Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.0 LAccepted-AOC SALBAGAN ROAD BENACHITY DURGAPUR BARDHAMAN BARDHAMAN 713213 WEST BENGAL INDIA | DURGAPUR | BARDHAMAN | WEST BENGAL | 713213 | L1 | Accepted-AOC TC recommendation | |
| 2 | L2₹20.1 L+₹10,484.30 (0.52%)Rejected-Finance | L2 | Rejected-Finance TC recommendation | |
| 3 | L3₹21.8 L+₹1.8 L (9.09%)Rejected-Finance KHOITADIH PROJECT BILPAHARI BARDHAMAN BARDHAMAN 713378 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713378 | L3 | Rejected-Finance TC recommendation |
Tender Value
₹19.5 L
EMD Value
₹24,400
Closing Date
21 Feb 2023, 6:00 pmClosed
General Manager Bankola Area
Office of The General Manager Bankola Area, PIN-713363
Installation of Lancashire Boiler after shifting from Kumardihi B Colliery to Kumardihi A Colliery with Civil and Refectory Work, Steam and Feed Pipe Line, Commissioning and Removing of Old and Damaged Lancashire Boiler No. WBL 6281 at Kumardihi A
2023_ECL_270790_1
ECL/GM/BA/E TENDER/22-23/Enm/135 Dt. 11.02.2023
Open Tender
Electrical and Maintenance Works
Item Rate
90 days
Kumardihi A Colliery
Please refer to NIT document
6 documents required · 6 mandatory
₹24,400
18 Aug 2023
11 Feb 2023
22 Feb 2023
11 Feb 2023
21 Feb 2023
11 Feb 2023
11 Feb 2023 - 15 Feb 2023
Amount
Item Description/ Heading
Dismantling of boiler shed at Kumardihi-’B’ by removing of G.I sheet Parlings, steel structure etc & deposit the same at colliery store
Dismantling of all the covering bricks, curv arch, foundation block, side wall & all other covered area of the L/boiler, lifting of the boiler on 300mm ISMB & make ready to facilate the thickness measuring of boiler
Through cleaning of L/boiler inside & outside of the boiler removing of all the accessories from the boiler body etc and make ready for thickness measuring of shell plate
Thickness measuring of boiler by ultrasonic thickness measuring guge & conducting the dry inspection of the boiler
Lifting of L/boiler from foundation to Tailor/arresting the same and transportation of the boiler from Kumardihi-’B’ to Kumardihi-’A’ Colliery .
Installation of boiler on new foundation at Kumardihi-’A’ Colliery, alignment and make ready for covering the boiler
Higher charges of 90 tone crawler crain and tailor for shifting of the boiler from Kumardihi-’B’ to Kumardihi-’A’ colliery
Installation of steam & feed pipe line of boiler, hydraulic test of the same including the cost of nuts & bolts, steam joint, fabrication of support for the pipe line & necessary blow down pipe line of the boiler
Preparation of drawing for steam & feed pipe line, approval of drawing from director of boilers, W.B. kolkata
Statutory charges for approval of drawing, lab test of steam & feed pipe, submission of from III A.
Getting approval from director of boilers for conducting the job under regulation 392 of IBR
Processing of papers for transfer of ownership Agent, Kumardihi-’B’ colliery to Agent Kumardihi-’A’ Colliery
Labour charges for renovating the foundation including covering of the boiler & connection of chimney
4" seamless steam pipe ASTM A-106 grade “B” with IBRTC
2" steam pipe -do-
6" Steam Flange table F
4" Steam Flange table F
2" Steam Flange table F
4" Seamless steam bend with T. C.
2" Seamless steam bend with T. C.
6x4 Seamless steam reducer
4" Non return valve flange type with TC
2" Steam stop valve flange type with T. C.
2" Non return valve flange with T. C.
A) Fire Bricks (for making new foundation)
Fire Clay (for making new foundation)
Normal class - 1 bricks (for making new foundation)
Curve arch (for making new foundation)
Foundation block (for making new foundation)
Cement (for making new foundation)
Sand (for making new foundation)
Stone Chips (for making new foundation)
Dismantling of boiler shed at Kumardihi-’A’ colliery with removing of G-I sheet, sheet structure etc & deposit the same at colliery store
Dismantling of all the covering bricks, curve arch, foundation block & all other materials to facilate the removing of old & damge L/boiler
LiGing of the L/boiler from foundation to tailor & arising the same & shiGing the boiler at collirey side as per instruction of colliery management
Higher charges of 90 tone crawler crain and tailor for shiGing of the old & damaged L/boiler from foundation to sweet able distance at Kumardihi-’A’ Colliery
Total impact of GST for the purpose of CTC
GT ENTERPRISE
BABLU SINHA
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .