| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.2 LAccepted-AOC | ₹27.2 L Quoted ₹27.8 L | L1 | Accepted-AOC Being L1 |
| 2 | L2₹29.1 L+₹1.3 L (4.70%)Rejected-Finance | ₹29.1 L+₹1.3 L (4.70%) | L2 | Rejected-Finance Being Not L1 |
| 3 | L3₹29.3 L+₹1.5 L (5.41%)Rejected-Finance SR NO 331 2B PLOT NO 43 R H NO 02 BALDEWA RAO BUNGLOW NEWA NMC WATER TANK PATHARDI SHIVAR NASHIK 422 009 INDEX NO E 84CWE AF LOHEGAON PUNE | NASHIK | MAHARASHTRA | 422009 | ₹29.3 L+₹1.5 L (5.41%) | L3 | Rejected-Finance Being Not L1 |
| 4 | L4₹29.9 L+₹2.1 L (7.59%)Rejected-Finance | ₹29.9 L+₹2.1 L (7.59%) | L4 | Rejected-Finance Being Not L1 |
| 5 | L5₹34.2 L+₹6.4 L (23.2%)Rejected-Finance | ₹34.2 L+₹6.4 L (23.2%) | L5 | Rejected-Finance Being Not L1 |
Tender Value
₹40 L
EMD Value
₹80,000
Closing Date
25 Nov 2023, 6:00 pmClosed
GE AF OJHAR
GE AF OJHAR
REPAIR MAINT OF CENTRAL AIR CONDITIONING PLANT INCLUDING REFGERANT GAS AT AIR FORCE STATION OJHAR
2023_MES_606736_2
8119/E8
Open Tender
Electrical and Maintenance Works
Item Rate
335 days
OJHAR
As per tender documents
8 documents required · 8 mandatory
₹500
GE AF OJHAR
₹80,000
Yes
23 Jan 2024
10 Nov 2023
27 Nov 2023
11 Nov 2023
25 Nov 2023
13 Nov 2023
Amount
Comprehensive Maintenance of Water Cooled Chillar water central air conditioning plant of capacity 300 TR (2 x 150 TR Working + 1x 150 TR Stanby) at Bldg No. RSDL Old P-360 =01 No comprising of following equipment, complete all as specified and directed by Engineer-in-Charge. inspection of machine, checking pressure, checking controls, checking control wiring including carring out requisite setting of out door unit controller & contactor, checking all pressure temperature interlocks & setting them for satisfactory running of plant complete all as specied and as directed a) Chillar unit Make-Voltas = 03 Sets (b) Compressor suitable for 2X150 TR - 03 Sets c) Condensar Unit Make Voltas =03 Sets d) Chillar water pump set back pull out type monoblock -3 Nos. e) Condenser water pump set back pull out type monoblock -3 Nos. g) Cooling tower round shape induced draft type ,direct driven propelar fan motor , fan dia meter 1500 mm,srpay nozzle arrngement with HDPE water tank -01No. h) Electrical control panel cubical type with multi funtion display unit, MCBs, Fuse,MPD with auxilary contactor etc. complete -03 Nos. j) Motor control centre cum APFC Electrical LT panel cubical type floor mounted with MCCB,MPCB,Push botton , Flash pattern voltmeter, Ammeter, ,SFU with ROH,APFC relay with contractor ,multi function meter etc. complete-01 No. k) LT panel for PAC unit, cubical type floor mounted with MCCB, MCB,Push botton , Flash pattern voltmeter, Ammeter,contractor , etc. complete- 02 Nos. l) Control devices such as thermostatic expansion valve,solenoid valve and cooling thermostatic & humidity contorl switch -03 Set m) Chilled water/ Condenser/cooling tower MS/GI piping up to 150mm dia with valves pressure gauge temperature gauge complete-01Set (ii) Contractor shall carry periodical maintenance of above mentioned equipment by providing minor servicing like greasing of bearings, replacement of glands, MS Nuts & bolts, rubber , coupling, teflon tape, insulation tape & other minor spares including cleaning of AHU filters , further cost of minor repairing & joints of pipe line is deemed to be included in quoted rate. Add Note for all CA items- (a) Contractor rep/ supervisor shall be present at office of Engineer-In-Charge at 9AM every day for taking of instruction regarding repairsto be carried out on the day on priority including Sunday/Holiday (b) Complaints/Defects will be rectified within 8 Hrs of intimate time. If complaints not rectified, a recovery of an amount of Rs 1500/-/ complains/day will be recovered from the RAR/FB, ii) Rates are inclusive of T&P required safety equipment, and transport required contractor shall arrange on his own arrangement, iii) Complaint given by any electronic media i.e SMS, email or whatsapp etc and in writing shall be count as valid compliant contractor to take immediate action within stipulated time as mention in note.
Comprehensive maintenance of water cooled chillar water central air conditioning plant of capacity 300 TR (2 x 150 TR Working + 1x 150 TR Stanby) at Bldg No. RSDL New P-284 = 01 No, Make-Voltas, comprising of following equipment, complete all as specified and directed by Engineer-in-Charge. inspection of machine, checking pressure, checking controls, checking control wiring including carring out requisite setting of out door unit controller & contactor, checking all pressure temperature interlocks & setting them for satisfactory running of plant complete all as specied and as directed a) Chillar unit Make-Voltas = 03 Sets (b)Compressor suitable for 2X150 TR - 03 Sets c) Condensar Unit Make Voltas =03 Sets d) Chillar water pump set back pull out type monoblock -3 Nos. e) Condenser water pump set back pull out type monoblock -3 Nos. g) Cooling tower round shape induced draft type ,direct driven propelar fan motor , fan dia meter 1500 mm,srpay nozzle arrngement with HDPE water tank -02No. h) Electrical control panel cubical type with multi funtion display unit, MCBs, Fuse,MPD with auxilary contactor etc. complete -03 Nos. j) Motor control centre cum APFC Electrical LT panel cubical type floor mounted with MCCB,MPCB,Push botton , Flash pattern voltmeter, Ammeter, ,SFU with ROH,APFC relay with contractor ,multi function meter etc. complete-01 No. k) LT panel for PAC unit, cubical type floor mounted with MCCB, MCB,Push botton , Flash pattern voltmeter, Ammeter,contractor , etc. complete- 02 Nos. l) Control devices such as thermostatic expansion valve,solenoid valve and cooling thermostatic & humidity contorl switch -03 Set m) Chilled water/ Condenser/cooling tower MS/GI piping up to 150mm dia with valves pressure gauge temperature gauge complete-01Set (ii) Contractor shall carry periodical maintenance of above mentioned equipment by providing minor servicing like greasing of bearings, replacement of glands, MS Nuts & bolts, rubber , coupling, teflon tape, insulation tape & other minor spares including cleaning of AHU filters , further cost of minor repairing & joints of pipe line is deemed to be included in quoted rate.
Comprehensive maintenance of water cooled chillar water central air conditioning plant of capacity 100 TR (2 x 50 TR Working ) of Make : Voltas at Bldg No. RSDM P-52 comprising of following equipment complete all as specified and directed by Engineer-in-Charge. inspection of machine, checking pressure, checking controls, checking control wiring including carring out requisite setting of out door unit controller & contactor, checking all pressure temperature interlocks & setting them for satisfactory running of plant complete all as specied and as directed a) Chillar unit Make-Voltas = 02 Sets (b)Compressor suitable for 2X50 TR ,415 V ,50 HZ, - 03 Sets c) Condensar Unit Make Voltas =02 Sets d) Chillar water pump set back pull out type monoblock -3 Nos. e) Condenser water pump set back pull out type monoblock -3 Nos. g) Cooling tower round shape induced draft type water flow rate 400 US GPM,direct driven propelar fan motor of cap 5 HP, fan dia meter 1500 mm,srpay nozzle arrngement with HDPE water tank Make-Mihir -01No. h) Electrical control panel cubical type with multi funtion display unit, MCBs, Fuse,MPD with auxilary contactor etc. complete -03 Nos. j) Motor control centre cum APFC Electrical LT panel cubical type floor mounted with MCCB,MPCB,Push botton , Flash pattern voltmeter, Ammeter, ,SFU with ROH,APFC relay with contractor ,multi function meter etc. complete-01 No. k) LT panel for PAC unit, cubical type floor mounted with MCCB, MCB,Push botton , Flash pattern voltmeter, Ammeter,contractor , etc. complete- 02 Nos. l) Control devices such as thermostatic expansion valve,solenoid valve and cooling thermostatic & humidity contorl switch -03 Set m) Chilled water/ Condenser/cooling tower MS/GI piping up to 150mm dia with valves pressure gauge temperature gauge complete-01Set (ii) Contractor shall carry periodical maintenance of above mentioned equipment by providing minor servicing like greasing of bearings, replacement of glands, MS Nuts & bolts, rubber , coupling, teflon tape, insulation tape & other minor spares including cleaning of AHU filters , further cost of minor repairing of valves & joints of pipe line is deemed to be included in quoted rate.
Comprehensive maintenance of Air Conditioning plant 3x 8.25 TR at Signal section Bldg No. P-64 of Make Voltas including chiller unit, condenser unit, .(02 Running+01 Standby),inspection of machine, checking pressure, checking controls, checking control wiring and rectification of all mentioned, carring out requisite setting of out door unit controller & contactor, checking all pressure temperature interlocks & setting them for satisfactory running of plant complete all as specied and as directed
Comprehensive maintenance of central AC plant of Air cooled capacity 6 x 8.75 TR at ASD-30 Bldg No.P-51 of Make Voltas,Model no:-SC875DGR407 connected to AHU with 2 circuit of 03 nos of out door unit each, inspection of machine, checking pressure, checking controls, checking control wiring and rectification of all mentioned, carring out requisite setting of out door unit controller & contactor, checking all pressure temperature interlocks & setting them for satisfactory running of plant complete all as specied and as directed. Note for items no. 1 to 5: Quoted rate deemed to be include with cost of following : (a) Complete maintenance and Inspection by responsible qualified and trained staff in order to keep all the euipment inservisible condition to achieve desired parameter inside the air conditional space. (b) To carry out the periodical maitenace of AC plant if necessary for effective functioning. (c) The contractor shall be responsible for proper functioning of all electrical/mechanical equipment and maintain the same in sound working condition to aviod the accident and breakdown (d) Routine checks necessary for satisfactory running the above plant and cooling tower complete all as diected by Engineer-in-charge. (e) Topping up of gas in case of leakage,compressor oil refill,descaling,repair to compressor, Condensor, motor,pump electrical panel,water supply valves,leakage,leaking refrigerant valves etc (f) To attend the breakdown during day and night including holiday and putting the plant in working condition in shortest possible time and including suffiecient stock of spares avilable always to insure smooth and regular functioning of AC plant .The contractor shall required to keep their own T&P to attend the fault/break down in quick succession.
Comprehensive maintenance of VRF/ VRV system Type Air conditioners ( Make LG) with connected AHU/ indoor units by deploying Original Equipment Manufacturer (OEM) trained & experienced Engineer/Technical staff for the following equipment located at various buildings at AFLE BUILDING Area in HAL Factory premises including testing electrical connections to inspect the operation of VRF type Air conditioners with connected AHU/ Indoor units and carring out preventive maintenance as per standard practice or as per OEM recommendations, To carry out the periodical maitenace of VRF AC plant for effective functioning.and carrying out repair to defective components/ equipment, detection of leaks & rectifying the same, charging/topping up of refrigerant gas complete all as specified and directed.The contractor shall be responsible for proper functioning of all electrical/mechanical equipment and maintain the same in sound working condition to aviod the accident and breakdown. Routine checks necessary for satisfactory running the above plant complete all as diected by Engineer-in-charge. The contractor has tp attend the breakdown during day and night including holiday and putting the plant in working condition in shortest possible time and including suffiecient stock of spares avilable always to insure smooth and regular functioning of AC plant 1. VRF Typer AC Plant 3 x 14 HP = Total 42 HP 2. VRF Typer AC Plant 1 x 16 HP = Total 16 HP 3. VRF Typer AC Plant 1 x 20 HP = Total 20 HP .Note for items no.5:- Spares for items should be measured and paid under relevent CA items
Supply, installation, testing & commissioning in repairs of Outdoor VRF Unit Compressor set (Korea) for 20 HP capacity VRF Unit . Make: LG or equivalent including connecting with existing refrigerant pipe line, integral refrigerant piping and wiring accessories all as required and directed by Engr-in -Charge,
Supply, installation, testing & commissioning in repairs of Outdoor VRF Unit Compressor set (Korea) for 16 HP capacity VRF Unit. Make: LG or equivalent including connecting with existing refrigerant pipe line, integral refrigerant piping and wiring accessories all as required and directed by Engr-in -Charge,
Supply, installation, testing & commissioning in repairs of Outdoor VRF Unit Compressor set (Korea) for 14 HP capacity VRF Unit. Make: LG or equivalent including connecting with existing refrigerant pipe line, integral refrigerant piping and wiring accessories all as required and directed by Engr-in -Charge,
Supply, installation, testing & commissioning in repairs of water cooled scroll type compressor 8.75 TR Make -Danfoss or Equivalent of semi hermatically sealed scroll motor with internal overload protector, compressor mounted on existing base including connecting with existing refrigerant pipe line, integral refrigerant piping and wiring accessories all as required and directed by Engr-in -Charge,
Supply and fixing VRF inverter PCB Assembly for VRF Outdoor unit of capacity 20HP/16HP/14HP Make: LG or equivalent
Supply and fixing VRF Display PCB Assembly Cycle (H/W) for VRF Outdoor unit of capacity 20HP/16HP/14HP Make: LG or equivalent
Supply and fixing Outdoor DC Motor Assembly for VRF Outdoor unit of capacity 20HP/16HP/14HP Make: LG or equivalent
Supply and fixing Supply only Main PCB Assembly for VRF Outdoor unit of capacity 20HP/16HP/14HP Make: LG or equivalent
Supply and fixing Reactor Transformer for VRF Outdoor unit of capacity 20HP/16HP/14HP Make: LG or equivalent
Supply and fixing Fan PCB Assembly for VRF Outdoor unit of capacity 20HP/16HP/14HP Make: LG or equivalent
Supply and fixing Magnet Switch for VRF Outdoor unit of capacity 20HP/16HP/14HP Make: LG or equivalent
Supply and fixing NTC Thermistor Assembly, for VRF Outdoor unit of capacity 20HP/16HP/14HP Make: LG or equivalent
Supply and fixing Terminal Block Connector for VRF Outdoor unit of capacity 20HP/16HP/14HP Make: LG or equivalent
Supply and fixing Heat Sink for VRF Outdoor unit of capacity 20HP/16HP/14HP Make: LG or equivalent
Supply and fixing Pressure Sensor for VRF Outdoor unit of capacity 20HP/16HP/14HP Make: LG or equivalent
Supply and fixing Solenoid for VRF Outdoor unit of capacity 20HP/16HP/14HP Make: LG or equivalent
Supply and fixing Solenoid Valve for VRF Outdoor unit of capacity 20HP/16HP/14HP Make: LG or equivalent
Supply and fixing Expansion Coil for VRF Outdoor unit of capacity 20HP/16HP/14HP Make: LG or equivalent
Supply and fixing Expansion Body Valve for VRF Outdoor unit of capacity 20HP/16HP/14HP Make: LG or equivalent
Supply and fixing Propeller Fan Assembly, for VRF Outdoor unit of capacity 20HP/16HP/14HP Make: LG or equivalent
Supply and fixing Motor Cover Assembly for Hi-wall indoor unit of VRF unit of Capacity 1.30TR/1.50TR/2.00TR Make: LG or equivalent
Supply and fixing DC Motor Assembly for Hi-wall indoor unit of VRF unit of Capacity 1.30TR/1.50TR/2.00TR Make: LG or equivalent
Supply and fixing Manifold (Indoor) Tube Assembly for Hi-wall indoor unit of VRF unit of Capacity 1.30TR/1.50TR/2.00TR Make: LG or equivalent
Supply and fixing EvaporatorTube Assembly for Hi-wall indoor unit of VRF unit of Capacity 1.30TR/1.50TR/2.00TR Make: LG or equivalent
Supply and fixing Main PCB Assembly for Hi-wall indoor unit of VRF unit of Capacity 1.30TR/1.50TR/2.00TR Make: LG or equivalent
Supply and fixing Cross Flow Fan Assembly for Hi-wall indoor unit of VRF unit of Capacity 1.30TR/1.50TR/2.00TR Make: LG or equivalent
Supply and fixing NTC Thermistor for Hi-wall indoor unit of VRF unit of Capacity 1.30TR/1.50TR/2.00TR Make: LG or equivalent
Supply and fixing Thermistor Assembly for Hi-wall indoor unit of VRF unit of Capacity 1.30TR/1.50TR/2.00TR Make: LG or equivalent
Supply and fixing Deodorizing Filter for Hi-wall indoor unit of VRF unit of Capacity 1.30TR/1.50TR/2.00TR Make: LG or equivalent
Supply and fixing Turbo Fan Assembly for 4.0 TR capacity Cassette type indoor unit of VRF unit Make: LG or equivalent
Supply and fixing Expansion Tube Assembly for 4.0 TR capacity Cassette type indoor unit of VRF unit Make: LG or equivalent
Supply and fixing DC,Indoor Motor Assembly for 4.0 TR capacity Cassette type indoor unit of VRF unit Make: LG or equivalent
Supply and fixing water Pump Assembly for 4.0 TR capacity Cassette type indoor unit of VRF unit Make: LG or equivalent
Supply and fixing NTC Thermistor for 4.0 TR capacity Cassette type indoor unit of VRF unit Make: LG or equivalent
Supply and fixing Main PCB Assembly for 4.0 TR capacity Cassette type indoor unit of VRF unit Make: LG or equivalent
Supply and fixing Sub PCB Assembly for 4.0 TR capacity Cassette type indoor unit of VRF unit Make: LG or equivalent
Supply and fixing Terminal Block Connector for 4.0 TR capacity Cassette type indoor unit of VRF unit Make: LG or equivalent
Supply and fixing NTC Thermistor Assembly for 4.0 TR capacity Cassette type indoor unit of VRF unit Make: LG or equivalent
Material and labour for taking down indoor unit of VRF unit of any type/make/capacity after dismantling all electric connection from site (either in ground / any floor), transporting to work site if required, cleaning the condenser, brush cleaning the whole unit with electric blower, cleaning with water, decaling with acid on both side of cooling coil and components, refixing the covers and making electrical connections, installation the machine in same position, testing and commissioning complete all as specified and as directed by Engineer-in-Charge (Note: Repair/Replacement of the component required shall be paid under relevant item of schedule)
Material and labour for taking down Cassette type indoor unit of VRF unit of 4 TR capacity after dismantling all electric connection from site (either in ground / any floor), transporting to work site if required, cleaning the condenser, brush cleaning the whole unit with electric blower, cleaning with water, decaling with acid on both side of cooling coil and components, refixing the covers and making electrical connections, installation the machine in same position, testing and commissioning complete all as specified and as directed by Engineer-in-Charge (Note: Repair/Replacement of the component required shall be paid under relevant item of schedule)
Supply only Electronic Auto Sensor unit complete all as specified and directed by Engineer-in-Charge
Supply only High Pressure Cut Out sutable as per sample complete all as directed by Engineer-in-Charge
Supply only Low Pressure Cut Out sutable as per sample complete all as directed by Engineer-in-Charge
Supply only universal/Strainer filter cum dryier suitable for Chilled Water Plant as per site requirement complete all as directed by Engineer-in-Charge
Supply only old unservicable Pressure relief valve. 0 to 300 Psi Sutable as per sample complete all as directedby Engineer-in-Charge
Supply only catchall filters or any other for Liquid line, working pressure 500 PSI Suitable for R 407 C, R 134A, R 22 Gas including arragement for installation of filter if required
Supply and fix PVC frills (small size) in colums of size 60 x 30 x 15 cm or next higher size for 150 TR/100 TR/ 26 TR cooling Towers as per existing specification and requirement complete all as directed.
Supply only Ball / Roller bearing for Sprinlkler top and bottom Hub for 100 TR, 300 TR, 26 TR Plants Capacity complete all as directed.
Supply only MCCB, 3 Pole, 400 Amps, 50 KA, 440 Volts, 3 Phase, AC, 50 Hz, Adjustable type complete with Overload Protection, no-volt thermal based release complete all as specified and as directed.
Supply only MCCB, 3 Pole, 250 Amps, 36 KA, 440 Volts, 3 Phase, AC, 50 Hz, Adjustable type complete with Overload Protection, no-volt thermal based release complete all as specified and as directed.
Supply only MCCB, 3 Pole, 63 Amps, 16 KA, 440 Volts, 3 Phase, AC, 50 Hz, Adjustable type complete with Overload Protection, no-volt thermal based release complete all as specified and as directed.
Supply only MCCB, 3 Pole, 100 Amps, 25 KA, 440 Volts, 3 Phase, AC, 50 Hz, Adjustable type complete with Overload Protection, no-volt thermal based release complete all as specified and as directed.
Supply only MCCB, 4 Pole, 63 Amps, 25 KA, 440 Volts, 3 Phase, AC, 50 Hz, Adjustable type complete with Overload Protection, no-volt thermal based release complete all as specified and as directed.
Supply only MCCB, 3 Pole, 125 Amps, 25 KA, 440 Volts, 3 Phase, AC, 50 Hz, Adjustable type complete with Overload Protection, no-volt thermal based release complete all as specified and as directed.
Supply only Bimetallic over load relays of 4-6.5 Amps Make-L&T or equivalent in Siemens/ ABB
All as per item here-in-before but 6-10 Amps Make-L&T or equivalent in Siemens/ ABB
All as per item here-in-before but 10-16 Amps Make-L&T or equivalent in Siemens/ ABB
All as per item here-in-before but 13-21 Amps Make-L&T or equivalent in Siemens/ ABB
All as per item here-in-before but 20-32 Amps Make-L&T or equivalent in Siemens/ ABB
All as per item here-in-before but 28-42 Amps Make-L&T or equivalent in Siemens/ ABB
All as per item here-in-before but 66-110 Amps Make-L&T or equivalent in Siemens/ ABB
Supply only Timer for star-delta starter ST-100 0-120 of L&T or equivalent in BCH/Siemens as approved.
Supply only Single Phase Preventor for Electric motors 415 V as approved.
Supply only Contactor 3 phase AC 2 No,2NC for AC with coil voltage 240 Volts of following types (i) ML-1.5 Make-L&T or equivalent in Siemens/ ABB
All as per item here-in-before but for ML-2 Make-L&T or equivalent in Siemens/ ABB
All as per item here-in-before but for ML-3 Make-L&T or equivalent in Siemens/ ABB
All as per item here-in-before but for ML-4 Make-L&T or equivalent in Siemens/ ABB
All as per item here-in-before but for ML-6 Make L&T or equivalent in Siemens/ ABB
Supply only Power Contactor 4 Pole, Coil Voltage 220V/415V, MNX-A1 type complete all as specified and as directed. Make-L&T or equivalent
Supply only Power Contactor 3 Pole, Coil Voltage 220V/415V, MNX-70 type complete all as specified and as directed. Make-L&T or equivalent
Supply and Fix ADDON Block .2NO+2NC,AC. Make-L&T or equivalent
Supply and Fix CTS 10 Connector for Panel
Supply and fixing in replacement V belt of Make Fenner/Everest of size B/8 for AHU blower motor as approved and as directed by Engineer-in-Charge
All as per item here-in-before but of size B-72
All as per item here-in-before but of size B-73
All as per item here-in-before but of size B-78
All as per item here-in-before but of size B-83
All as per item here-in-before but of size B-84
All as per item here-in-before but of size B-92
All as per item here-in-before but of size B-96
All as per item here-in-before but of size B-97
All as per item here-in-before but of size B-98
All as per item here-in-before but of size B-89
All as per item here-in-before but of size B-93
All as per item here-in-before but of size B-105
All as per item here-in-before but of size B-104
All as per item here-in-before but of size B-146
All as per item here-in-before but of size A-31
Supply only Copper Tubing 2 mm thick and 10 mm dia (3/8")for additional length required for in process of maintenance, complete all as specified & as directed.
All as per item no 95 here-in-before but of size 12 mm dia (1/2")
All as per item no 95 here-in-before but of size 6 mm dia (1/4")
All as per item no 95 here-in-before but of size 16 mm dia (5/8")
Supply only in Repairs Tempreture Sensor complete wall/floor/roof mounted type complete all as per directed.
Supply only in Repairs Humidity Sensor of diffuser unit wall/floor mounted type complete all as per directed.
M&L for leak Repairing & Gas Charging of Central type Air conditioning Plant as below:- a) Reapairs in refrigeration systems leak of any by "O" Ring and Gland Packing ,services Valves / Oil seal b) Charging dry nitrogen & holding pressure for 24 hours c) Vacuuming with double stage Vacume pump of (-) 2Kg/cm2 vaccum pressure d) Charging R 407c, R134A, R22 Including top up the Compressor Oil and charging the gas at varios Plant all as specified and directed by Eng- in- charge. (i) Central Type AC. Plant (Chilled Water Systems) 3X150 TR at old RSDL and New RSDL Note:- Refregerant gas R407C, R134A, R22 & Compressor oil will be isued under separte items of this schedule.
All as per itm no 101 here-in-before but for Central Type AC. Plant (Chilled Water Systems) 2 X 50 TR of 1 Nos
All as per itm no 101 here-in-before but for Central Central Type AC. Plant (Chilled Water Systems) 3 X 8.25 TR of 1 Nos
All as per itm no 101 here-in-before but for Central Type AC. Plant (Air cooled Systems) 4 X 8.75+2 X 8.75 TR of 1 Nos
M&L for leak Repairing & Gas Charging of VRF type Air conditioning Plant as below:- a) Repairs in refrigeration systems leak of any by "O" Ring and Gland Packing ,services Valves / Oil seal b) Charging Dry nitrogen & holding pressure for 24 hours c) Vacuuming with double stage Vacume pump of (-) 2Kg/cm2 vaccum pressure d) Charging R 410 refrigerent gas Including top up the Compressor Oil and charging the gas at varios Plant all as specified and directed by Eng- in- charge. Note:- Refregerant gas R 410 & Compressor oil will be isued under separte items of this schedule.
Supply only Refrigerant R-134a of (enclosed in seamless steel cylinder, Note:The empty cylinder available with MES will be exchange) all as specified and directed by Engineer-in-Charge.
Supply only Refrigerant R- 22 of (enclosed in seamless steel cylinder, Note:The empty cylinder available with MES will be exchange) all as specified and directed by Engineer-in-Charge.
Supply only Refrigerant R- 407C of (enclosed in seamless steel cylinder, Note:The empty cylinder available with MES will be exchange) all as specified and directed by Engineer-in-Charge.
Supply only Refrigerant R- 410 of (enclosed in seamless steel cylinder, Note:The empty cylinder available with MES will be exchange) all as specified and directed by Engineer-in-Charge.
Supply only Nitrogen Gas complete all as specified and as directed.
Supply only VG 320 Gear Oil of Make : Servo Veedol /suitable for worm type gear box complete all as specified & directed
Supply only compressor Oil - Make -Servo or Equivalvent approved make including flushing/cleaning of oil chamber etc complete all as specified and directed by Engr-in-Charge
M&L for De-scaling the shell and tube type condensser of following plants by circulating de- scaling chemical through for 4/ 6 hours Opening the end cover of condenser and cleaning inner tube manually with the help of nylon / wire brush until complete scale to be removed and flush out with fresh water. Reassembling the end cover including replacment of gasket, nuts bolts ,washer etc., and testing complete all as directed by Eng.- in Charge. i) Central Type AC. Plant (Chilled Water Systems) 3X150 TR of 2 Nos
ii) Central Type AC. Plant (Chilled Water Systems) AT Bldg. 2X50 TR of 2 Nos
iii) Central Type AC. Plant (Chilled Water Systems) AT Bldg. 3X8.75 TR of 1 Nos
M & L for Taking down electric motor of 0.5 HP to 1 HP of blower/pump from the existing position after diconnecting from foundation bolts & cable connections, de-coupling from blower/pump and transporting to the same to work shop for repairs, opening the electric motor of any makes & model and re-winding with super enamelled copper winding wire of suitable gauge as per existing superior quality, insulating material after dismantling the motor separating starter, rotor, cleaning slots and stampings reassembling electic motor complete and packing suitable grade of lubricant, transporting motor back to the installation, fixing on the foundation, making proper allignment with blower, cleaning the body, frame and foundation with scraping the fallen paint rust etc. and applying two coats of synthetic enamel paint over one coat of primer after preparation of surface and writing MES No etc , complete all as specified & as directed, connecting up water and electric connections and making good disturbed surfaces of insulation, piping and painting to match with the original surfaces including painting and marking MES No etc. for capacity, complete all as specified & as directed. (Note for item No 116 to 157: Complaint should be attended within 24 ours failing which a penalty of 500/ complaint/ Hour will be recovered from contractor.)
All as per itm no 116 here-in-before but for Electric motor above 1.0 HP to 2 HP
All as per itm no 116 here-in-before but for Electric motor 3HP
All as per itm no 116 here-in-before but for Electric motor 5 HP
All as per itm no 116 here-in-before but for Electric motor 7.5 HP
All as per itm no 116 here-in-before but for Electric motor 10 HP
All as per itm no 116 here-in-before but for Electric motor 15 HP
All as per itm no 116 here-in-before but for Electric motor 25 HP
M&L for complete Repair/ Overhauling of Condenser/Chiller pumps of following capacity cleaning, Ciling, Greasing and Replacement of other worn out/unsv parts of pump if required complete including painting of pump by two coats of synthetic enamel paint reassembling of pump & testing to the satisfaction of Engineer in charge. i) Capacity - 15 HP Notes : (i) Supply of bearing and sleeve,repair to impeller will be measured and paid separetly under respective items.
All as per item no-124 above but 10 HP
All as per item no-124 above but 3 HP
Supply only Terminal Plate for 15 HP Pump
Supply only Terminal Plate for 10 HP Pump
Supply only Terminal Plate for 3 HP Pump
Supply only Shaft Bearing for 15Hp Pump
Supply only Shaft Bearing for 10Hp Pump
Supply only Shaft Bearing for 3Hp Pump
Repair to Rotor Shaft, rotor Key for 15 HP
Repair to Rotor Shaft, rotor Key for 10 HP
Repair to Rotor Shaft, rotor Key for 3 HP
Supply only Oil Seal for 15HP
Supply only Oil Seal for 10HP
Supply only Oil Seal for 3HP
Supply only Water Seal for 15HP
Supply only Water Seal for 10HP
Supply only Water Seal for 3HP
Material and labour Repair to motor End Cover and bearing housing repair,
Supply only Shaft sleeve of 15 HP pumpset
Supply only Impeller of 15 HP pumpset
Supply only Impeller Keys of 15 HP pumpset
Supply only Shaft sleeve of 10 HP pumpset
Supply only Impeller of 10 HP pumpset
Supply only Impeller Keys of 10 HP pumpset
Supply only Shaft sleeve of 3 HP pumpset
Supply only Impeller of 3 HP pumpset
Supply only Impeller Keys of 3 HP pumpset
M & L for Taking down the monoblock electric driven pump set of capacity 2 HP of any make from the position after diconnecting the water and electric connections & foundation bolts and transporting to the work shop for repairs, opening the pump set, cleaning the internal parts complete overhualing and painting a two coats of synthetic enamel paint over one coat of primer after preparation of surface, connecting up water and electric connections and making good disturbed surfaces of insulation, piping and painting to match with the original surfaces including painting and marking MES No etc. for capacity, complete all as specified & as directed.
All as per itm no -152 here-in-before but for Monoblock pump set 3 HP Electric motor
All as per itm no -152 here-in-before but for Monoblock pump set 5 HP Electric motor
All as per itm no -152 here-in-before but for Monoblock pump set 7.5 HP Electric motor
All as per itm no -152 here-in-before but for Monoblock pump set 10 HP Electric motor
All as per itm no -152 here-in-before but for Monoblock pump set 15 HP Electric motor
Material and labour for Painting of Chilled water A/C Plant 3x 150 TR installation complete, cooling tower, AHUs, water main supply & return chilled water pipes including cleaning the plant/equipment preparation of surface, removing all dirt, scale deposits and painting with two coats of synthetic enamel paint including marking all machinery with machine numbers and distempering on chilled water mains with oil bound distemper as per existing colour coding complete all as specified & as directed.
All as per item here-in-before but for Chilled Water plant (3X8.25TR)
All as per item here-in-before but for Chilled Water plant (2x50TR)
All as per item here-in-before but for A/C Plant 4 x 8.75 TR + 2 x 8.75 TR at Signal Section
Suppy and fix in repair PVC insulated and FR PVC round sheathed, copper conductor (flexible) industrial cable,1100 volt, conforming to IS:694 of size 3 core and 10 sq mm with saddel inside flexible conduit complete all as specified and as directed.
Supply & installation of MVPD-EC Model - 80 to 440 amps with requisite control cabling enclosed inside flexible pipe complete all as specified & directed.
Supply and Fix MVPD make - Softhard Type MPD range 5-30 A Aux supply 15 VAC for Panel
Supply and Fix MVPD make- Softhard Type MPD range 5-70 A Aux supply 230 VAC for Panel
Supply and fixing in repairs electronic timer type ST 100, 240 volts 50 HZ suitable for base mounting complete all as dircted. Make : L&T.
Supply & installation of Cut Out Temperature Sensor with requisite control cabling enclosed inside flexible pipe complete all as specified & directed.
Supply & installation of VSPD2 -mini/eu,complete all as specified & directed.
Supply & installation of Sub Zero Module SZT552-P, complete all as specified & directed.
Labour only for attending complaint at water cooled chillar water central air conditioning plant of any capacity/ air cooled AC Plant/ VRF AC Plant and find out the any type of fault & rectify the same camplaint on the same day all as specified and directed by Engr in charge . Note : 1 ) Contractor will responsible to provide testing material and he also responsible to provide minor spare parts 2) Contractor will provide skilled electrician / AC Mechanic for testing and rectify of fault.
Repairs to AHU complete by opening up the side covers taking out the insulation material by scraping out cleaning the entire portion removing all dust, chemical cleaning of cooling coils and treating internal side by applying two coats of black bituminous anticorrosive paint, Insulating again internal portion with 12mm thick thermocoal sheet pasted properly with adhesive and checking & setting control panels,interlocks & setting of panel, for AC Plant capacity from 20000 cfm to 32000 cfm (including welding works with welding material replacing old nut bolts etc) complete all as specified & directed. (a) Replacement of Blower bearing -02 Nos (b) Realignment/straightening of blower Shafts-02 job
Material and labour for air balancing of AHU of capacities 20000 cfm each, including arresting leakages at ducting and balacing air flow through various air diffuser located in various rooms of RSD(L) building complete all as specified & directed.
Dismantling existing false celing (sheet metal interlocking type at New RSD(L) buiding for carring out repair of AHU carring out repairs and refixing the same after carring out necessary repairs, complete all as specified and as directed.
Supply & installation ODU controller -MVPD model no EC range 80-440 amps Make - SoftHard or Equivalent complete all as specified & directed.
Supply & Fix in replacment of HRC Fuse 63 AMP Fuselink HF 63A Cylindrical complete all as directed.
Supply & Fix in replacment of HRC Fuse 400 AMP Fuselink HF 400A Cylindrical complete all as directed.
Supply & Fix in replacment of Indication Lamp R-Y-B Set complete all as directed.
Supply & Fix in replacment of Push Button in Red/Blue/Yellow complete all as directed.
M&L for disconnecting electrical connections of motor located at the top of Cooling Tower, keep cables at safe custody for reconnection and dismantling and taking out fan blade assembly along with motor mounted on base frame at the top of cooling tower after cutting/dismentaling all nuts, bolts and fixtures from the mounting frame and removing whole assembly including motor and base frame from the top of cooling tower with the help of T&P for servicing of cooling tower suitable for following capacity including following complete :- (Note :- Cleanings and General maintenance shall be carried out once in a month. (i) Cleaning / scrapping of inner & outer surface of FRP basin, repair of damaged portion if any incuding FRP lining of all surfaces joints to avoid leakage including replacement of all nuts and bolts joining all parts of Basin complete. (ii) Servicing cooling tower through cleaning re-agent complete pipe line, including servicing of cooling tower motor and fan and make the necessary alignment with motor. (iii) Replacement of bearing if any of suitable cap if any after necessory work including greasing and replacement of nut bolts and preventing leakage if any by means of suitable adetives etc all as directed and specified. (iv) Taking out PVC fills blocks, cleaning and refixing as per existing location and channel direction. (v) Servicing of spray header and sprinkler assy complete. (vi) Repair of water strainer complete. Cooling Tower of 3X150TR plant at New RSDL and Old RSDL,
All as per Item above but Cooling Tower of 2X50 TR Plant at RSDM
All as per Item above Cooling tower of 3X8.25 TR Plant signal section, (Note For item No 179 to 181: Contractor shall submit Monthly general servicing report duly signed by the contractors rep, Concerned JE & Engr-in-charge. For not carrying general servicing a penalty of twice the quoted rate will be recovered from the contractor.) Major items for repair shall be paid under relevant items of this schedule.
Supply & Fix in repair Butterfly valve wafer type 65 mm PN-1.0/1.6 made up of SG iron, without Lugs, Lever operated, SG iron Disc, Nitrile /Rubber lining/Neoprene lining,Test pressure Art No 1078 of Make: Zoloto or Equivalent in kirloskar, complete all as specified and directed Note : Rates quoted shall be deemed to include for cutting existing 65 mm MS pipe to accomodate butterfly valve, inserting suitable flanges, rubber gaskets, nuts bolts, making necessary welding work & testing the pipeline for trouble free operation complete all as directed.following size :- 65mm bore
All as per item above but 80mm bore
All as per item above but 100mm bore
M & L in repair of Gun-metal, Globe or Gate valves, with iron wheel head, screwed both ends for iron pipe and fixed globe valve cast copper alloy to match with the existing of following size including cutting welding/brazing required if any all as required at site. 15 mm bore
All as per item above but 25 mm bore
All as per item above but 40 mm bore
Supply only in repairs of thermal expansion valve suitable for 2X 50 TR Chilled water Central type AC plant system all as per sample, including brazing at both ends all as required and directed.
Supply only in repairs of thermal expansion valve suitable for 3X150 TR Chilled water Central type AC plant system all as per sample, including brazing at both ends all as required and directed.
Supply only in replacement of Wet & Dry Bulb thermometer of A/C Plant Room.
Supply only in repairs Single Phase Preventor in electric panel board of central type AC plants all as per direction of Eng-in-charge.
Supply only in repairs pilot solenoid valve assembly for central type AC plant as per sample complete all as directed.
Material & Labour for Quarterly Maintenance,and cleaning of the following including sprinkler nozzles blower, fins of filters etc in the suction blower room of AOS-23 Painting Shop, complete all as specified & as directed. (a) Exhaust Blower – 02 Nos (b) Exhaust Blower with water sprinkler system- 02 Nos. (c) Force in blower - 02 Nos (d) Pump Sets - 02 Nos (e) Spray Nozzles Assembly (01 Set of 64 Nozzles) - 02 sets (Note: Contractor shall submit Monthly general servicing report duly signed by the contractors rep, Concerned JE & Engr-in-charge. For not carrying general servicing a penalty of twice the quoted rate will be recovered from the contractor.) Major items for repair shall be paid under relevant items of this schedule..)
Dismantling suction blower of Make: Patel Airtemp Pvt. Ltd, Model No CFPB100DIDW, from its existing position, dis-connecting the same from bearing and shaft by removing key, replacement of worn out shaft of length 1 meter dia 75 mm (collar dia 57 mm) of High alloy steel of grade EN-08, blowing out dust, chemical cleaning by spraying the organic based scale removing agent as approved at the appropriate ratio till the removal of complete dust and scale, greasing of blower, checking of electrical connection, replacement of unserviceable pedestal bearing-02 nos, renewel of rusted MS screw, applying 2 coats of synthetic enamel paint over a coat of primer, fixing the shaft with blower making proper balancing and alignment of blower with motor and testing blower for smooth running all as specified and directed.
Supply and fix DOL starter for 3 phase electric motor in steel sheet enclosure MK-I cat No SS96211 of L&T Make or equivalent in Siemens/ ABB
Material & Labour for removal of existing Unservicable damaged insulation from chilled water pipe as mentioned below and M&L for cleaning the pipe surface (to be insulated) by scrapping carefully with wire brush etc. to make the surface completely free of millscale, dirt, dust, grease and other foreign materials, taking special care so that all Pipe joints are sealed against any leakage. replace with water pipe insulation half section PUF insulation shall bond to the surface of pipe with adhesive & binded with metal binding wire further insulation should be covered with fibre glass clothing and finally be finished with zylon base weather proof coating with two coats of AC ducting E 96 (Fevicol Make) as under: . Note:- (a) The adhesive shall be used for bonding the seams securely together including butt & logitudinal joints, fittings and coverings must be closed with adhesive. (b) The adhesive shall be specially formulated for the pipe insulation applicationand supplied by the insulatin manufacturer and have excellent bonding to porousand non porous surfaces. for 32 mm Dia.
All as per Item here in above but 40 mm Dia
All as per Item here in above but 50mm Dia
All as per Item here in above but 65mm Dia
All as per Item here in above but 80mm Dia
All as per Item here in above but 100mm dia.
All as per Item here in above but 125 mm Dia
Supply and fix sprinkler assembly of cooling tower 150 TR including taking down of existing and setting plant operational within 24 hours of breakdown material to be bought to match with the existing site and approved by GE, Complete all as specified and as directed by Enginner-in-charge.
Suply and fix sprinkler assembly of cooling tower 100 TR including taking down of existing and setting plant operational within 24 hours of breakdown material to be bought to match with the existing site and approved by GE, Complete all as specified and as directed by Enginner-in-charge.
Suplly and fix sprinkler assembly of cooling tower 8.25 TR including taking down of existing and setting plant operational within 24 hours of breakdown material to be bought to match with the existing site and approved by GE, Complete all as specified and as directed by Enginner-in-charge.
Supply and fix tyre coupling to match with the existng to make coupling for the pump motor set, complete all as specified and as directed by the Engineer-in-charge.
Supply and Fix fan blade set for cooling tower capacity 100 TR make - Delta as per existing make and site requirment all as specified and directed by Engr - in - Charge.
Supply and Fix fan blade set for cooling tower capacity 300 TR make - Delta as per existing make and site requirment all as specified and directed by Engr - in - Charge.
S& F in replacment of Float valve (brass) 25MM complete all as directed.
Supply only Ball / Roller bearing for Sprinlkler top and bottom Hub for Central AC Plant complete all as directed.
Material & Labour for laying MS pipe in repair of 150 mm dia Heavy grade (C Class) in trench/surface including necessary cutting,welding/fabrication work & including suitable size SS304 Nut bolts to connect MS flanges, complete all as specified and as directed by Engineer In Charge.
Supply and fixing in Repair power assembly expansion valve for AC plant complete all as specified and directed Make –SPORLAN or equivalent as per the existing.
Disconnecting the electrical and mechanical connection of burnt electrical motors of blower from the existing site / location, transporting to and return back from work shop. Rewinding of electrical motors by dismantling and removing the burnt copper winding wire, cleaning the slots of stator with petrol and brushes, winding polyster based super enamelled copper wire of same gauge of original one with proper class of insulation including varnishing and heating the coil and remove air bubbles complete stator / roter after rewinding reassembling all parts including re-installing connection to original position and testing on full load all as directed by Engineer -in -charge for different capacity of motor as per following :- (i) 150x3 TR plant (ii) 50X2 TR plant (Note : Complaint should be attended within 24 ours & to be rectified within 72 Hours failing which a penalty of 200/ complaint/ Hour will be recovered from contractor.)
Supply & fixing in replacement of box type, fine filter for AHU's made out of HDPE, non woven synthetic media duly washable and assembled in fully sealed anodised aluminium/GI frame, having efficiency 95% down to 10 micron of following sizes:- frame of size 600 x 600 x 50, 550 x 550 x 50 & 500 x 500 x 50mm
All as per item here-in-before but frame of size 600x300x50
SHRI SULAI ELECTRICALS
Shree Sai Samarth Enterprises
BHAVIN INFRA
AIRDOT ENGINEERING
DIAMOND ENTERPRISES
K R Electricals
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .