Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.2 LAccepted-AOC | ₹3.2 L | L1 | Accepted-AOC AWARD OF WORK TO L1 BIDDER AND REJECT L2 AND L3 BIDDER DUE TO NOT L1 BIDDER |
| 2 | Rejected-Technical SIMPLEX COLONY JAYANT P O JAYANT DIST SINGRAULI M P PIN 486890 | JAYANT | SINGRAULI | MADHYA PRADESH | 486890 | - | - | Rejected-Technical NOT L1 BIDDER |
| 3 | Rejected-Technical | - | - | Rejected-Technical NOT L1 BIDDER |
| Sl No | Description | Qty | Unit | UMESH ENTERPRISES L3 | M/s A.K. Chaubey L2 | M/S R.K. ENTERPRISES L1 |
|---|---|---|---|---|---|---|
| 1.00Scope of Work/Technical Specifications etc: A. Fabrication of working stand (Size 7'x 5' x 4') 1. Steel pipe - 3" provided by contractor. 2. Cutting of MS Plate, steel pipe a per requires size for Fabrication of working stand. 3. Fabrication of stand with wheel bracket, railing and ladder. 4. Welding of complete working stand. 5. Painting of working stand. Note: The maximum deployment of manpower for the above job will be as 1. Skilled Welder for 07 nos. manshifts, 2. Skilled Fitter for 07 nos. manshift and 3. Un-Skilled man for 07 nos. manshifts. B. Fabrication of Oil Collecting trolley (36"x42"x13") 1. Cutting of MS Plate, Angle as per requires size for Fabrication of Oil Collecting trolley. 2. Fabrication of Oil Collecting trolley with wheel bracket. 3. Welding of complete Oil Collecting trolley. 4. Painting of Oil Collecting trolley. Note: The maximum deployment of manpower for the above job will be as 1. Skilled Welder for 06 nos. manshifts, 2. Skilled Fitter for 06 nos. manshift and 3. Un-Skilled man for 06 nos. manshifts. C. Fabrication of Gas Collecting trolley (6.5'x3.5'x2.5') 1. Cutting of MS Plate, Angle as per requires size for Fabrication of Gas Collecting trolley. 2. Fabrication of Gas Collecting trolley with wheel bracket. 3. Welding of complete Gas Collecting trolley. 4. Painting of Gas Collecting trolley. Note: The maximum deployment of manpower for the above job will be as 1. Skilled Welder for 05 nos. manshifts, 2. Skilled Fitter for 05 nos. manshift and 3. Un-Skilled man for 05 nos. manshifts. D. Fabrication of oil tray(48"x48"x8") 1. Cutting of MS Plate, Angle as per requires size for Fabrication of oil tray. 2. Fabrication of oil tray. 3. Welding of complete oil tray. 4. Painting of oil tray. Note: The maximum deployment of manpower for the above job will be as 1. Skilled Welder for 03 nos. manshifts, 2. Skilled Fitter for 03 nos. manshift and 3. Un-Skilled man for 03 nos. manshifts. | ||||||
| 2.00Charges for the Fabrication and painting of working stand (Size 7'x 5' x 4'). | ||||||
| 2.10 | Labour charges including contractor profit. | 8 | Job | 12,000 ₹96,000 | 7,500 ₹60,000 | 6,500 ₹52,000 |
| 2.20 | Cost of Steel Pipe - 3" | 800 | Kg | 60 ₹48,000 | 90 ₹72,000 | 169.62 ₹1.4 L |
| 2.30 | Charges of complete Painting of structure Note: It will require- Primer-03ltr, Paint-03ltr, Thinner-05ltr | 8 | Job | 2,000 ₹16,000 | 1,000 ₹8,000 | 900 ₹7,200 |
| 2.40 | Hiring charges of welding machine | 56 | Days | 100 ₹5,600 | 50 ₹2,800 | 100 ₹5,600 |
| 2.50 | Hiring charges of grinding machine with wheel | 56 | Days | 100 ₹5,600 | 50 ₹2,800 | 100 ₹5,600 |
| 2.60 | Hiring charges of gas cutting set & Accessories | 56 | Days | 100 ₹5,600 | 50 ₹2,800 | 100 ₹5,600 |
| 3.00Charges for Fabrication of and painting Oil Collecting trolley (36"x42"x13") | ||||||
| 3.10 | Labour charges including contractor profit. | 5 | Job | 12,000 ₹60,000 | 14,000 ₹70,000 | 3,000 ₹15,000 |
Tender Value
₹6.6 L
EMD Value
₹8,300
Closing Date
20 Oct 2025, 11:00 amClosed
GENERAL MANAGER EXCAVATION, NCL KHADIA PROJECT
NCL KHADIA PROJECT, SHAKTINAGAR, SONEBHADRA, U.P. -231222
Fabrication of working stand, oil collecting trolley, gas collecting trolley and oil tray in NWS Khadia.
2025_NCL_345118_1
KHD/G.M. (Excv)/E-Tender/25-26/711
Open Tender
Excavation Department Work
60 days
NCL KHADIA PROJECT, SHAKTINAGAR
Please refer Tender documents.
6 documents required · 6 mandatory
₹8,300
5 Feb 2026
6 Oct 2025
21 Oct 2025
6 Oct 2025
20 Oct 2025
7 Oct 2025
6 Oct 2025 - 14 Oct 2025
Amount
Scope of Work/Technical Specifications etc: A. Fabrication of working stand (Size 7'x 5' x 4') 1. Steel pipe - 3" provided by contractor. 2. Cutting of MS Plate, steel pipe a per requires size for Fabrication of working stand. 3. Fabrication of stand with wheel bracket, railing and ladder. 4. Welding of complete working stand. 5. Painting of working stand. Note: The maximum deployment of manpower for the above job will be as 1. Skilled Welder for 07 nos. manshifts, 2. Skilled Fitter for 07 nos. manshift and 3. Un-Skilled man for 07 nos. manshifts. B. Fabrication of Oil Collecting trolley (36"x42"x13") 1. Cutting of MS Plate, Angle as per requires size for Fabrication of Oil Collecting trolley. 2. Fabrication of Oil Collecting trolley with wheel bracket. 3. Welding of complete Oil Collecting trolley. 4. Painting of Oil Collecting trolley. Note: The maximum deployment of manpower for the above job will be as 1. Skilled Welder for 06 nos. manshifts, 2. Skilled Fitter for 06 nos. manshift and 3. Un-Skilled man for 06 nos. manshifts. C. Fabrication of Gas Collecting trolley (6.5'x3.5'x2.5') 1. Cutting of MS Plate, Angle as per requires size for Fabrication of Gas Collecting trolley. 2. Fabrication of Gas Collecting trolley with wheel bracket. 3. Welding of complete Gas Collecting trolley. 4. Painting of Gas Collecting trolley. Note: The maximum deployment of manpower for the above job will be as 1. Skilled Welder for 05 nos. manshifts, 2. Skilled Fitter for 05 nos. manshift and 3. Un-Skilled man for 05 nos. manshifts. D. Fabrication of oil tray(48"x48"x8") 1. Cutting of MS Plate, Angle as per requires size for Fabrication of oil tray. 2. Fabrication of oil tray. 3. Welding of complete oil tray. 4. Painting of oil tray. Note: The maximum deployment of manpower for the above job will be as 1. Skilled Welder for 03 nos. manshifts, 2. Skilled Fitter for 03 nos. manshift and 3. Un-Skilled man for 03 nos. manshifts.
Charges for the Fabrication and painting of working stand (Size 7'x 5' x 4').
Labour charges including contractor profit.
Cost of Steel Pipe - 3"
Charges of complete Painting of structure Note: It will require- Primer-03ltr, Paint-03ltr, Thinner-05ltr
Hiring charges of welding machine
Hiring charges of grinding machine with wheel
Hiring charges of gas cutting set & Accessories
Charges for Fabrication of and painting Oil Collecting trolley (36"x42"x13")
Labour charges including contractor profit.
Charges of complete Painting of structure Note: It will require- Primer-03ltr, Paint-03ltr, Thinner-05ltr
Hiring charges of welding machine
Hiring charges of grinding machine with wheel
Hiring charges of gas cutting set & Accessories
Charges for Fabrication of and painting Gas Collecting trolley (6.5'x3.5'x2.5')
Labour charges including contractor profit.
Charges of complete Painting of structure Note: It will require- Primer-03ltr, Paint-03ltr, Thinner-05ltr
Hiring charges of welding machine
Hiring charges of grinding machine with wheel
Hiring charges of gas cutting set & Accessories
Charges for Fabrication of and painting of oil tray (48"x48"x8")
Labour charges including contractor profit.
Charges of complete Painting of structure Note: It will require- Primer-1.5ltr, Paint-1.5ltr, Thinner-2.5ltr
Hiring charges of welding machine
Hiring charges of grinding machine with wheel
Hiring charges of gas cutting set & Accessories
Total impact of GST for the purpose of CTC
M/s A.K. Chaubey (BID ID -1191301)
UMESH ENTERPRISES (BID ID -1189656)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_357768.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.95 MB
ITB.pdf
Tender Documents • 0.19 MB
COC_ATC.pdf
Tender Documents • 0.75 MB
Annexures.pdf
Tender Documents • 0.91 MB
BOQ_357768.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid