| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹9.0 LAccepted-AOC | ₹9.0 L | 1 | Accepted-AOC Accept |
| 2 | 2₹9.3 L+₹32,026 (3.57%)Rejected-Finance A 51 SHALIMAR GARDEN EX 2 SAHIBABAD DISTRICT GHAZIABAD UTTAR PRADESH | SAHIBABAD | GHAZIABAD | UTTAR PRADESH | ₹9.3 L+₹32,026 (3.57%) | 2 | Rejected-Finance 2 |
| 3 | 3₹9.4 L+₹44,376 (4.95%)Rejected-Finance | ₹9.4 L+₹44,376 (4.95%) | 3 | Rejected-Finance 3 |
| 4 | 4₹9.4 L+₹47,866 (5.34%)Rejected-Finance | ₹9.4 L+₹47,866 (5.34%) | 4 | Rejected-Finance 4 |
| 5 | 5₹9.7 L+₹72,026 (8.03%)Rejected-Finance | ₹9.7 L+₹72,026 (8.03%) | 5 | Rejected-Finance 5 |
| Sl No | Description | Qty | Unit | M/s Virendra Singh Contractor L1 | ARTIST BRO L2 | M/S FAIR CONSTRUCTION L5 | Dhirendra Singh Sirohi L8 | JAI LAXMI CONTRACTOR L7 | M/S PRABHAT CONTRACTOR AND ENGINEERS L3 | M/S HARSH CONSTRUCTIONS L6 | M/S RINKU CONTRACTOR L4 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work for Excavation in Foundation in all type of soil including Dressing & back filling including all cost of material, labour & T&P etc complete all as specified and as directed by Engineer-in-charge. | 338 | Cum | 68 ₹22,984 | 80 ₹27,040 | 30 ₹10,140 Lowest | 38 ₹12,844 | 50 ₹16,900 | 55 ₹18,590 | 72.8 ₹24,606.4 | 60 ₹20,280 |
| 2.00 | Cement Concrete 1:4:8 in Foundation with Cement, Course Sand, Crushed Stone Grit 22.5 to 45 mm with all cost of material, labour & T&P etc complete all as specified and as directed by Engineer-in-charge. | 39 | Cum | 3,900 ₹1,52,100 Lowest | 4,000 ₹1,56,000 | 3,900 ₹1,52,100 Lowest | 5,100 ₹1,98,900 | 4,100 ₹1,59,900 | 3,900 ₹1,52,100 Lowest | 4,368 ₹1,70,352 | 5,000 ₹1,95,000 |
| 3.00 | Ist Class Brick Work M-100 in 1:4 C.M. with cement, Course Sand including all cost of material, labour & T&P etc complete all as specified and as directed by Engineer-in-charge. | 168.5 | Cum | 3,800 ₹6,40,300 Lowest | 4,000 ₹6,74,000 | 4,400 ₹7,41,400 | 5,240 ₹8,82,940 | 4,700 ₹7,91,950 | 4,200 ₹7,07,700 | 4,149.6 ₹6,99,207.6 | 3,800 ₹6,40,300 Lowest |
| 4.00 | 12.5 mm Thick Cement Plaster in 1:4 C.M. in with all cost of material, labour & T&P etc complete all as specified and as directed by Engineer-in-charge. | 170 | Sqm | 130 ₹22,100 | 125 ₹21,250 | 80 ₹13,600 | 170 ₹28,900 | 60 ₹10,200 Lowest | 145 ₹24,650 | 145.6 ₹24,752 | 150 ₹25,500 |
| 5.00 | C.C. 1:1.5:3 on R/Wall with cement, coarse sand,Crushed stone grit 10 to 25 mm including Cost of all Material Labour and T&P etc complete all as specified and as directed by Engineer-in-charge. | 3.5 | Cum | 5,000 ₹17,500 Lowest | 5,500 ₹19,250 | 5,800 ₹20,300 | 6,750 ₹23,625 | 6,000 ₹21,000 | 5,300 ₹18,550 | 5,387.2 ₹18,855.2 | 7,000 ₹24,500 |
| 6.00 | Earth Work in Back Filling including lead upto 200M & lift upto 1.5M including dressing, ramming by Manual Labour or Machine including all Cost of Material, Labour & T&P etc complete all as specified and as directed by Engineer-in-charge. | 390 | Cum | 107 ₹41,730 | 80 ₹31,200 | 80 ₹31,200 | 112 ₹43,680 | 50 ₹19,500 Lowest | 50 ₹19,500 Lowest | 109.2 ₹42,588 | 100 ₹39,000 |
Tender Value
₹13.5 L
EMD Value
₹27,000
Closing Date
7 Jan 2026, 12:00 pmClosed
Executive Engineer
U.M.B.D.G.C.KHURJA
Construction of Retaining Wall
2025_UPIDC_1103145_7
13/EE/2025-26
Open Tender
Civil Works
Item Rate
60 days
U.M.B.D.G.C.KHURJA
Please refer Tender documents.
2 documents required · 2 mandatory
₹766
₹27,000
21 Feb 2026
1 Jan 2026
7 Jan 2026
1 Jan 2026
7 Jan 2026
1 Jan 2026
Amount
Earth work for Excavation in Foundation in all type of soil including Dressing & back filling including all cost of material, labour & T&P etc complete all as specified and as directed by Engineer-in-charge.
Cement Concrete 1:4:8 in Foundation with Cement, Course Sand, Crushed Stone Grit 22.5 to 45 mm with all cost of material, labour & T&P etc complete all as specified and as directed by Engineer-in-charge.
Ist Class Brick Work M-100 in 1:4 C.M. with cement, Course Sand including all cost of material, labour & T&P etc complete all as specified and as directed by Engineer-in-charge.
12.5 mm Thick Cement Plaster in 1:4 C.M. in with all cost of material, labour & T&P etc complete all as specified and as directed by Engineer-in-charge.
C.C. 1:1.5:3 on R/Wall with cement, coarse sand,Crushed stone grit 10 to 25 mm including Cost of all Material Labour and T&P etc complete all as specified and as directed by Engineer-in-charge.
Earth Work in Back Filling including lead upto 200M & lift upto 1.5M including dressing, ramming by Manual Labour or Machine including all Cost of Material, Labour & T&P etc complete all as specified and as directed by Engineer-in-charge.
ARTIST BRO (BID ID -5791306)
M/S PRABHAT CONTRACTOR AND ENGINEERS (BID ID -5792115)
M/S RINKU CONTRACTOR (BID ID -5789800)
M/S FAIR CONSTRUCTION (BID ID -5791972)
M/S HARSH CONSTRUCTIONS (BID ID -5792466)
JAI LAXMI CONTRACTOR (BID ID -5792523)
Dhirendra Singh Sirohi (BID ID -5792502)
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.24 MB
BOQ_2034310.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .