₹16,598.4 Lowest |
| 2.00Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth, lead up to 50m and lift up to 1.5m,as directed by Engineer-in-Charge. | ||||
| 2.01 | All kinds of soil | 38 | One Cubic Metre | 247.8 ₹9,416.4 Lowest |
| 3.00Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : | ||||
| 3.01 | 1:2:4 (1 cement : 2 coarse sand(zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 2 | One Cubic Metre | 11,029.2 ₹22,058.4 Lowest |
| 3.02 | 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources). | 2 | One Cubic Metre | 9,536.8 ₹19,073.6 Lowest |
| 4.00Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level with : | ||||
| 4.01 | Cement mortar 1:6 (1 cement : 6 coarse sand). | 20 | One Cubic Metre | 10,235.4 ₹2,04,708 Lowest |
| 5.00 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 135 | One Kilogram | 187.18 ₹25,269.3 Lowest |
Tender Value
₹3.7 L
EMD Value
₹7,310
Closing Date
9 Sept 2026, 6:00 pmClosed
EE Civil Shillong
EE Civil Division, BSNL, Shillong
Re-construction of collapsed retaining wall with RR masonry Dwarf wall and stone pitching at Nongpoh (Opp. Government Circuit House), Ribhoi District, Meghalaya.2026-2027.
2026_BSNL_289695_1
23/BSNL/CD/SH/2026-27
Open Tender
Civil Works
Item Rate
Shillong
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
Accounts Officer (Cash), BSNL, O/o GMTD, Meghalaya
₹7,310
11 Sept 2026
2 Sept 2026
11 Sept 2026
2 Sept 2026
9 Sept 2026
2 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Carriage of materials by Mechanical Transport including loading, unloading and stacking : | |||||
| 1.01 | Disposal of moorum/building rubbish/ malba/ similar unserviceable, dismantled or waste material by mechanical transport including loading, transporting, unloading to approved municipal dumping ground for lead upto 10 km for all lifts, complete as per directions of Engineer-in-charge. Note - item to be applicable in urban areas having directions for restricted hours for movement/ plying of load carrying motor vehicle of 3.5 cum or more. | - | One Cubic Metre | - | - |
| 2Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth, lead up to 50m and lift up to 1.5m,as directed by Engineer-in-Charge. | |||||
| 2.01 | All kinds of soil | - | One Cubic Metre | - | - |
| 3Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : | |||||
| 3.01 | 1:2:4 (1 cement : 2 coarse sand(zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | - | One Cubic Metre | - | - |
| 3.02 | 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources). | - | One Cubic Metre | - | - |
| 4Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level with : | |||||
| 4.01 | Cement mortar 1:6 (1 cement : 6 coarse sand). | - | One Cubic Metre | - | - |
| 5Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | |||||
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.52 MB
FulleNIT23.pdf
Tender Documents • 1.17 MB
BOQ_337931.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .