Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹9.0 LAccepted-AOC | ₹9.0 L | 1 | Accepted-AOC Accept |
| 2 | 2₹9.3 LRejected-Finance A 51 SHALIMAR GARDEN EX 2 SAHIBABAD DISTRICT GHAZIABAD UTTAR PRADESH | SAHIBABAD | GHAZIABAD | UTTAR PRADESH | ₹9.3 L | 2 | Rejected-Finance 2 |
| 3 | 3₹9.4 LRejected-Finance | ₹9.4 L | 3 | Rejected-Finance 3 |
| 4 | 4₹9.4 LRejected-Finance | ₹9.4 L | 4 | Rejected-Finance 4 |
| 5 | 5₹9.7 LRejected-Finance | ₹9.7 L | 5 | Rejected-Finance 5 |
| Sl No | Description | Qty | Unit | M/s Virendra Singh Contractor L1 | ARTIST BRO L2 | M/S FAIR CONSTRUCTION L5 | Dhirendra Singh Sirohi L8 | JAI LAXMI CONTRACTOR L7 | M/S PRABHAT CONTRACTOR AND ENGINEERS L3 | M/S HARSH CONSTRUCTIONS L6 | M/S RINKU CONTRACTOR L4 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work for Excavation in Foundation in all type of soil including Dressing & back filling including all cost of material, labour & T&P etc complete all as specified and as directed by Engineer-in-charge. | 338 | Cum | 68 ₹22,984 | 80 ₹27,040 | 30 ₹10,140 | 38 ₹12,844 | 50 ₹16,900 | 55 ₹18,590 | 72.8 ₹24,606.4 | 60 ₹20,280 |
| 2.00 | Cement Concrete 1:4:8 in Foundation with Cement, Course Sand, Crushed Stone Grit 22.5 to 45 mm with all cost of material, labour & T&P etc complete all as specified and as directed by Engineer-in-charge. | 39 | Cum | 3,900 ₹1,52,100 | 4,000 ₹1,56,000 | 3,900 ₹1,52,100 | 5,100 ₹1,98,900 | 4,100 ₹1,59,900 | 3,900 ₹1,52,100 | 4,368 ₹1,70,352 | 5,000 ₹1,95,000 |
| 3.00 | Ist Class Brick Work M-100 in 1:4 C.M. with cement, Course Sand including all cost of material, labour & T&P etc complete all as specified and as directed by Engineer-in-charge. | 168.5 | Cum | 3,800 ₹6,40,300 | 4,000 ₹6,74,000 | 4,400 ₹7,41,400 | 5,240 ₹8,82,940 | 4,700 ₹7,91,950 | 4,200 ₹7,07,700 | 4,149.6 ₹6,99,207.6 | 3,800 ₹6,40,300 |
| 4.00 | 12.5 mm Thick Cement Plaster in 1:4 C.M. in with all cost of material, labour & T&P etc complete all as specified and as directed by Engineer-in-charge. | 170 | Sqm | 130 ₹22,100 | 125 ₹21,250 | 80 ₹13,600 | 170 ₹28,900 | 60 ₹10,200 | 145 ₹24,650 | 145.6 ₹24,752 | 150 ₹25,500 |
| 5.00 | C.C. 1:1.5:3 on R/Wall with cement, coarse sand,Crushed stone grit 10 to 25 mm including Cost of all Material Labour and T&P etc complete all as specified and as directed by Engineer-in-charge. | 3.5 | Cum | 5,000 ₹17,500 | 5,500 ₹19,250 | 5,800 ₹20,300 | 6,750 ₹23,625 | 6,000 ₹21,000 | 5,300 ₹18,550 | 5,387.2 ₹18,855.2 | 7,000 ₹24,500 |
| 6.00 | Earth Work in Back Filling including lead upto 200M & lift upto 1.5M including dressing, ramming by Manual Labour or Machine including all Cost of Material, Labour & T&P etc complete all as specified and as directed by Engineer-in-charge. | 390 | Cum | 107 ₹41,730 | 80 ₹31,200 | 80 ₹31,200 | 112 ₹43,680 | 50 ₹19,500 | 50 ₹19,500 | 109.2 ₹42,588 | 100 ₹39,000 |
Tender Value
₹13.5 L
EMD Value
₹27,000
Closing Date
7 Jan 2026, 12:00 pmClosed
Executive Engineer
U.M.B.D.G.C.KHURJA
Construction of Retaining Wall
2025_UPIDC_1103145_7
13/EE/2025-26
Open Tender
Civil Works
60 days
U.M.B.D.G.C.KHURJA
Please refer Tender documents.
2 documents required · 2 mandatory
₹766
₹27,000
21 Feb 2026
1 Jan 2026
7 Jan 2026
1 Jan 2026
7 Jan 2026
1 Jan 2026
Amount
Earth work for Excavation in Foundation in all type of soil including Dressing & back filling including all cost of material, labour & T&P etc complete all as specified and as directed by Engineer-in-charge.
Cement Concrete 1:4:8 in Foundation with Cement, Course Sand, Crushed Stone Grit 22.5 to 45 mm with all cost of material, labour & T&P etc complete all as specified and as directed by Engineer-in-charge.
Ist Class Brick Work M-100 in 1:4 C.M. with cement, Course Sand including all cost of material, labour & T&P etc complete all as specified and as directed by Engineer-in-charge.
12.5 mm Thick Cement Plaster in 1:4 C.M. in with all cost of material, labour & T&P etc complete all as specified and as directed by Engineer-in-charge.
C.C. 1:1.5:3 on R/Wall with cement, coarse sand,Crushed stone grit 10 to 25 mm including Cost of all Material Labour and T&P etc complete all as specified and as directed by Engineer-in-charge.
Earth Work in Back Filling including lead upto 200M & lift upto 1.5M including dressing, ramming by Manual Labour or Machine including all Cost of Material, Labour & T&P etc complete all as specified and as directed by Engineer-in-charge.
ARTIST BRO (BID ID -5791306)
M/S PRABHAT CONTRACTOR AND ENGINEERS (BID ID -5792115)
M/S RINKU CONTRACTOR (BID ID -5789800)
M/S FAIR CONSTRUCTION (BID ID -5791972)
M/S HARSH CONSTRUCTIONS (BID ID -5792466)
JAI LAXMI CONTRACTOR (BID ID -5792523)
Dhirendra Singh Sirohi (BID ID -5792502)
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.24 MB
BOQ_2034310.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid