| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.1 LAccepted-AOC 0 SHANKERPURI COLONY SAHARANPUR BEHAT ROAD NEAR DEHAT KOTWALI SAHARANPUR UTTAR PRADESH 247001 | SAHARANPUR | UTTAR PRADESH | 247001 | ₹5.1 L Quoted ₹3.7 L | L1 | Accepted-AOC TC recommendation |
| 2 | L2₹4.3 L+₹55,117.80 (14.9%)Rejected-Finance 100 33 1 R G S ROAD USHAGRAM SALANPUR 713303 WEST BENGAL INDIA | ASANSOL | PASCHIM BARDHAMAN | WEST BENGAL | 713303 | ₹4.3 L+₹55,117.80 (14.9%) | L2 | Rejected-Finance TC recommendation |
| 3 | L3₹4.7 L+₹1.0 L (27.2%)Rejected-Finance 4 DALURBANDH PANDAVESWAR PANDAVESWAR BARDHAMAN WEST BENGAL 713346 UDYAM WB 03 0006114 | PASCHIM BARDHAMAN | WEST BENGAL | 713346 | ₹4.7 L+₹1.0 L (27.2%) | L3 | Rejected-Finance TC recommendation |
Tender Value
₹3.6 L
EMD Value
₹4,600
Closing Date
25 Dec 2023, 6:00 pmClosed
General Manager Bankola Area
Office of The General Manager Bankola Area, PIN-713363
Complete conversion of 11KV by 550 V , 550KVA Power transformer to 3.3KV by 550V Power Transformer to 3.3KV by 550V Power transformer installation and commissioning of CM Project at Nakrakonda Kumardihi B Colliery under Bankola Area.
2023_ECL_296100_1
ECL/GM/BA/E TENDER/23-24/EnM/189 Dt. 14.12.2023
Open Tender
Electrical and Maintenance Works
Item Rate
30 days
Nakrakonda Kumardihi B Colliery
Please refer to NIT document
5 documents required · 5 mandatory
₹4,600
7 May 2024
14 Dec 2023
26 Dec 2023
14 Dec 2023
25 Dec 2023
14 Dec 2023
14 Dec 2023 - 18 Dec 2023
Amount
Item Description/ Heading
Dismantling of core & winding fro transformer tank to drain out of transformer oil , opening of top cover etc
Cost of copper conductor for primary coil
Cost of TPC ( Tripple paper covering ) for Bore copper conductor
cleaning of old insulation of secondary coil such as manila paper , pre compressed board etc and carbon particles total 3 limbs =60KGX 3=180KG
Cost of re insulation of existing bare copper strip of 3 no secondary coils
Cost of insulation materials cotton tape glass tape , pacement paper , synthetic cork sheet nomex paper etc .
Cost of DA oxygen brazing rod
Cost of neoprene synthetic gasket at top cover and inspection cover
Dehydration & filteration of transformer oil to rise the di electric strength of oil up to required value.
Cost of primary terminal bushing with current carrying contacts
Design charges of above transformer from 11KV/550V to 3.3KV/550V
Supply & fixing of tap charger switch including mechanism arrangement & alignment
Installation of 500KVA 3.3KV/550V Transformer at site which included placement of transformer pre commissioning testing & engine details of pre commissioning testing of transformer i)isulation resistence test 2) High voltage pressure test 3) vector group test 4) Magnetic blance test 5) Voltage ratio on all tap position 6) di electric strength of transformer oil.
Cost of painting charges of the above transformer by one coat of primary paint & two coat of metalic paint .
Transportation charges both side up & dowen
Total impact of GST for the purpose of CTC
ELECTRO POWER INDUSTRIES
MAZUMDER ELECTRICAL
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .